Results:
Tag: Huntington District
Clear
  • April

    2024 Huntington District Campground Schedule

    Campers may now make their reservations 180 days in advance and picnic shelter reservations 360 days in advance. Recreation.gov is taking reservations at this toll free telephone number, 1-877-444-6777. Campers can also make reservations on the Web at http://www.recreation.gov/.
  • January

    Sutton Lake

    Sutton Lake was authorized by Section 4 of Flood Control Act of 1938. Primary project purposes are flood damage reduction, low flow augmentation and recreation. The dam was completed in June 1960 and serves a drainage area of 537 square miles. The lake is impounded by a concrete gravity dam, 210 ft. high and 1,178 ft. long, with a gated spillway located in the channel section of the dam.  Spillway has a 50 ft. radius bucket and six tainter gates, hydraulically operated from a gallery in the dam, supported by 8 ft. piers.
  • Summersville Lake

    Summersville Dam was authorized by Section 4 of Flood Control Act of 1938. The primary project purposes are flood risk management, fish and wildlife enhancement, water quality, recreation, and low flow augmentation. The dam was completed in 1966 and serves a drainage area of 803 square miles. The dam is on the Gauley River near the town of Summersville in Nicholas County, WV, and controls a drainage area of 803 square miles.
  • R.D. Bailey Lake

    R.D. Bailey Lake was authorized by Section 203 of Flood Control Act of 1962. The primary project purposes are flood risk management, water quality and recreation. The dam was completed in 1980 and serves a drainage area of 540 square miles. The lake is impounded by a rock and random-fill dam with a concrete face and an uncontrolled broad-crested saddle spillway.
  • East Lynn Lake

    East Lynn Lake is located on the East Fork of Twelvepole Creek, 10 miles south of Wayne, WV, on State Route 37. East Lynn Lake was constructed primarily for flood control, water quality, fish management, and recreation. There is a total of 24,821 acres of project lands and waters at East Lynn.
  • Burnsville Lake

    Burnsville Lake was authorized by Section 4 of Flood Control Act of 1938. The primary project purposes are recreation, flood risk management, fish and wildlife, and water quality control. The dam was completed in January 1976 and serves a drainage area of 165 square miles. The lake is impounded by rock-fill embankment and impervious core dam, 89 ft. high and 1,400 ft. long.
  • Bluestone Lake

    Bluestone Lake was authorized by Section 5 of the Flood Control Act of 1936, amended by section 4 of the FCA of 1938. The primary project purposes are flood risk management, fish and wildlife enhancement, recreation, and low flow augmentation. The dam was completed in December 1947 and serves a drainage area of 4,603 square miles.
  • Beech Fork Lake

    Beech Fork Lake (authorized by the Flood Control Act of 1962) is part of the integrated flood reduction system operated by the Corps of Engineers for the entire Ohio River Basin. When these lakes are operated as a vast storage system, flood crests along the Ohio can be significantly reduced.
  • North Fork of Pound River Lake

    North Fork of Pound River Lake  was authorized by Section 4 of Flood Control Act of 1938. Primary project purposes are flood risk reduction, water supply, fish and wildlife enhancement, and recreation. Dam was completed in January 1966 and serves a drainage area of 17.2 square miles.
  • John W. Flannagan Dam & Reservoir

    Authorized by Congress in the Flood control Act of 1938, and the Federal Water Pollution Control Act Amendments of 1961, John W. Flannagan Dam and Reservoir is a part of the Big Sandy flood protection system. The U.S. Army Corps of Engineers designed and supervised construction of the dam and now operates it for public benefits.
  • Wills Creek Lake

    Wills Creek Lake serves as the Project Office for the projects located within the Lower Tuscarawas section of the Muskingum Area.  Wills Creek Lake was authorized by Section 4 of the Flood Control Act (FCA) of 1938, as amended by Section 4 of the FCA of 1939. Primary project purposes are flood damage reduction, recreation, and fish and wildlife.  The dam was completed in June 1936 and serves a drainage are of 724 square miles.
  • Tom Jenkins Dam

    Tom Jenkins Dam  was completed in February 1950 and serves a drainage area of 32.8 square miles. The lake is impounded by a rolled earth dam, 84 ft. tall and 560 ft. long, with an uncontrolled saddle spillway near the left abutment of the dam. The outlet works include three sluice gates that discharge through a horseshoe tunnel through the left abutment of the dam into a stilling basin.
  • Senecaville Lake

    Senecaville Lake is within the Lower Tuscarawas section of the Muskingum Area. It was authorized by Section 4 of the Flood Control Act (FCA) of 1938, as amended by Section 4 of the FCA of 1939. Primary project purposes are flood damage reduction, recreation, and fish and wildlife.
  • Pleasant Hill Lake

    Pleasant Hill Dam is within the Walhonding section of the Muskingum Area. It was authorized by Section 4 of the Flood Control Act (FCA) of 1938, as amended by Section 4 of the FCA of 1939. Primary project purposes are flood damage reduction, recreation, and fish and wildlife. The dam was completed in May 1937 and serves a drainage area of 197 square miles. Land includes 64 fee acres and 4,236 easement acres.
  • Piedmont Lake

    Piedmont Lake is within the Lower Tuscarawas section of the Muskingum Area. It was authorized by Section 4 of the Flood Control Act (FCA) of 1938, as amended by Section 4 of the FCA of 1939. Primary project purposes are flood damage reduction, recreation, and fish and wildlife. The dam was completed in May 1937 and serves a drainage area of 86 square miles. Land includes 111 fee acres and 6,615 easement acres. There are no Corps operated recreation areas.
  • Paint Creek Lake

    Paint Creek Dam  was authorized by Section 4 of Flood Control Act of 1938. The primary project purposes are flood risk reduction, water supply storage for Greenfield, OH, low flow augmentation, recreation, and water quality improvement for Chillicothe, OH. Land includes 9,614 fee acres and 568 flowage easement acres. There are three recreation areas at the project. The Corps of Engineers recreation areas include a day use area.
  • North Branch Kokosing River Lake

    Kokosing Dam was built by the U.S. Army Corps of Engineers for flood control, recreation and wildlife management. The lake was created by impounding the headwaters of the north branch of the Kokosing River for flood control purposes on the Upper Muskingum River Watershed. Construction began in June 1970 and was completed in May 1972. The dam has an impervious, waterproof, core with earth-fill and rip-rap rock covering.
  • Mohicanville Dam

    Mohicanville Dam is within the Walhonding section of the Muskingum Area. It was authorized by Section 4 of the Flood Control Act (FCA) of 1938, as amended by Section 4 of the FCA of 1939. Primary project purposes are flood damage reduction, recreation, and fish and wildlife.
  • Mohawk Dam

    Mohawk Dam serves as the Project Office for the projects located within the Walhonding section of the Muskingum Area. It was authorized by Section 4 of the Flood Control Act (FCA) of 1938, as amended by Section 4 of the FCA of 1939. Primary project purposes are flood damage reduction, recreation, and fish and wildlife. The dam was completed in September 1936 and serves a drainage area of 821 square miles.
  • Leesville Lake

    Leesville Lake is within the Upper Tuscarawas section of the Muskingum Area. It was authorized by Section 4 of the Flood Control Act (FCA) of 1938, as amended by Section 4 of the FCA of 1939. Primary project purposes are flood damage reduction, recreation, and fish and wildlife. The dam was completed in October 1936 and serves a drainage area of 48 square miles.
  • Dover Dam

    Dover Dam is within the Upper Tuscarawas section of the Muskingum Area. It was authorized by Section 4 of the Flood Control Act (FCA) of 1938, as amended by Section 4 of the FCA of 1939. Primary project purposes are flood damage reduction, recreation, and fish and wildlife. The dam was completed November 1938 and serves a drainage area of 1.405 square miles.
  • Dillon Lake

    Dillon Dam was completed in July 1961 and serves a drainage area of 748 square miles. The lake is impounded by a rolled earthfill impervious core dam, 118 ft. tall and 1,400 ft. long with an uncontrolled, partial concrete lined spillway near the left abutment of the dam. Primary project purposes are flood risk reduction, low flow augmentation and recreation.
  • Delaware Lake

    Delaware Lake was authorized by Section 4 of Flood Control Act of 1938. The primary project purposes are flood risk reduction, low-flow augmentation, and recreation. The lake is impounded by a rolled earthfill dam 92 ft. tall, 18,600 ft. long, 15 ft. wide at the top and 480 ft. wide at the base with a gated concrete spillway.
  • Deer Creek Lake

    Deer Creek Lake was authorized by Section 4 of Flood Control Act of 1938. The primary project purposes are flood risk reduction, fish and wildlife enhancement, recreation, and low flow augmentation. The lake is impounded by a rolled earthfill dam 93 ft. tall and 3,800 ft. long with a gated concrete spillway.
  • Clendening Lake

    Clendening Lake is within the Lower Tuscarawas section of the Muskingum Area. It was authorized by Section 4 of the Flood Control Act (FCA) of 1938, as amended by Section 4 of the FCA of 1939. Primary project purposes are flood damage reduction, recreation, and fish and wildlife. Land includes 87 fee acres and 7,214 easement acres.
  • Bolivar Dam

    Bolivar Dam is within the Upper Tuscarawas section of the Muskingum Area. It was authorized by Section 4 of the Flood Control Act (FCA) of 1938, as amended by Section 4 of the FCA of 1939. Primary project purposes are flood damage reduction, recreation, and fish and wildlife. Land includes 713 fee acres and 8,282 flowage easement acres. Corps of Engineers recreational facilities include a day use area.
  • Beach City Lake

    Beach City Lake is within the Upper Tuscarawas section of the Muskingum Area. It was authorized by Section 4 of the Flood Control Act (FCA) of 1938, as amended by Section 4 of the FCA of 1939. Primary project purposes are flood damage reduction, recreation, and fish and wildlife. Land includes 299 fee acres and 7,818 flowage easement acres. Corps of Engineers recreational facilities include a day use area.
  • Atwood Lake

    Atwood Lake serves as the Project Office for the projects located within the Lower Tuscarawas section of the Muskingum Area. It was authorized by Section 4 of the Flood Control Act (FCA) of 1938, as amended by Section 4 of the FCA of 1939.
  • Alum Creek Lake

    Alum Creek Lake was authorized by Section 203 of Flood Control Act of 1962. The primary project purposes are are flood risk reduction, water supply for the Columbus metropolitan area, fish and wildlife, and recreation. The lake is impounded by a rolled earthfill dam, 93 ft. tall and 10,200 ft. long with a gated concrete spillway.
  • Yatesville Lake

    Yatesville  Lake  was authorized by Section 204 of Flood Control Act of 1965. Primary project purposes are flood damage reduction, low flow augmentation, water quality and recreation. The dam was completed in 1988 and serves a drainage area of 208 square miles. The lake is impounded by a rock-fill dam with a central impervious core, founded on in-situ overburden, 105 ft. tall and 760 ft. long, with an uncontrolled broad-crested spillway.
  • Paintsville Lake

    Paintsville Lake has a total of 1,139 surface acres. The US Army Corps of Engineers owns a total of 13,156 acres of land surrounding the lake with 57 miles of shoreline. The lake is approximately 18 miles in length.  Primary project purposes are flood risk reduction, water supply, low-flow augmentation, fish and wildlife enhancement, and recreation.
  • Grayson Lake

    Grayson Lake was authorized by Section 203 of Flood Act of 1960. Primary project purposes are flood risk management, water quality, water supply and recreation. Dam was completed in January 1968 and serves a drainage area of 196 square miles. The lake is impounded by an earth and random rock-fill dam, 120 ft. tall and 1,460 ft. long with an uncontrolled, broad-crested saddle spillway located at the left abutment of the dam.
  • Fishtrap Lake

    Fishtrap Lake is contained by the highest dam in Eastern Kentucky. Primary project purposes are flood risk reduction, fish and wildlife enhancement, water quality and recreation. Dam was completed in February 1969 and serves a drainage area of 392 square miles. The lake is impounded by a rolled rock impervious core dam, 195 ft. tall and 1,100 ft. long with a spillway controlled by four gates in the left abutment of the dam.
  • Dewey Lake

    Dewey Lake is part of the integrated flood reduction system operated by the Corp of Engineers for the entire Ohio River Basin. When the lakes in this system are operated as a vast storage system, flood crests along the Ohio can be significantly reduced. Construction of Dewey Dam began in 1946 and was completed in 1949.

Search