  • Draft Environmental Assessment for Gary/Chicago International Airport Storm and Sanitary Sewer Improvement Project

    Expiration date: 5/17/2025

    For Public Review: Draft EA/FONSI and Letter Report for the Gary/Chicago International Airport Storm and Sanitary Sewer Improvement Project

  • Environmental Assessment, Waldo Levee Land Acquisition, Marion County, Ohio

    The U.S. Army Corps of Engineers (Corps) is proposing a land acquisition of two (2) separate parcels of land located on what is the current Waldo Levee flood protection project just south of the Tomahawk pump station on the east side of Route (Rt) 23.
  • Draft Detailed Project Report And Integrated Environmental Assessment, Continuing Authorities Program, Elk Valley Public Service District, Elk River, Kanawha County, West Virginia, Section 14 Emergency Streambank Protection Project

    This Detailed Project Report (DPR) which includes a draft Environmental Assessment (EA) is being prepared by the Huntington District of the U.S. Army Corps of Engineers (USACE) to identify the viable recommended plan for providing streambank protection along the Elk River in Big Chimney, West Virginia, while minimizing environmental, economic, and social impacts. The integrated EA analyzes the potential environmental impacts of the proposed project and will be used to determine if an Environmental Impact Statement or a Finding of No Significant Impact is needed.
  • PUBLIC NOTICE: Supplemental Environmental Assessment, Channel Width Advanced Maintenance Dredging Monroe Harbor, Monroe County, Michigan

    Expiration date: 5/3/2025

    The U.S. Army Corps of Engineers, Detroit District, has completed a Supplemental Environmental Assessment (SEA) for channel width advance maintenance dredging at Monroe Harbor, Monroe, Michigan. The SEA is provided for your review and comment opportunity. The SEA supplements a channel depth advance maintenance EA completed in 2019. A reference copy of the 2019 EA is available upon request at lre-opmaint@usace.army.mil.
  • Lake Barkley Shoreline Management Plan (SMP) Review

    Expiration date: 5/1/2025

    The Lake Barkley Shoreline Management Plan (SMP) Review plan contains policies and guidelines for the effective long-range management of the shoreline resources on Lake Barkley. The primary objective of the SMP is to balance private shoreline uses, such as private boat docks, with the protection and conservation of Lake Barkley’s natural resources. In order to address ever changing public use demands affecting these natural resources, the SMP is reviewed every five years and updated if necessary. During this review process, public workshops will be held to seek the input from users of Lake Barkley. The workshops will begin at 6 p.m. on each of the following dates: • March 25 at Lee S. Jones Park (Lyon Convention Center) in Eddyville, Kentucky • March 27 at Lake Barkley State Resort Park (Sunrise Room) in Cadiz, Kentucky • April 1 at the Stewart County Visitor Center in Dover, Tennessee Written comments will also be accepted for 30 days following the public workshops. If you have any questions or concerns, please feel free to contact Biologist Wes Davenport at (270) 362-4236 or at LakeBarkley@usace.army.mil.
  • Final EA and Signed FONSI for Sunset Marina Expansion Project; Pickett County, Tennessee

    The Environmental Assessment (E)A has been finalized and FONSI signed for the proposed Sunset Marina Project.

  • Section 340 Grassy Creek Waterline Extension Project

    The draft EA/FONSI for the Section 340 Grassy Creek waterline extension project are available for public review and comment.
  • LRL-2025-002

    Expiration date: 2/27/2025

    This Report is an update on undertakings at our Indiana Lake projects for the 2024 calendar year. This Report is being provided for public review and comment as one of the requirements under the Programmatic Agreement (PA) Among the U.S. Army Corps of Engineers, Louisville District; the Indiana State Historic Preservation Officer; the Advisory
  • LRL-2025-001

    Expiration date: 2/27/2025

    The Scoping Letter is for our upcoming undertakings at our Indiana Lake projects for the 2025 calendar year. The Scoping Letter is being provided to allow the public an opportunity to review and comment on the upcoming undertakings for the 2025 Calendar Year. This Scoping Letter is being provided for public review and comment as one of the
  • Draft environmental assessment, Section 340 Town of Alderson water system rehabilitation project, Summers County, West Virginia

    The Town of Alderson (Town) is proposing to design and construct a water system rehabilitation project within Summers County, West Virginia. Several sections of the Town’s existing waterline have been identified as undersized or suspected of containing leaks, and numerous valves and hydrants have been identified as non-functioning and in need of replacement. The proposed infrastructure would address the unsanitary and unsafe conditions associated with the existing water system.