Results:
Category: Regulatory Public Notice
Clear
  • 2026 Nationwide Permits Regional Conditions for Kentucky

    Expiration date: 3/15/2031

    The U.S. Army Corps of Engineers announces the reissuance of 57 Nationwide Permits (NWPs) effective March 15, 2026, through March 15, 2031, along with Kentucky-specific Regional Conditions and Section 401 Water Quality Certifications. The Great Lakes and Ohio River Division approved Kentucky Regional Conditions on March 6, 2026. The Kentucky Division of Water denied 401 Water Quality Certification for eight NWPs (16, 17, 32, 38, 43, 44, 52, and 53), requiring individual certifications for projects under those permits.
  • 2026 Nationwide Permits Regional Conditions for Indiana

    Expiration date: 3/15/2031

    The U.S. Army Corps of Engineers Louisville, Detroit, and Chicago Districts announce the reissuance of 57 Nationwide Permits (NWPs) effective March 15, 2026, through March 15, 2031, for the State of Indiana. The Great Lakes and Ohio River Division approved Indiana Regional Conditions on March 6, 2026. The Indiana Department of Environmental Management issued Section 401 Water Quality Certifications for certain NWPs, while denying certification for others requiring individual review.

Consolidation of Studies

The Water Resources Development Act establishes a single-phase cost-shared study process that for each feasibility study undertaken, the district engineer will develop a detailed study schedule and notify the non-federal interests.

Overviews of study schedule milestones are posted below.