• Regulatory Public Notice 23-41; LRN-2020-01222

    Expiration date: 1/17/2024

    Please address comments to: Nashville District Corps of Engineers, Regulatory Division (Attn: Sammy Iskrzycki) 3701 Bell Road, Nashville, TN 37214-2660; Samantha.N.Iskrzycki@usace.army.mil; 615-829-3086

  • Regulatory Public Notice 23-47; LRN-2022-00293

    Expiration date: 12/27/2023

    Please address comments to: Nashville District Corps of Engineers, Regulatory Division (Attn: Adam McHann) 2424 Danville Road SW Suite N, Decatur, AL 35603; Adam.W.Mchann@usace.army.mil; 256-350-5620

  • Navigation Notice 23-48: Intermittent delays possible at Nickajack Lock

    Expiration date: 1/22/2024

    A contractor will be working to paint the wall armor at Nickajack Lock at Tennessee River mile 424.7 Nov. 6, 2023, to Jan. 19, 2024. During this period there could be intermittent delays up to four hours between 6 a.m. and 4:30 p.m. Monday through Saturday. Vessels are requested to contact the lock at 423-942-3985 with estimated time of arrival to minimize wait times. Call Nickajack Lock at 423-942-3985 for more information.
  • Navigation Notice 23-47: Bank stabilization project set at Cumberland River mile 205.8 from December to April

    Expiration date: 4/11/2024

    SES Civil and Environment is performing a bank stabilization project alongside the shoreline at Cumberland River mile 205.8 at the KR Harrington Water Treatment Plant Dec. 4, 2023, through April 10, 2024.
  • Navigation Notice 23-47: Bank stabilization project set at Cumberland River mile 205.8 from December to April

    Expiration date: 4/11/2024

    SES Civil and Environment is performing a bank stabilization project alongside the shoreline at Cumberland River mile 205.8 at the KR Harrington Water Treatment Plant Dec. 4, 2023, through April 10, 2024.
  • Preliminary Finding of No Significant Impact and Environmental Assessment for Muskegon Walkway and Revetment Rehabilitation

    Expiration date: 12/8/2023

    The tentatively chosen alternative will consist of excavating critical dunes to create access routes and work and storage areas to remove and replace a concrete walkway. The selected alternative includes 3,000 cubic yards (cyds) of excavated dune sand. The excavated sand will be placed west of the project site along the Lake Michigan shoreline. The proposed project will also include removal and replacement of the existing walkway and grouted stone impacting a 7.5ft wide by 2,300ft long area. The new walkway will include seven curb openings with 20ft-by-20ft turnabouts. The proposed project will also include a temporary access route along the walkway with an average width of 16ft and a maximum width of 24ft. Three (3) work and storage areas with dimensions of 70 feet wide by 150ft long and access and storage areas in the existing parking lot and along the existing concrete walkways. The work period is expected to begin in Summer 2024 and last a full construction season.
  • Regulatory Public Notice 23-46; LRN-2023-00808

    Expiration date: 12/2/2023

    Please address comments to: Nashville District Corps of Engineers, Regulatory Division, (Attn: Mike Uitvlugt) 3701 Bell Road, Nashville, TN 37214-2660; Michael.P.Uitvlugt@usace.army.mil; 505-985-2497

  • Regulatory Public Notice 23-48; LRN-2023-00768

    Expiration date: 12/2/2023

    Please address comments to: Nashville District Corps of Engineers, Regulatory Division (Attn: Michael Uitvlugt) 3701 Bell Road, Nashville, TN 37214-2660; Michael.P.Uitvlugt@usace.army.mil; 505-985-2497

  • Navigation Notice 23-46: Mooring cell out of service upstream of Eggners Ferry Highway Bridge

    The downstream most mooring cell at Tennessee River mile 43.6 just downstream of the Eggners Ferry Highway Bridge is damaged and out of service. A recent inspection revealed it has lost some of its stabilizing fill to support use. Vessels can still use the upstream most cell provided no contact is made with the downstream cell. Call Caleb Skinner, area lockmaster at Kentucky Lock, at 270-362-4226 for more information.
  • Navigation Notice 23-45: Wilson Lock Main Chamber closed during daytime Nov. 6, 2023

    Expiration date: 11/7/2023

    Wilson Lock's main navigation lock at Tennessee River mile 259.4 in Florence, Alabama, is closed 7 a.m. to 3 p.m. CST Monday, Nov. 6, 2023, while Tennessee Valley Authority moves its hydro unit caisson through the lock to perform diving operation on the upstream stoplog recess. For more information, call Brian Brewer, Facility Operations supervisor, at 256-247-3311.