Results:
Select: Document Type, District(s), and State(s): Approved Review Plans
Clear
  • Ashtabula Harbor, OH Interim Dredged Material Management Plan

    This Review Plan defines the scope and level of peer review for the Ashtabula Strategic Navigation Dredging Interim Dredged Material Management Plan

  • Black Rock Lock Comprehensive Lock Evaluation

    This review plan describes necessary quality reviews for engineering and design (E&D) products for the Black Rock Lock Comprehensive Evaluation Letter Report and Remedial Design Measures project (P2# 510340).

  • Soo Locks MRR Review Plan

    This Review Plan defines the scope and level of peer review for the Soo Locks Major Rehabilitation Report (MRR). The Soo Locks are located on the St. Mary’s River at Sault Ste. Marie, Michigan. This Review Plan applies to the MRR effort that will document the evaluation results of the present condition, present and future reliability, and consequences of unreliability of various key components of the Soo Locks. The MRR seeks to address the maintenance issues faced in the Soo Locks complex that effect navigation
  • Salt River Marsh GLFER Review Plan

    This Regional Review Plan Model defines the scope and level of peer review for the Salt River Marsh Coastal Habitat Restoration, Macomb County, Michigan, Great Lakes Fisheries and Ecosystem Restoration (GLFER) Program, which was authorized by Section 506, Water Resources Development Act of 2000, as amended by Section 5011 of the Water Resources Development Act of 2007.

  • Saginaw River Deepening Review Plan

    This Review Plan defines the scope and level of peer review for the Saginaw River Deepening feasibility Study.

  • All Section 154 Project Review Plans

    This Model Regional Review Plan (MRRP) describes how technical reviews will be conducted for decision and design documents, as applicable, for Environmental Infrastructure (E.I.) projects. These projects typically involve reimbursing the non-Federal Sponsors for design and construction work they perform on the installation or renovation of water supply and wastewater treatment facilities, environmental restoration, harbor development and expansion, and surface water resource protection and development, as specifically authorized for each E.I. Program. This is in accordance with EC 1165-2-209, Appendix B, which implies, “programmatic or regional model review plans may also be appropriate in other instances, such as regional environmental infrastructure authorities.” This model regional review plan is being prepared for the referenced seven authorities and would serve as an “umbrella” document under which specific Project Management Plans (PMPs) would be developed. Specific PMPs would address project scope, schedule, and cost.

  • Lorain Harbor Outer Breakwater Repair

    This review plan describes necessary quality reviews for engineering and design (E&D) products for the Lorain Harbor Outer Breakwater Repair Project.

  • All Section 569 Project Review Plans

    This Model Regional Review Plan (MRRP) describes how technical reviews will be conducted for decision and design documents, as applicable, for Environmental Infrastructure (E.I.) projects. These projects typically involve reimbursing the non-Federal Sponsors for design and construction work they perform on the installation or renovation of water supply and wastewater treatment facilities, environmental restoration, harbor development and expansion, and surface water resource protection and development, as specifically authorized for each E.I. Program. This is in accordance with EC 1165-2-209, Appendix B, which implies, “programmatic or regional model review plans may also be appropriate in other instances, such as regional environmental infrastructure authorities.” This model regional review plan is being prepared for the referenced seven authorities and would serve as an “umbrella” document under which specific Project Management Plans (PMPs) would be developed. Specific PMPs would address project scope, schedule, and cost.

  • Great Lakes Fishery and Ecosystem Restoration (GLFER) Regional Plan

    This Regional Review Plan model defines the scope and level of peer review for the Great Lakes Fisheries and Ecosystem Restoration (GLFER) Program which was authorized by  Section 506, Water Resources Development Act of 2000, as amended by Section 5011 of the Water Resources Development Act of 2007.

  • Menomonee River Section 206 Review Plan

    This report was prepared as part of an initiative by the U.S. Army Corps of Engineers (USACE) to evaluate the feasibility of ecosystem restoration of approximately 2,400 lineal feet (LF) of the Menomonee River in the City of Milwaukee, Milwaukee County, Wisconsin. The USACE is partnering with the Milwaukee Metropolitan Sewerage District (MMSD) for this project. This study is conducted under the authority of Section 206 of the Water Resources Development Act of 1996, (Public Law 104-303) as amended, Title 33 of the U.S. Code Section 2330 and the report was prepared according to guidelines specified in the USACE’s Engineering Regulation 1105-2-100.

Chick Lock

Through deeds, not words, we are BUILDING STRONG®