  • Draft environmental assessment, Section 594 ‎Village of Lowell Wastewater Treatment Plant project, Washington County, Ohio

    The Village of Lowell, Ohio is proposing to design and construct a wastewater treatment plant replacement project adjacent to their existing treatment plant located in Washington County, Ohio. The existing treatment plant was built in 1987, and many of its components are well beyond their functional lifecycle/lifespan. The treatment plant’s headworks lift station has experienced significant corrosion and currently only one (1) pump is in working condition. In addition, the grit removal facility and the majority of the oxidation basin diffusers have failed and are no longer in use. The treatment plant does not have the adequate sludge storage, digester, and dewatering capabilities necessary to keep biological processes optimal, and the sludge bed is susceptible to flooding. Capacity of the treatment plant has diminished significantly in the past 10 years and has led to multiple instances of exceeding Ohio Environmental Protection Agency limitations on effluent flow. The proposed replacement wastewater treatment plant would address the unsanitary and unsafe conditions associated with the existing treatment plant.

  • LRL-2024-002

    Expiration date: 2/20/2024

    This Report is an update on undertakings at our Indiana Lake projects for the 2023 calendar year. This Report is being provided for public review and comment as one of the requirements under the Programmatic Agreement (PA) Among the U.S. Army Corps of Engineers, Louisville District; the Indiana State Historic Preservation Officer; the Advisory
  • LRL-2024-001

    Expiration date: 2/20/2024

    The Scoping Letter is for our upcoming undertakings at our Indiana Lake projects for the 2024 calendar year. The Scoping Letter is being provided to allow the public an opportunity to review and comment on the upcoming undertakings for the 2024 Calendar Year. This Scoping Letter is being provided for public review and comment as one of the
  • Regulatory Public Notice 23-29; LRN-2022-00933

    Expiration date: 11/25/2023

    Please address all comments to: Nashville District Corps of Engineers, Regulatory Division (Attn: Autumn Osgood), 3701 Bell Road, Nashville, TN 37214; autumn.t.osgood@usace.army.mil; 615-369-7507

  • Regulatory Public Notice 23-38; LRN-2000-01400

    Expiration date: 10/26/2023

    Please address comments to: Nashville District Corps of Engineers, Regulatory Division (Attn: Mark McIntosh), 3701 Bell Road, Nashville, TN 37214-2660; mark.g.mcintosh@usace.army.mil

  • Navigation Notice 23-42-1: Kentucky Lock closure update

    Expiration date: 10/30/2023

    Kentucky Lock will be closed to navigation daily from 6 a.m. to 6 p.m. CST starting Tuesday, Oct. 24, 2023, and will reopen to navigation at 6 p.m. Thursday, Oct. 26, 2023, then close 6 a.m. Monday, Oct. 30, 2023, and reopen at 6 p.m. to make repairs to the downstream river wall air seals. Traffic may pass by taking the alternate route via Barkley Lock and the Barkley Canal.
  • Navigation Notice 23-43: TVA performing work on transmission lines below Wheeler Dam

    Expiration date: 11/2/2023

    Navigation Notice 23-43: The Tennessee Valley Authority is working on transmission lines just below Wheeler Dam. Work begins Oct. 30, 2023, and will continue for about eight days. Work is taking place daily from 6:30 a.m. to 6 p.m. Three boats are positioned as safety boats with white and yellow flashing lights. One will have a U.S. Coast Guard licensed master of towing vessel so a good line of communication can be maintained between the project and commercial traffic. Its call sign is TVA1. The fourth boat is a police boat with blue lights to maintain safety of recreation vessels, and its call sign is TVA2.sels, and its call sign is TVA2.