Our Goal

To equip industry with accurate contracting forecasts to maintain transparency in our program. The forecast is intended to allow industry to make business decisions earlier in the acquisition process. The forecast covers all seven districts within LRD and is scheduled to be updated bi-monthly. All dates and monetary ranges in the forecast are tentative and subject to change.

Aquisition Forecast Legend
  • SBSA - Small Business Set Aside
  • F&O - Full and Open (Unrestricted)
  • 8(a) SS - 8(a) Sole Source
  • WOSB - Women-Owned Small Business
  • SS - Sole Source (non 8(a))
  • 8(a) Comp - 8(a) Competitive
  • HBZ - HubZone Set-Aside
  • MATOC - Multiple Award Task-Order Contract
  • IDIQ - Indefinite Delivery Indefinite Quantity Contract
  • TO - Task Order
  • SAP - Simplified Acquisition Procedures
  • IFB - Sealed Bid (Invitation for Bid)
  • RFP - Request for Proposal
  • Contract Opportunity Forecast - Complete Categorical Breakdown

    Marcel Hull
    This spreadsheet is a complete categorical breakdown of all current opportunities for contractors. Click to download a fully accessible file, broken down by district. Contact LRD Contracting office for more information (celrd-contracting@usace.army.mil)
    • Organization: Great Lakes and Ohio River Division
    • Published On: 1/8/2025
Page 1 of 1

Industry Day 2024

Forecast of Opportunities

Browse records in that    Search     

Click any column header to sort table data.
DistrictProject DescriptionProject LocationEst $ RangeNAICSSet-AsideContract VehicleAward TypeAdvertise DateAward Date
LRBSandusky Harbor Dredging - Channel maintenance dredgingSandusky (Ohio)$500K-$1M237990Small Business Set AsideMATOCTOFY25 Q4FY25 Q4
LRBFairport Dredging - Channel mainenance dredgingFairport (Ohio)$1M-$5M237990Small Business Set AsideMATOCTOFY25 Q2FY24 Q3
LRBCleveland Harbor Dredging - Channel mainenance dredgingCleveland (Ohio)$5M-$10M237990Small Business Set AsideNAIFBFY25 Q2FY25 Q2
LRBAshtabula Harbor Dredging - Channel mainenance dredgingAshtabula (Ohio)$1M-$5M237990Small Business Set AsideMATOCTOFY25 Q3FY25 Q3
LRBBuffalo Harbor Dredging - Channel mainenance dredgingBuffalo (New York)$1M-$5M237990Small Business Set AsideMATOCTOFY25 Q4FY25 Q4
LRBConneaut Harbor Dredging - Channel mainenance dredgingConneaut (Ohio)$1M-$5M237990Small Business Set AsideMATOCTOFY25 Q3FY25 Q3
LRBRocky River Harbor Dredging - Channel mainenance dredgingRocky River (Ohio)$500K-$1M237990Small Business Set AsideMATOCTOFY25 Q3FY25 Q3
LRBGreat Sodus/Oak Orchard Harbor Dredging - Channel mainenance dredgingGreat Sodus and Oak Orchard (New York)$500K-$1M237990Small Business Set AsideMATOCTOFY25 Q3FY25 Q4
LRBLorain Harbor Dredging - Channel mainenance dredgingLorain (Ohio)$1M-$5M237990Small Business Set AsideMATOCTOFY25 Q3FY25 Q3
LRBMaumee Bay and River Dredging - Channel mainenance dredgingToledo(Ohio)$1M-$5M237990Small Business Set AsideSATOCTON/AFY25 Q3
LRBOswego Harbor West Arrowhead Breakwater Repair - Repair BreakwaterOswego (New York)$5M-$10M237990UnrestrictedMATOCTOFY25 Q1FY25 Q2
LRBSLDA RemediationParks Township (Pennsylvania)$250M-$500M562910UnrestrictedNARFPFY25 Q3FY26 Q2
LRBGuterl RemediationLockport (New York)$249M562910Small Business Set AsideNARFPFY25 Q1FY25 Q4
LRBBig John SalvageFairmont (West Virginia)$25M-$100M562910Small Business Set AsideNARFPFY25 Q3FY25 Q4
LRBErie North Pier RepairErie (Pennsylvania)$1M-$5M237990UnrestrictedMATOCTOFY25 Q3FY25 Q4
LRBBoston Mills Ecosystem RestorationCleveland (Ohio)$10M-$25M237990TBANAIFBFY25 Q2FY25 Q3
LRBEuclid Creek Ecosystem RestorationEuclid (Ohio)$1M-$5M237990TBANAIFBFY25 Q2FY25 Q3
LRBBuffalo CDF RepairBuffalo (New York)$10M-$25M237990UnrestrictedMATOCTOFY25 Q1FY25 Q2
LRBBarcelona Breakwater Grouting RepairBarcelona (New York)$1M-$5M237990UnrestrictedMATOCTOFY25 Q4FY25 Q4
LRBWest Valley Spillway RepairsWest Valley(New York)$1M-$5M237990UnrestrictedNARFPFY25 Q1FY25 Q2
LRBUSDA Grape Research FacilityGeneva (New York)$25M-$100M237990UnrestrictedNARFPFY25 Q1FY25 Q2
LRCReplace Windows in Control Tower- Mississinewa Lake- INPeru (Indiana)$50K-100KTBDTBDTBDTBDFY25 Q1FY25 Q1
LRCBurns Waterway Harbor- IN DredgingPortage- IN$500K-$1MTBDTBDTBDTBDFY25 Q1FY25 Q1
LRCWater Treatment - Indiana Harbor and Canal- INEast Chicago (Indiana)$5M-$10MTBDTBDTBDTBDFY25 Q1FY25 Q1
LRCHarbor Channel Maintenance- Big Suamico River- WISuamico (Wisconsin)$500K-$1MTBDTBDTBDTBDFY25 Q1FY25 Q1
LRCRoad Installation Calumet Harbor DMDFChicago (Illinois)$1M-$5MTBDTBDTBDTBDFY25 Q1FY25 Q1
LRCEast/West Embankment Raising- T.J. O'Brien Lock and DamChicago (Illinois)$1M-$5MTBDTBDTBDTBDFY25 Q4FY25 Q4
LRCShorearm Extension & Eastern Outer Breakwater Repair- Chicago HarborChicago (Illinois)$5M-$10MTBDTBDTBDTBDFY25 Q1FY25 Q2
LRCWater Main Improvements- Cook County Sec 219Lemont (Illinois)$1M-$5MTBDTBDTBDTBDFY25 Q1FY25 Q1
LRCAquatic Ecosystem Restoration- Honey Creek Sec 206Milwaukee (Wisconsin)$10M-$25MTBDTBDTBDTBDFY25 Q4FY25 Q4
LRCManitowoc North & South Breakwater Repair- Manitowoc Harbor- WIManitowoc (Wisconsin)$5M-$10MTBDTBDTBDTBDFY25 Q1FY25 Q2
LRCWater Main Improvements- Cook County Sec 219- Cicero- ILCicero (Illinois)$1M-$5MTBDTBDTBDTBDFY25 Q1FY25 Q1
LRCCook County SEC 219- Matteson- IL Watermain Replacement phase IIMatteson (Illinois)$1M-$5MTBDTBDTBDTBDFY25 Q1FY25 Q1
LRCDredging- Indiana Harbor- INEast Chicago (Indiana)$1M-$5MTBDTBDTBDTBDFY25 Q2FY25 Q2
LRCDam Removal- Horlick Dam- WI- Sec 506Racine (Wisconsin)$1M-$5MTBDTBDTBDTBDFY25 Q4FY25 Q4
LRCNorth Breakwater Repair- Algoma Harbor- WIAlgoma (Wisconsin)$10M-$25MTBDTBDTBDTBDFY25 Q3FY25 Q4
LRCCSSC Electric Dispersial Barrier- IL- Barrier ID Generator ReplacementLockport- IL$250K-$500KTBDTBDTBDTBDFY25 Q2FY25 Q2
LRCCSSC Electric Dispersial Barrier- IL- Barrier I Camera UpgradesLockport- IL$150K-$300KTBDTBDTBDTBDFY25 Q1FY25 Q2
LRCHerbicide Facility Services- Multiple LocationsChicago- IL / Lockport- IL$50K-$100KTBDTBDTBDTBDFY25 Q2FY25 Q2
LRCChicago Harbor Lock & Dam- Platform Work Boat ProcurementChhicago- IL$50K-$100KTBDTBDTBDTBDFY25 Q2FY25 Q2
LRCHerbicide Facility Services- Multiple LocationsIL- IN- WI$250K-$750KTBDTBDTBDTBDFY25 Q2FY25 Q2
LRCCrane Contract- Multiple LocationsIL- IN- WI$150K-$300KTBDTBDTBDTBDFY25 Q2FY25 Q2
LRCGeneral Jones Armory- AE Contract- 35% Design BuildChicago- IL$2.5M-$3.5MTBDTBDTBDTBDFY25 Q3FY25 Q3
LRCKenosha Harbor Sediment SamplingIL- IN- WI$100K-$150KTBDTBDTBDTBDFY25 Q3FY25 Q3
LRCPort Washington Sediment SamplingIL- IN- WI$100K-$150KTBDTBDTBDTBDFY25 Q3FY25 Q3
LRCMichigan City Sediment SamplingIL- IN- WI$100K-$150KTBDTBDTBDTBDFY25 Q3FY25 Q3
LRCBat Survey- Survey/SamplingIL- IN- WI$100K-$150KTBDTBDTBDTBDFY25 Q3FY25 Q3
LRCCSSC Electric Dispersal Barrier- IL - Lewis Property DemolitionLockport- IL$400K-$600KTBDTBDTBDTBDFY25 Q2FY25 Q2
LRE15KV Switchgear for the SOO: The U.S. Army Corps of Engineers- Detroit District has a requirement to provide for the installation of a new 15kV Switchgear to replace the current switchgear at the hydroelectric generating facility at the Soo LocksSault Ste. Marie (Michigan)Between $5M and $10M238210UnrestrictedNARFPFY25 Q2FY25 Q3
LRESOO Duct Bank and Generator: Standby Generator System – construction of new natural gas fueled back-up generator system with removal of existing back-up generators and associated diesel fuel storage and distribution system.Sault Ste. Marie (Michigan)Between $10M and $25M236220UnrestrictedNARFPFY25 Q2FY25 Q3/Q4
Page 1 of 10First   Previous   [1]  2  3  4  5  6  7  8  9  10  Next   Last