Click any column header to sort table data.
LRB | Sandusky Harbor Dredging - Channel maintenance dredging | Sandusky (Ohio) | $500K-$1M | 237990 | Small Business Set Aside | MATOC | TO | FY25 Q4 | FY25 Q4 |
LRB | Fairport Dredging - Channel mainenance dredging | Fairport (Ohio) | $1M-$5M | 237990 | Small Business Set Aside | MATOC | TO | FY25 Q2 | FY24 Q3 |
LRB | Cleveland Harbor Dredging - Channel mainenance dredging | Cleveland (Ohio) | $5M-$10M | 237990 | Small Business Set Aside | NA | IFB | FY25 Q2 | FY25 Q2 |
LRB | Ashtabula Harbor Dredging - Channel mainenance dredging | Ashtabula (Ohio) | $1M-$5M | 237990 | Small Business Set Aside | MATOC | TO | FY25 Q3 | FY25 Q3 |
LRB | Buffalo Harbor Dredging - Channel mainenance dredging | Buffalo (New York) | $1M-$5M | 237990 | Small Business Set Aside | MATOC | TO | FY25 Q4 | FY25 Q4 |
LRB | Conneaut Harbor Dredging - Channel mainenance dredging | Conneaut (Ohio) | $1M-$5M | 237990 | Small Business Set Aside | MATOC | TO | FY25 Q3 | FY25 Q3 |
LRB | Rocky River Harbor Dredging - Channel mainenance dredging | Rocky River (Ohio) | $500K-$1M | 237990 | Small Business Set Aside | MATOC | TO | FY25 Q3 | FY25 Q3 |
LRB | Great Sodus/Oak Orchard Harbor Dredging - Channel mainenance dredging | Great Sodus and Oak Orchard (New York) | $500K-$1M | 237990 | Small Business Set Aside | MATOC | TO | FY25 Q3 | FY25 Q4 |
LRB | Lorain Harbor Dredging - Channel mainenance dredging | Lorain (Ohio) | $1M-$5M | 237990 | Small Business Set Aside | MATOC | TO | FY25 Q3 | FY25 Q3 |
LRB | Maumee Bay and River Dredging - Channel mainenance dredging | Toledo(Ohio) | $1M-$5M | 237990 | Small Business Set Aside | SATOC | TO | N/A | FY25 Q3 |
LRB | Oswego Harbor West Arrowhead Breakwater Repair - Repair Breakwater | Oswego (New York) | $5M-$10M | 237990 | Unrestricted | MATOC | TO | FY25 Q1 | FY25 Q2 |
LRB | SLDA Remediation | Parks Township (Pennsylvania) | $250M-$500M | 562910 | Unrestricted | NA | RFP | FY25 Q3 | FY26 Q2 |
LRB | Guterl Remediation | Lockport (New York) | $249M | 562910 | Small Business Set Aside | NA | RFP | FY25 Q1 | FY25 Q4 |
LRB | Big John Salvage | Fairmont (West Virginia) | $25M-$100M | 562910 | Small Business Set Aside | NA | RFP | FY25 Q3 | FY25 Q4 |
LRB | Erie North Pier Repair | Erie (Pennsylvania) | $1M-$5M | 237990 | Unrestricted | MATOC | TO | FY25 Q3 | FY25 Q4 |
LRB | Boston Mills Ecosystem Restoration | Cleveland (Ohio) | $10M-$25M | 237990 | TBA | NA | IFB | FY25 Q2 | FY25 Q3 |
LRB | Euclid Creek Ecosystem Restoration | Euclid (Ohio) | $1M-$5M | 237990 | TBA | NA | IFB | FY25 Q2 | FY25 Q3 |
LRB | Buffalo CDF Repair | Buffalo (New York) | $10M-$25M | 237990 | Unrestricted | MATOC | TO | FY25 Q1 | FY25 Q2 |
LRB | Barcelona Breakwater Grouting Repair | Barcelona (New York) | $1M-$5M | 237990 | Unrestricted | MATOC | TO | FY25 Q4 | FY25 Q4 |
LRB | West Valley Spillway Repairs | West Valley(New York) | $1M-$5M | 237990 | Unrestricted | NA | RFP | FY25 Q1 | FY25 Q2 |
LRB | USDA Grape Research Facility | Geneva (New York) | $25M-$100M | 237990 | Unrestricted | NA | RFP | FY25 Q1 | FY25 Q2 |
LRC | Replace Windows in Control Tower- Mississinewa Lake- IN | Peru (Indiana) | $50K-100K | TBD | TBD | TBD | TBD | FY25 Q1 | FY25 Q1 |
LRC | Burns Waterway Harbor- IN Dredging | Portage- IN | $500K-$1M | TBD | TBD | TBD | TBD | FY25 Q1 | FY25 Q1 |
LRC | Water Treatment - Indiana Harbor and Canal- IN | East Chicago (Indiana) | $5M-$10M | TBD | TBD | TBD | TBD | FY25 Q1 | FY25 Q1 |
LRC | Harbor Channel Maintenance- Big Suamico River- WI | Suamico (Wisconsin) | $500K-$1M | TBD | TBD | TBD | TBD | FY25 Q1 | FY25 Q1 |
LRC | Road Installation Calumet Harbor DMDF | Chicago (Illinois) | $1M-$5M | TBD | TBD | TBD | TBD | FY25 Q1 | FY25 Q1 |
LRC | East/West Embankment Raising- T.J. O'Brien Lock and Dam | Chicago (Illinois) | $1M-$5M | TBD | TBD | TBD | TBD | FY25 Q4 | FY25 Q4 |
LRC | Shorearm Extension & Eastern Outer Breakwater Repair- Chicago Harbor | Chicago (Illinois) | $5M-$10M | TBD | TBD | TBD | TBD | FY25 Q1 | FY25 Q2 |
LRC | Water Main Improvements- Cook County Sec 219 | Lemont (Illinois) | $1M-$5M | TBD | TBD | TBD | TBD | FY25 Q1 | FY25 Q1 |
LRC | Aquatic Ecosystem Restoration- Honey Creek Sec 206 | Milwaukee (Wisconsin) | $10M-$25M | TBD | TBD | TBD | TBD | FY25 Q4 | FY25 Q4 |
LRC | Manitowoc North & South Breakwater Repair- Manitowoc Harbor- WI | Manitowoc (Wisconsin) | $5M-$10M | TBD | TBD | TBD | TBD | FY25 Q1 | FY25 Q2 |
LRC | Water Main Improvements- Cook County Sec 219- Cicero- IL | Cicero (Illinois) | $1M-$5M | TBD | TBD | TBD | TBD | FY25 Q1 | FY25 Q1 |
LRC | Cook County SEC 219- Matteson- IL Watermain Replacement phase II | Matteson (Illinois) | $1M-$5M | TBD | TBD | TBD | TBD | FY25 Q1 | FY25 Q1 |
LRC | Dredging- Indiana Harbor- IN | East Chicago (Indiana) | $1M-$5M | TBD | TBD | TBD | TBD | FY25 Q2 | FY25 Q2 |
LRC | Dam Removal- Horlick Dam- WI- Sec 506 | Racine (Wisconsin) | $1M-$5M | TBD | TBD | TBD | TBD | FY25 Q4 | FY25 Q4 |
LRC | North Breakwater Repair- Algoma Harbor- WI | Algoma (Wisconsin) | $10M-$25M | TBD | TBD | TBD | TBD | FY25 Q3 | FY25 Q4 |
LRC | CSSC Electric Dispersial Barrier- IL- Barrier ID Generator Replacement | Lockport- IL | $250K-$500K | TBD | TBD | TBD | TBD | FY25 Q2 | FY25 Q2 |
LRC | CSSC Electric Dispersial Barrier- IL- Barrier I Camera Upgrades | Lockport- IL | $150K-$300K | TBD | TBD | TBD | TBD | FY25 Q1 | FY25 Q2 |
LRC | Herbicide Facility Services- Multiple Locations | Chicago- IL / Lockport- IL | $50K-$100K | TBD | TBD | TBD | TBD | FY25 Q2 | FY25 Q2 |
LRC | Chicago Harbor Lock & Dam- Platform Work Boat Procurement | Chhicago- IL | $50K-$100K | TBD | TBD | TBD | TBD | FY25 Q2 | FY25 Q2 |
LRC | Herbicide Facility Services- Multiple Locations | IL- IN- WI | $250K-$750K | TBD | TBD | TBD | TBD | FY25 Q2 | FY25 Q2 |
LRC | Crane Contract- Multiple Locations | IL- IN- WI | $150K-$300K | TBD | TBD | TBD | TBD | FY25 Q2 | FY25 Q2 |
LRC | General Jones Armory- AE Contract- 35% Design Build | Chicago- IL | $2.5M-$3.5M | TBD | TBD | TBD | TBD | FY25 Q3 | FY25 Q3 |
LRC | Kenosha Harbor Sediment Sampling | IL- IN- WI | $100K-$150K | TBD | TBD | TBD | TBD | FY25 Q3 | FY25 Q3 |
LRC | Port Washington Sediment Sampling | IL- IN- WI | $100K-$150K | TBD | TBD | TBD | TBD | FY25 Q3 | FY25 Q3 |
LRC | Michigan City Sediment Sampling | IL- IN- WI | $100K-$150K | TBD | TBD | TBD | TBD | FY25 Q3 | FY25 Q3 |
LRC | Bat Survey- Survey/Sampling | IL- IN- WI | $100K-$150K | TBD | TBD | TBD | TBD | FY25 Q3 | FY25 Q3 |
LRC | CSSC Electric Dispersal Barrier- IL - Lewis Property Demolition | Lockport- IL | $400K-$600K | TBD | TBD | TBD | TBD | FY25 Q2 | FY25 Q2 |
LRE | 15KV Switchgear for the SOO: The U.S. Army Corps of Engineers-
Detroit District has a requirement to provide for the installation of a new 15kV Switchgear to
replace the current switchgear at the hydroelectric generating facility at the Soo Locks | Sault Ste. Marie (Michigan) | Between $5M and $10M | 238210 | Unrestricted | NA | RFP | FY25 Q2 | FY25 Q3 |
LRE | SOO Duct Bank and Generator: Standby Generator System – construction of new natural gas fueled back-up generator system with removal of existing back-up generators and associated diesel fuel storage and distribution system. | Sault Ste. Marie (Michigan) | Between $10M and $25M | 236220 | Unrestricted | NA | RFP | FY25 Q2 | FY25 Q3/Q4 |