Results:
Tag: Poe Lock
Clear
  • Review Plan Engineering and Design Products Soo Poe Lock Gate 3 Engineering and Design

    This review plan describes necessary quality reviews for engineering and design (E&D) products for the Soo Poe Lock Gate 3 Engineering and Design. Design of a new downstream (D/S) miter gate (Gate #3) at the Poe including gate leaves, pintle base, adjustable wall quoin and a rod connection interface to gate. The design package to include drawings, technical specifications, ECIFP, and DDR w/calculations. Fabrication and installation is not considered.

Consolidation of Studies

The Water Resources Development Act establishes a single-phase cost-shared study process that for each feasibility study undertaken, the district engineer will develop a detailed study schedule and notify the non-federal interests.

Overviews of study schedule milestones are posted below.