External Peer Review for this study will be limited to two specific technical areas that are important elements of the Feasibility Study formulation and design. Great Lakes and Ohio River Division (LRD) and Office of Water Project Review, HQUSACE (OWPR) were consulted on the use of a selected ERP for this study.