• Review Plan for Buffalo River, NY, Section 204 Beneficial Reuse of Dredged Material Project

    The attached decision document Review Plan (RP) for Buffalo River was presented to the Great Lakes and Ohio River Division for approval in accordance with EC 1165-2-214 "CivilWorks Review" dated 15 Dec 2012.

  • Blanchard River Watershed, Ohio Feasibility Report

    This Review Plan defines the scope and level of agency and peer review for the Feasibility Study of flood risk management and ecosystem restorations plans for the BlanchardRiver Watershed, Ohio.

  • Ashtabula Harbor, OH Interim Dredged Material Management Plan

    This Review Plan defines the scope and level of peer review for the Ashtabula Strategic Navigation Dredging Interim Dredged Material Management Plan

  • Black Rock Lock Comprehensive Lock Evaluation

    This review plan describes necessary quality reviews for engineering and design (E&D) products for the Black Rock Lock Comprehensive Evaluation Letter Report and Remedial Design Measures project (P2# 510340).

  • Soo Locks MRR Review Plan

    This Review Plan defines the scope and level of peer review for the Soo Locks Major Rehabilitation Report (MRR). The Soo Locks are located on the St. Mary’s River at Sault Ste. Marie, Michigan. This Review Plan applies to the MRR effort that will document the evaluation results of the present condition, present and future reliability, and consequences of unreliability of various key components of the Soo Locks. The MRR seeks to address the maintenance issues faced in the Soo Locks complex that effect navigation
  • Salt River Marsh GLFER Review Plan

    This Regional Review Plan Model defines the scope and level of peer review for the Salt River Marsh Coastal Habitat Restoration, Macomb County, Michigan, Great Lakes Fisheries and Ecosystem Restoration (GLFER) Program, which was authorized by Section 506, Water Resources Development Act of 2000, as amended by Section 5011 of the Water Resources Development Act of 2007.

  • Saginaw River Deepening Review Plan

    This Review Plan defines the scope and level of peer review for the Saginaw River Deepening feasibility Study.

  • All Section 154 Project Review Plans

    This Model Regional Review Plan (MRRP) describes how technical reviews will be conducted for decision and design documents, as applicable, for Environmental Infrastructure (E.I.) projects. These projects typically involve reimbursing the non-Federal Sponsors for design and construction work they perform on the installation or renovation of water supply and wastewater treatment facilities, environmental restoration, harbor development and expansion, and surface water resource protection and development, as specifically authorized for each E.I. Program. This is in accordance with EC 1165-2-209, Appendix B, which implies, “programmatic or regional model review plans may also be appropriate in other instances, such as regional environmental infrastructure authorities.” This model regional review plan is being prepared for the referenced seven authorities and would serve as an “umbrella” document under which specific Project Management Plans (PMPs) would be developed. Specific PMPs would address project scope, schedule, and cost.

  • Lorain Harbor Outer Breakwater Repair

    This review plan describes necessary quality reviews for engineering and design (E&D) products for the Lorain Harbor Outer Breakwater Repair Project.

  • All Section 569 Project Review Plans

    This Model Regional Review Plan (MRRP) describes how technical reviews will be conducted for decision and design documents, as applicable, for Environmental Infrastructure (E.I.) projects. These projects typically involve reimbursing the non-Federal Sponsors for design and construction work they perform on the installation or renovation of water supply and wastewater treatment facilities, environmental restoration, harbor development and expansion, and surface water resource protection and development, as specifically authorized for each E.I. Program. This is in accordance with EC 1165-2-209, Appendix B, which implies, “programmatic or regional model review plans may also be appropriate in other instances, such as regional environmental infrastructure authorities.” This model regional review plan is being prepared for the referenced seven authorities and would serve as an “umbrella” document under which specific Project Management Plans (PMPs) would be developed. Specific PMPs would address project scope, schedule, and cost.