Find News Releases

Contact a Public Affairs Office

Great Lakes and Ohio River Division
(513) 684-3097 or (513) 684-3010
Buffalo District
1-800-833-6390 (option 3)
Chicago District
312-846-5330
Detroit District
313-226-4680
Huntington District
304-399-5353
Louisville District
(502) 315-6766
Nashville District
(615) 736-7161
Pittsburgh District
412-395-7502
Results:
Tag: Kentucky
Clear
  • USACE hosting virtual workshop for Cave Run Lake Master Plan Update

    The U.S. Army Corps of Engineers is in the process of updating its 1984 Master Plan for Cave Run
  • Buckhorn and Carr Creek Dams are operating as designed, providing flood damage reduction

    The U.S. Army Corps of Engineers Buckhorn Reservoir, Buckhorn, Kentucky, is currently at 818.4 feet or 56 percent full as of Tuesday, March 2 at 12:00 p.m. While Carr Creek Reservoir, Sassafras, Kentucky, is currently at 1037.7 feet or 47 percent full. The Buckhorn and Carr Creek Dams on the Middle Fork and the North Fork, respectively, of the Kentucky River are currently storing water and providing a reduction to the flooding occurring downstream. The dams are structurally sound and operating as designed.
  • NR 20-031: Martin Fork Lake Field Office temporarily using appointment system

    NASHVILLE, Tenn. (Dec. 14, 2020) – The U.S. Army Corps of Engineers Nashville District announces that the Martins Fork Lake Field Office located in Smith, Kentucky, is accepting visitors by appointment only through Jan. 15, 2020 as a precaution to prevent the spread of COVID-19.