The project consists of 6 structural measures that will be packaged into several contracting packages where possible and as resources and schedules allow. Each contracting package will undergo reviews as outlined in this Review Plan. The measures are: detention structure at the 12th Street, detention structure near Williams Street, channel modifications near Tinsley Park, Ocoee Street, Clearwater Street and Blount Ave.