  • Alum Creek Lake

    Alum Creek Lake was authorized by Section 203 of Flood Control Act of 1962. The primary project purposes are are flood risk reduction, water supply for the Columbus metropolitan area, fish and wildlife, and recreation. The lake is impounded by a rolled earthfill dam, 93 ft. tall and 10,200 ft. long with a gated concrete spillway. The dam was completed in August 1974 and serves a drainage area of 123 square miles.
  • Atwood Lake

    Atwood Lake serves as the Project Office for the projects located within the Lower Tuscarawas section of the Muskingum Area. It was authorized by Section 4 of the Flood Control Act (FCA) of 1938, as amended by Section 4 of the FCA of 1939. Primary project purposes are flood damage reduction, recreation, and fish and wildlife.
  • Beach City Lake

    Beach City Dam is located near the northern border of Tuscarawas County, Ohio, on Sugar Creek, a tributary of the Tuscarawas River, about nine miles above New Philadelphia, Ohio. The dam was completed in 1936 for flood control and water conservation in the Muskingum Watershed area.
  • Beech Fork Lake

    Beech Fork Lake (authorized by the Flood Control Act of 1962) is part of the integrated flood
  • Belleville Locks and Dam

    The Huntington District is home to the Belleville Locks and Dam located on the Ohio River at mile 204. Belleville Locks sit 203.9 miles below Pittsburgh, PA, and 0.5 miles below Belleville, WV. The two navigation locks are located on the right bank (Ohio side) of the river. The upper pool maintained above the dam extends upstream for a distance of 42.2 miles to Willow Island Dam.
  • Bluestone Dam

    Bluestone Lake was authorized by Section 5 of the Flood Control Act of 1936, amended by section 4 of the FCA of 1938. The primary project purposes are flood risk management, fish and wildlife enhancement, recreation, and low flow augmentation. Bluestone Dam spans the New River at Hinton, WV forming Bluestone Lake, the third largest lake in West Virginia. At summer pool Bluestone Lake covers 2,040 acres and is 10.7 miles long.
  • Bolivar Dam

    Bolivar Dam is within the Upper Tuscarawas section of the Muskingum Area. It was authorized by Section 4 of the Flood Control Act (FCA) of 1938, as amended by Section 4 of the FCA of 1939. Primary project purposes are flood damage reduction, recreation, and fish and wildlife. Land includes 713 fee acres and 8,282 flowage easement acres. The dam was completed September 1938 and serves a drainage area of 504 square miles. The dam is a rolled earth-fill with impervious core, 87 ft. tall, 6,300 ft. long and 25 ft. wide at the top and 480 ft. wide at the base.
  • Buchanan County Section 202 Project

    The primary components of the project include school relocations; an Emergency Evacuation Plan (EEP); and a voluntary floodproofing and floodplain evacuation program. The Buchanan County Career and Technical Center (BCCTHLC) qualifies for a floodproofing Ring wall around the facility and USACE Huntington District completed the Design Documentation Report (DDR) in November 2019.
  • Captain Anthony Meldahl Locks and Dam

    Meldahl Locks and Dam are located at mile 436 of the Ohio River in Felicity. Estimated construction $74,082,900.
  • Charles Mill Lake

    Charles Mill Dam is located on the Black Fork of the Mohican River, 10 miles east of Mansfield and 10 miles southwest of Ashland, Ohio. The lake is located in Ashland and Richland counties with the dam being located in Ashland County. Charles Mill Dam was constructed in 1935-36 and is primarily for flood control but also for recreation and fish and wildlife management. 
  • Clendening Lake

    Clendening Lake is located in Harrison County, Ohio on the Brushy Fork of the Stillwater Creek within the Lower Tuscarawas section of the Muskingum Area. Clendening Lake was constructed in 1937.  It was built for flood damage reduction, recreation, and fish and wildlife management. 
  • Deer Creek Lake

    Deer Creek Lake  was authorized by Section 4 of Flood Control Act of 1938. The primary project purposes are flood risk reduction, fish and wildlife enhancement, recreation, and low flow augmentation. The lake is impounded by a rolled earthfill dam 93 ft. tall and 3,800 ft. long with a gated concrete spillway. The dam was completed in 1968 and serves a drainage area of 277 square miles. The spillway is controlled by three tainter gates in the channel section of the dam. The outlet works consist of five 5 sluices at invert and one low flow sluice. Other structures include a rolled homogenous earthen dike 15 feet high and 4,600 feet long located 3.8 miles southwest of the dam. Land includes 7,223 fee acres and 352 flowage easement acres. There are three recreation areas at the project.
  • Delaware Lake

    Delaware Lake is part of a system of dams that reduce flood stages in the Olentangy, Scioto, and
  • Dewey Lake

    Dewey Lake is part of the integrated flood reduction system operated by the Corp of Engineers for the entire Ohio River Basin. When the lakes in this system are operated as a vast storage system, flood crests along the Ohio can be significantly reduced. Construction of Dewey Dam began in 1946 and was completed in 1949.
  • Dickenson County Non-structural Flood Damage Reduction Project (Section 202)

    The Dickenson County Non-structural Flood Damage Reduction Project consists of voluntary floodproofing, relocations, floodplain acquisitions and demolition of structures, authorized under the Section 202 of the Energy and Water Development Appropriation Act of 1981. Section 202 was authorized by the Energy and Water Development Appropriation Act of 1981 and amended by Section 105 of the Energy and Water Development Act, 1997, as a response to flooding in the Tug and Levisa Fork basins.
  • Dillon Lake

    Naming of Dillon Lake followed a long standing US Army Corps of Engineers tradition of naming the
  • Dover Dam

    Dover Dam is located in Tuscarawas County, Ohio, in the Tuscarawas River, approximately three and one-half miles northeast of Dover, Ohio. Dover Dam is a concrete gravity structure with a maximum height of 83 feet above streambed. The top overall length is 824 feet at elevation 931, m.s.l. An uncontrolled ogee spillway is situated in the center channel section.
  • East Lynn Lake

    East Lynn Lake is located on the East Fork of Twelvepole Creek, 10 miles south of Wayne, WV, on State Route 37. East Lynn Lake was constructed primarily for flood control, water quality, fish management, and recreation. There is a total of 24,821 acres of project lands and waters at East Lynn.
  • Fishtrap Lake

    After extensive field studies and cost estimates were made, Congress appropriated funds. Construction began in February 1962. President Lyndon B. Johnson dedicated the project on October 26, 1968. The dam, built of native rock with a clay waterproof core, is 195 feet high and 1,000 feet long.
  • Flowage Easements

     How it all beganThe Great Flood of 1913 (March 23-March 26)A Few Key Points Death Toll estimated at
  • Grayson Lake

    The impounded waters of the Little Sandy River form the 1,510 acre, 20-mile long Grayson Lake. Narrow and winding, the lake's scenic cliffs range from 30 to 200 feet high above the lake surface. The magnificently sculptured cliffs have a smooth, contoured surface enhanced by centuries of weathering.
  • Greenup Locks and Dam

    The locks were open to navigation in 1962. The U.S. Army Corps of Engineers replaced a set of aging gates at the Greenup Locks and Dam in 2012 at a cost of approximately $12 million.
  • History of Bluestone Dam

    History of Bluestone DamDescriptionLOCATION:Hinton vicinity on the New River, approximately 65 miles
  • Huntington District Water Resource Project Agreements

      Huntington District Project Partnership Agreements
  • Jenkins House

    The Robert C. Byrd Dam Replacement Project (RC Byrd Project) was authorized under Section 301(a) of the Water Resources Development Act (WRDA) of 1986 with funds appropriated by the Supplemental Appropriations Act, 1985. The project resulted in two additional lock chambers to the original dam structure, and efforts to mitigate the environmental impacts.