New Lock at the Soo 2021 construction begins
The U.S. Army Corps of Engineers (USACE) New Lock at the Soo project is on schedule as construction resumes on phase one and is initiated on phase two this week.

Download Image: Full Size (2.45 MB)
Photo by: Detroit District |  VIRIN: 210413-A-WR196-162.JPG