Crew installs 249-ton hydropower rotor at Center Hill Dam
Kye Moss of Voith Hydro guides a 249-ton rotor during its installation into hydropower unit two at Center Hill Dam in Lancaster, Tenn., June 19, 2017. The U.S. Army Corps of Engineers Nashville District is rehabilitating the unit and expects to bring it online in late July after the completion of its assembly and load testing.

Download Image: Full Size (0.33 MB)
Tags:
Photo by: Lee Roberts |  VIRIN: 170619-A-EO110-012.JPG