Harlan Flood Control Project dedicated 20 years ago
This is a completed portion of the flood wall in Loyall, Ky., Jan. 22, 1999. The U.S. Army Corps of Engineers Nashville District constructed the wall as part of the Harlan Flood Control Project, a decade-long construction project to provide a maximum level of flood protection to the towns of Harlan, Baxter, Loyall and Rio Vista in Harlan County, Kentucky.

Download Image: Full Size (0.49 MB)
Tags:
Photo by: USACE Photo |  VIRIN: 990122-A-A1409-1025.JPG