Willow Island Locks and Dam

Willow Island Locks and Dam

Authority
River and Harbor Act of 3 March 1909, Sixtieth Congress, 2nd Session.

Cost
Estimated construction $76,520,800.

Dam
Non-navigable, high-lift, gated dam, top length 1,128' including 111-foot fixed weir with 84-foot open crest. Eight tainter gates, clear span 110' between piers, damming height 26' above sills, clearance above maximum high water when fully raised approximately 5'.

Easements
Of an estimated 1,750 acres in the project, approximately 92.8 acres fee required for the lock site, 32.1 acres fee at the abutment site, 13.3 acres fee for recreation site, .06 acre fee at radio site and flowage easements or other lesser interests over the remaining area.

Hydroelectric
N/A

Locks
Two parallel locks, main lock 110' by 1200', auxiliary lock 110' by 600', miter service gates, vertical-lift emergency gates.

Net Land Owned
92.8 acres fee at lock site. 32.1 acres fee at abutment site. 13.3 acres fee at recreation sites. 0.06 acres fee at radio relay site. 1612.1 acres flowage easements which includes 63.12 acres flowage rights by special use permit from D.O.A., U.S. Forest Service.

Pools
Normal upper pool elevation 602.0' m.s.l., upper pool length 35.3 miles to Hannibal Dam, normal upper pool surface area 6,400 acres, normal lower pool elevation 582.0' m.s.l., (upper pool of Belleville Dam) normal lift 20.0'.

Relocations
No extensive relocations necessary, but remedial measures required to adapt certain facilities to new pool conditions. Facilities include railroad and highway drainage structures and embankment slopes, municipal sewer outfalls and water intakes, pipe lines, power and communication lines, and water terminals.

Status
Construction began in January 1967 and the total project is 100 percent complete. The locks construction contract was awarded in October 1968 and placed in operation in January 1972. Dam construction was initiated in December 1971 and completed in 1976. The pool was raised to full height in September 1975.

Recreation
Three recreation areas are existing or proposed for development


Contact Information
740-374-8710

How To Find Us
Ohio River, 161.7 miles downstream from Pittsburgh, PA, and 3.4 miles upstream from Waverly, WV, replaced Locks and Dams Nos. 15, 16 and 17..




Hydropower Projects

Hydropower
1/12/2024
The Nashville District Hydropower Program began under the Flood Control Act of 1938, which authorized minimum provisions for hydropower at flood control projects.  The first power plant constructed in...
Kentucky Lock
1/11/2024
Kentucky Lock is located near Gilbertsville, Kentucky, 22.4 miles from the confluence of the Tennessee and Ohio Rivers.  It is 20 miles east of Paducah, Kentucky. The 184-mile reservoir created by...
Wolf Creek Dam
1/11/2024
History of Wolf Creek DamThe Wolf Creek Project was authorized by the Flood Control Act of 1938 and the Rivers and Harbor Act of 1946.  Construction of the project, designed and supervised by the U.S...
Old Hickory Dam
1/11/2024
HistoryThe Old Hickory Lock and Dam, located on the Cumberland River at mile 216.2 in Sumner and Davidson Counties, Tennessee, and are approximately 25 miles upstream from Nashville, Tenn. The City of...
Martins Fork Dam
1/11/2024
HistoryMartins Fork Lake is located at river mile 15.6 on the Martins Fork of the Cumberland River in the scenic mountainous terrain of Harlan County, 13 miles southeast of the town of Harlan,...
Laurel River Dam
1/11/2024
Laurel River Lake is a key project in the development of the Cumberland River Basin.  The lake is located in southeastern Kentucky, encompassing portions of Laurel and Whitley Counties. In the 1960's,...