Search

Draft Environmental Assessment for proposed environmental infrastructure project located in the Village of Matteson, Illinois

Chicago District
Published Feb. 15, 2024
Expiration date: 3/16/2024

The Draft EA considers three alternatives to improve water supply infrastructure in the area. The recommended plan includes replacing 1500 feet of 6-inch water main along Violet Lane in Matteson. This alternative would replace all water main on Violet Lane, from its intersection with Carnation Lane to the north, to the intersection with Rose Lane to the south.

The 30-day public review period will be held from February 16, 2024, through March 16, 2024. As part of the public review period, USACE would appreciate any comments or concerns associated with any potential effects to environmental and cultural resources of the proposed action. The Draft EA is available at: https://www.lrc.usace.army.mil/Missions/Civil-Works-Projects/Public-Review-Documents/


Comments regarding the proposed action may be submitted via email or mail. Emailed comments should be sent to jason.zylka@usace.army.mil Mailed comments should be sent to the attention of Mr. Jason Zylka (CELRC-PDL-E) at the U.S. Army Corps of Engineers, 231 South LaSalle Street, Suite 1500, Chicago, IL 60604. All comments should be postmarked or emailed by March 16, 2024.