Search

Tygart Lake

Pittsburgh District
Published Jan. 10, 2024

Authorized by the Rivers and Harbors Act of 1935, Tygart Dam was the first of 16 flood control projects in the Pittsburgh District. The project provides flood protection for the Tygart River Valley as well as for the Monongahela and upper Ohio Rivers.

Tygart has the capability to store the equivalent run-off of 4.56 inches of precipitation from its 1,184 square mile drainage area. The project’s flood control benefits were dramatically demonstrated during the November 1985 floods when Tygart alone prevented an amazing $195.8 million in damages and lowered flood crests along the Monongahela River by as much as 6.8 feet. Since its completion in 1938, Tygart has prevented flood damages estimated to be nearly $1.2 billion. When compared to the flood control benefits which have resulted, the $18.5 million construction costs are greatly overshadowed.

In addition to flood control, the Tygart project was also authorized for navigation and water supply purposes.  During the summer and fall low-water season, Tygart releases additional water downstream to meet navigation water supply requirements on the Monongahela and upper Ohio River for commercial navigation. The increased flow also improves water quality and quantity for domestic and industrial use, recreation, esthetics and aquatic life.