Find News

Contact a Public Affairs Office

Great Lakes and Ohio River Division
(513) 684-3097 or (513) 684-3010
Buffalo District
1-800-833-6390 (option 3)
Chicago District
312-846-5330
Detroit District
313-226-4680
Huntington District
304-399-5353
Louisville District
(502) 315-6766
Nashville District
(615) 736-7161
Pittsburgh District
412-395-7502
Results:
Tag: infrastructure
Clear
  • May

    New Technology Coming to Black Rock Lock: Fiber Reinforced Polymer Bulkheads

    The U.S. Army Corps of Engineers, Buffalo District, and the Inland Navigation Design Center are introducing new technology to the Black Rock Lock, Buffalo, New York, with the proposed use of fiber reinforced polymer in the construction of new bulkheads. At a lock, bulkheads are stackable structures used to dewater the chamber for maintenance. Cranes lower the bulkheads into place, and once all seals are verified, the lock can be pumped dry.
  • August

    From antiquated to advanced: Army Corps navigates the future by modernizing locks across Ohio River Basin

    When people think of the Ohio River, they may think of a single, natural waterway traveling 981 miles from the Point of Pittsburgh to Cairo, Illinois. However, the river exists as part of the much larger and more complex Ohio River Basin, which urgently needs modernization.
  • July

    Cheatham Lock undergoes stop log seal maintenance

    ASHLAND CITY, Tenn. (July 29, 2022)— Nashville District engineers reset upper approach stop logs on Cheatham Lock in Ashland City, TN. Engineers from the USACE Huntington District Light Capacity Fleet assisted with the maintenance work completed July 25.
  • January

    Corps upgrades Paden City’s wastewater treatment systems

    Ever had a problem with the septic tank in your yard? The cost to replace it, and consequences if you do not, can really stink – even more so when the problem is on a community-wide level. That is why the U.S. Army Corps of Engineers Pittsburgh District is partnering with Paden City to upgrade the sanitary sewer collection and treatment facilities in Tyler and Wetzel counties as part of a $2 million environmental infrastructure project.