The most recent appropriations for the Department of War expired at 11:59 p.m. EST on September 30, 2025. Military personnel will continue in a normal duty status without pay until such time as a continuing resolution or appropriations are passed by Congress and signed into law. Civilian personnel not engaged in exempted or excepted activities will be placed in a non-work, non-pay status.

Search

Results:
Tag: Bolivar Dam
Clear
  • Bolivar Dam

    Bolivar Dam is within the Upper Tuscarawas section of the Muskingum Area. It was authorized by Section 4 of the Flood Control Act (FCA) of 1938, as amended by Section 4 of the FCA of 1939. Primary project purposes are flood damage reduction, recreation, and fish and wildlife. Land includes 713 fee acres and 8,282 flowage easement acres. The dam was completed September 1938 and serves a drainage area of 504 square miles. The dam is a rolled earth-fill with impervious core, 87 ft. tall, 6,300 ft. long and 25 ft. wide at the top and 480 ft. wide at the base.