Public Review Documents & Approved Review Plans

  • Scoping Notice for a Proposed Lake Barkley Sediment Removal Project; Stewart County, Tennessee

    Expiration date: 3/25/2025

    The U. S. Army Corps of Engineers, Nashville District (USACE) is evaluating the impacts of a proposed sediment removal project, along secondary channels and recreational access areas of the Cumberland River (Lake Barkley Reservoir), Stewart County, Tennessee. The proposed project would remove depositional material (approximate total of 103,000 cubic yards) in order to lower the navigable depth to facilitate continuous year-round navigation and access of the project areas. Sediment would either be beneficially reused and placed onsite to create emergent wetlands (preferred) or placed at a nearby, upland location.
  • Section 408 Request No. 408-LRP-2024-0006: Request to Alter the DuBois Local Protection Project for the Installation of a Natural Gas Line by the City of DuBois, Jefferson County, Pennsylvania

    Expiration date: 3/6/2025

    The U.S. Army Corps of Engineers (USACE) Pittsburgh District is evaluating a proposed alteration to the DuBois Local Protection Project (DuBois LPP). The City of DuBois submitted a request under Section 14 of the Rivers and Harbors Act of 1899 (33 U.S.C. Section 408) to the Pittsburgh District to install a new natural gas pipeline below Sandy Lick Creek near Guy Avenue to provide gas for the Wastewater Treatment Plant. The proposed gas line is a four-inch HDPE pipe and will be bored beneath the stream from outside of the top of banks.
  • Lake Barkley Shoreline Management Plan (SMP) Review

    Expiration date: 5/1/2025

    The Lake Barkley Shoreline Management Plan (SMP) Review plan contains policies and guidelines for the effective long-range management of the shoreline resources on Lake Barkley. The primary objective of the SMP is to balance private shoreline uses, such as private boat docks, with the protection and conservation of Lake Barkley’s natural resources. In order to address ever changing public use demands affecting these natural resources, the SMP is reviewed every five years and updated if necessary. During this review process, public workshops will be held to seek the input from users of Lake Barkley. The workshops will begin at 6 p.m. on each of the following dates: • March 25 at Lee S. Jones Park (Lyon Convention Center) in Eddyville, Kentucky • March 27 at Lake Barkley State Resort Park (Sunrise Room) in Cadiz, Kentucky • April 1 at the Stewart County Visitor Center in Dover, Tennessee Written comments will also be accepted for 30 days following the public workshops. If you have any questions or concerns, please feel free to contact Biologist Wes Davenport at (270) 362-4236 or at LakeBarkley@usace.army.mil.
  • Final EA and Signed FONSI for Sunset Marina Expansion Project; Pickett County, Tennessee

    The Environmental Assessment (E)A has been finalized and FONSI signed for the proposed Sunset Marina Project.

  • EAXX-202-00-H5P-1736874225

    Expiration date: 3/14/2025

    The proposed project is for the removal of approximately 35,000 cubic yards of sediment from the lakeward side of the west breakwater in order to maintain the function of the breakwater and protect navigation within the Entrance Channel and Inner Harbor Channel. The removal of the accumulated sediment will restore the ability of the breakwater to dissipate wave energy, prevent overtopping, and protect the navigation channel. Upon completion of the sediment removal, sediments may be placed in placement area 1 or 2, in the previously authorized near-shore placement site, or in the designated open-water placement site. The 2026 sediment removal operation at Barcelona Harbor is tentatively scheduled to be performed during the period between 15 June and 15 September.
  • Barcelona Harbor Advance Maintenance Dredging Project

    Expiration date: 3/6/2025

    Barcelona Harbor is located on Lake Erie in the Town of Westfield, NY. The harbor serves the Town of Westfield, a private marina, commercial and charter fishing interests, and a large recreational boating community. It is a shallow-draft recreational harbor maintained by the USACE. The harbor is protected by east and west breakwaters that shelter the federal navigation channel. Its purpose is to provide sufficient information on the potential environmental effects of the proposed USACE advance maintenance dredging project in Barcelona Harbor.

  • Draft Environmental Assessment/FONSI - Village of Park Forest Water Main Improvement Project

    Expiration date: 3/6/2025

    The proposed project would improve water distribution infrastructure within the Village of Park Forest, Cook County, Illinois. Existing water supply infrastructure in the Village of Park Forest has reached the end of its useful lifespan. There have been more than 20 main breaks within the project area in the past five years. The proposed project

  • Notice of Availability of Environmental Assessment

    Expiration date: 2/25/2025

    The U.S. Army Corps of Engineers, Louisville District (District) announces the availability of the Draft Environmental Assessment for the 2025 Leeco Road Campground Sewer Extension Project, Leslie County, Kentucky.
  • Section 340 Grassy Creek Waterline Extension Project

    The draft EA/FONSI for the Section 340 Grassy Creek waterline extension project are available for public review and comment.
  • LRL-2025-002

    Expiration date: 2/27/2025

    This Report is an update on undertakings at our Indiana Lake projects for the 2024 calendar year. This Report is being provided for public review and comment as one of the requirements under the Programmatic Agreement (PA) Among the U.S. Army Corps of Engineers, Louisville District; the Indiana State Historic Preservation Officer; the Advisory
Chick Lock