On the south shore of Lake Superior on the North Face of Keweenaw Point, 31 miles northeasterly from the Upper Entrance of Keweenaw Waterway. Project provides for a short entrance channel, a guide pier marking the entrance on the west side, and a harbor basin. Project depths are 14 feet in the entrance channel and 12 feet in harbor basin.
Project Map Dredging Information
eHydro Website
2022 Eagle Harbor PCS
2021 Eagle Harbor PCS
2020 Eagle Harbor PCS
2019 Eagle PDF
2019 Eagle DGN