The U.S. Army Corps of Engineers (USACE), Buffalo District and its contractor, Michigan-based Ryba Marine Construction Co., have completed repairs to the section of the Buffalo North Breakwater breached by a severe storm in October 2019.
The storm caused extensive damage to the approximately 2,200-foot breakwater structure, including the 300-foot breach in the north end. Fixing its crest and slopes using a rubble mound armor stone overlay, the breach was repaired in less than two months.