Wilson Lock main chamber reopening planned for 2025
A view into the de-watered main Wilson Lock chamber on Nov. 27, 2024 in Florence, Alabama. The U.S. Army Corps of Engineers Regional Rivers Repair Fleet de-watered the lock chamber to allow engineers to thoroughly inspect the lock miter gates and begin critical repairs.

Download Image: Full Size (0.39 MB)
Photo by: Michael Davis |  VIRIN: 241125-A-US975-1113.JPG