Turbine-generators replaced at Center Hill Hydropower Plant
A new auto-venting stainless steel turbine runner in lowered into Unit #2 by Nashville District engineers at the Center Hill Hydropower Plant on October 17, 2016, in Lancaster, Tennessee.

Download Image: Full Size (1.58 MB)
Tags:
Photo by: USACE Photo |  VIRIN: 161017-A-A1409-0003.JPG