The U.S. Army Corps of Engineers today released for public comment two draft Aquatic Pathway Assessment Reports for Swan River and Libby Branch of Swan River in Minnesota that evaluate key evidence to estimate the likelihood of an aquatic pathway forming and the possibility of aquatic nuisance species using it to reach the adjacent basin.