251210-A-GI410-1010
A contractor makes adjustments to one of the boilers in the Central Utility Plant at the Louisville VA Medical Center Dec. 10, 2025. Boilers will be used in a variety of systems throughout the medical center and supporting infrastructure.

Download Image: Full Size (1.8 MB)
Photo by: Michael Maddox |  VIRIN: 251210-A-GI410-1010.JPG