Massive Wall Beams make their move to Chickamauga Lock
SPRING CITY, Tenn. — Barnhart crew members use a hydraulic power system to lift a prefabricated wall beam onto a barge for delivery to the Chickamauga Lock Replacement Project’s upstream approach wall contract near Watts Bar Dam Aug. 28, 2025. (USACE photo by Noe Gonzalez)

Download Image: Full Size (5.96 MB)
Photo by: Noe Gonzalez |  VIRIN: 250828-A-LQ420-0010.JPG