USACE, EPA advance long-term water quality improvements in Milford, Ohio
A contractor takes a groundwater sample from a monitoring well in January 2025 prior to initiation of the treatability study.

Download Image: Full Size (2.58 MB)
Tags:
Photo by: USACE |  VIRIN: 250411-A-A1409-1001.JPG