Ready to Respond: Water & Emergency Management
The Pittsburgh District mitigates flood damages throughout its 26,000 square foot region with a network of 16 strategically placed reservoirs that capture storm runoff and reduce downstream risks. The system of reservoirs has prevented $48 billion in damages since their construction began after the 1936 St. Patrick’s Day Flood. The district monitors water levels year-round, adjusts dam operations during storms, collaborates with local, state, and federal agencies, and provides technical and disaster recovery assistance to improve community resilience against future storms. (U.S. Army Corps of Engineers Pittsburgh District graphic by Michel Sauret)