Buffalo Outer Harbor Wetland Ecosystem Phase I Construction
A crane and mechanical claw aboard a derrick boat place loose stone from a barge to construct a stone breakwater in Buffalo, N.Y., Oct. 13, 2023. The breakwater will contain sediment dredged from the Buffalo River, to form the base of a new wetland ecosystem in the abandoned Shipping Slip 3 on the city’s Outer Harbor. (U.S. Army photo by Avery Schneider)