Buffalo Outer Harbor Wetland Ecosystem Phase I Construction
A crane and mechanical claw aboard a derrick boat place loose stone from a barge to construct a stone breakwater in Buffalo, N.Y., Oct. 13, 2023. The breakwater will contain sediment dredged from the Buffalo River, to form the base of a new wetland ecosystem in the abandoned Shipping Slip 3 on the city’s Outer Harbor. (U.S. Army photo by Avery Schneider)

Download Image: Full Size (5.13 MB)
Tags:
Photo by: Avery Schneider |  VIRIN: 231016-A-HB296-1001.JPG
The most recent appropriations for the Department of War expired at 11:59 p.m. EST on September 30, 2025. Military personnel will continue in a normal duty status without pay until such time as a continuing resolution or appropriations are passed by Congress and signed into law. Civilian personnel not engaged in exempted or excepted activities will be placed in a non-work, non-pay status.