The most recent appropriations for the Department of War expired at 11:59 p.m. EST on September 30, 2025. Military personnel will continue in a normal duty status without pay until such time as a continuing resolution or appropriations are passed by Congress and signed into law. Civilian personnel not engaged in exempted or excepted activities will be placed in a non-work, non-pay status.

Search

Results:
Tag: Winfield Locks and Dam
Clear
  • Winfield Locks and Dam

    Dam Non-navigable, gated dam, top length 676'-9 . Six roller crest gates and one tainter gate, spanning 100'-3 1/2" between piers. Damming height 28'. Easements Of an estimated Easement Acreage of 1,243 acres for the project, approximately 315.53 acres fee required for the lock site, 15 acres fee for the abutment site, 4.33 acres for recreation site, and flowage easements or other lesser interests over the remaining area.