An official website of the United States government
Here's how you know
Official websites use .mil
A
.mil
website belongs to an official U.S. Department of Defense organization in the United States.
Secure .mil websites use HTTPS
A
lock (
lock
)
or
https://
means you’ve safely connected to the .mil website. Share sensitive information only on official, secure websites.
Skip to main content (Press Enter).
US Army Corps of Engineers
Great Lakes and Ohio River Division Website
®
Home
About
Leadership
Districts
Buffalo District
Chicago District
Community Support Request
Detroit District
Huntington District
Louisville District
Nashville District
Pittsburgh District
Connect With Us
Join Our Team
Media
Media Releases
News
Images
Announcements
Water Information
Water Management
Great Lakes and Harbors
Water Level Data
Water Level Forecasts
Outflows and Regulation
Basin Conditions
Rivers and Reservoirs
Flood Risk Management
Navigation
Great Lakes Navigation Team
Great Lakes Dredging Team
Ohio River
Hydropower
Recreation
Indiana
Kentucky
Michigan & Minnesota
New York
Ohio
Pennsylvania
Tennessee
Virginia
West Virginia
Wetlands & Permits
Alabama
Illinois
Indiana
Kentucky
Michigan
Mississippi
New York
Ohio
Pennsylvania
Tennessee
Virginia
West Virginia
Mission
Programs
Projects
Environmental
Emergency Preparedness Response
Real Estate
Military Construction & Reserve
Design Guides
Interagency & International Support
Public Review & Approved Plans
Section 408
Business With Us
Home
/
Mission
/
Projects
Find a Project
Search
Filter
1. By State
...Indiana
...Kentucky
...Maryland
...Michigan
...Minnesota
...Ohio
...Pennsylvania
...Tennessee
...Virginia
...West Virginia
...Wisconsin
2. By Project Program/Type
...2019 Additional Supplemental Appropriations for Disaster Relief
...Air Force Reserve
...Army Reserve
...Continuing Authorities Program
...Dam Safety
...Flood Control Act
...Formerly Utilized Defense Sites (FUDS)
...Formerly Utilized Sites Remedial Action Program (FUSRAP)
...Great Lakes Restoration Initiative (GLRI)
...International & Interagency Support (IIS)
...Levee Safety
...Mega Projects
...Military Construction (MILCON)
...Other
...Real Estate
...Regulatory
...Rivers and Harbors Act
...Section 202
...Section 214
...Section 219
...Section 340
...Section 408
...Section 531
...Section 571
...Section 594
...Water Resources Development Act (WRDA)
3. Project Attribute/Category
...Civil Works
...Construction
...Dam
...Environmental
...Flood Protection Project
...Flood Risk Management/Reservoirs
......Master Plans
...Great Lakes and Mississippi River Interbasin Study (GLMRIS)
...Great Lakes Fishery & Ecosystem Restoration Program (GLFER)
...Harbors
...Hydropower
...Mega Projects
...Navigation
......Allegheny River
......Clinch River
......Cumberland River
......Green River
......Kanawha River
......Monongahela River
......Ohio River
......St. Marys River
......Tennessee River
...Other
...Planning Center of Expertise for Inland Navigation
...Policy
...Public Review
...Studies
...Tribal Relations
...Water Management
...Wildlife
4. By River
...Allegheny River
...Clinch River
...Cumberland River
...Green River
...Kanawha River
...Monongahela River
...Ohio River
...Tennessee River
5. By District
...Buffalo District
...Chicago District
...Detroit District
...Huntington District
...Louisville District
...Nashville District
...Pittsburgh District
Results:
Tag:
Chicago District
Clear
8
Jan 2024
ANS Acoustic Telemetry Fact Sheet
OverviewTelemetry is an automated communications process used to collect data remotely by a monitoring system. The Chicago District Telemetry Monitoring Project implants fish with individually-coded, ultrasonic transmitters in the Upper Illinois Waterway (IWW) and Chicago Area Waterways System (CAWS) to track patterns of fish activity. Transmitted
8
Jan 2024
ANS Electrofishing Fact Sheet
OverviewElectrofishing is a monitoring tool that uses a pulsed direct current electric field, emitted from a boat mounted generator powered pulser to temporarily stun fish. The fish can then be collected via dip net to allow biologists the opportunity to identify species. Electrofishing is used by the Asian Carp Regional Coordinating Committee’s
8
Jan 2024
ANS Frequently Asked Question
Frequently Asked QuestionsWhat are you doing to prevent the spread of Asian carp?The Corps is committed to sustaining our water resources and protecting our natural treasures, our Great Lakes.The Corps is a member of the Asian Carp Regional Coordinating Committee, which is comprised of various federal and state agencies with niche roles and
8
Jan 2024
Aquatic Nuisance Species
Aquatic nuisance species are nonindigenous species that threaten the diversity or abundance of native species or the ecological stability of infested waters, or commercial, agricultural, aquacultural or recreational activities dependent on such waters. See Section 1003(2) of the Nonindigenous Aquatic Nuisance Prevention and Control Act of 1990, 16 U.S.C. § 4702(1) (2010).
9
Jan 2024
Big Suamico River
Serves as a shallow draft recreational harbor. Project depth is 8 feet throughout. Approximately 3,700 feet of maintained federal channel.
9
Jan 2024
Burns Waterway Harbor
Serves as a commercial harbor. Project depth is 30 feet in the approach channel, 28 feet in the outer harbor, and 27 feet in both harbor arms.
9
Jan 2024
Burns Waterway Small Boat Harbor
Serves as a recreational harbor. Project depth is 11 feet in the approach channel, 10 feet in the inner harbor, and 6 feet in the river channel.
9
Jan 2024
Calumet Harbor
Serves as a commercial harbor. Project depth is 29 feet in the approach channel, 28 feet in the outer harbor, and 27 feet in the main river channel. Approximately 12,153 feet of steel sheet pile and timber crib breakwater structures. The federal navigation channel within the harbor is 4.4 miles long.
9
Jan 2024
Calumet Harbor Dredging
A Dredged Material Management Plan (DMMP) was approved in September 2020 that identified vertical expansion of the current facility as the lowest cost, environmentally acceptable alternative for managing dredged sediment for the next 20 years.
9
Jan 2024
Calumet Region Enviromental Infrastructure
This project provides technical planning, design and construction assistance to non-federal interests who have environmental infrastructure needs across Benton, Jasper, Lake, Newton and Porter Counties, Indiana.
21
Dec 2023
Chicago Area Waterway
Stages, flows, and basin precipitation for Lake Michigan, Chicago River, Des Plaines River, Chicago Sanitary and Ship Canal, Little Calumet River, Thorn Creek, Hart Ditch, Fox River, Du Page River, and Kankakee River.
9
Jan 2024
Chicago District Locks
The Chicago District operates three locks within our district footprint, the Chicago Lock, The Lockport Lock, and the T.J. O'Brien Lock.
9
Jan 2024
Chicago Harbor
Authorized as a commercial harbor. Project depth is 29 feet in the Lake Michigan harbor approach, 28 feet in the outer harbor, and 21 feet to Rush Street.
9
Jan 2024
Chicago Harbor Lock
The Chicago Harbor Lock is located in the city of Chicago – adjacent to Navy Pier – and separates the waters of the Lake Michigan basin from the Chicago River.
9
Jan 2024
Chicago River
The project consists of a river navigation channel that is 2.97 miles long at -21.0 ft LWD from Michigan Avenue to North Avenue. A navigation channel approximately 3.7 miles at -9.0 ft LWD deep from North Avenue to Addison Street is also authorized, but not constructed. The project includes a perpetual responsibility for water control and emergency monitoring of the waterways within the Chicago District.
9
Jan 2024
Chicago Sanitary and Ship Canal (CSSC) Dispersal Barriers
The Chicago Sanitary and Ship Canal (CSSC) is a man-made waterway that connects the Chicago and the Des Plaines Rivers forming an aquatic connection between Lake Michigan and the Mississippi River basin. Dispersal barriers were constructed to generate an in-water electric field to prevent the spread of invasive fish species between these watersheds.
9
Jan 2024
Chicago Shoreline
The project non-federal sponsors are required to complete the remaining two segments of the project, Morgan Shoals (45th to 51st Street) and Promontory Point segment (54th to 56th Streets), with Corps oversight at their expense to fulfill their obligations under the existing PCA. However, WRDA 2022 language directs the Corps to cost share the Locally Preferred Plan for those two remaining segments.
9
Jan 2024
Chicago Shoreline General Reevaluation Report
This project will address significant coastal storm damage experienced along at-risk reaches of the shoreline of Lake Michigan. The study will reevaluate the remaining unconstructed components of the authorized project and other coastal storm damage risk including portions of Lake Shore Drive, Sheridan Road, South Water Purification Plant, and La Rabida Children’s Hospital.
9
Jan 2024
Chicago Waterways Restoration Framework Plan
In April 2019, USACE received a request under the Planning Assistance to States authority to assist the City of Chicago’s Department of Planning and Development (DPD) in updating and expanding physical and social data on the inland waterways. Given the input from the River Ecology and Governance Task Force, DPD requested assistance in developing a comprehensive planning framework for the Chicago waterways. USACE and DPD invited the Metropolitan Water Reclamation District of Greater Chicago (MWRD), the Forest Preserve District of Cook County (FPDCC), and the Chicago Park District (CPD) to join the partnership, starting a robust collaboration to develop the Chicago Waterways Restoration Framework Plan.
11
Jan 2024
Floodplain Management Services Program
Most people know that the U.S. Army Corps of Engineers builds water resource projects, like dams and levees. Not so well known; however, is that the Corps also provides assistance to help states, eligible Native American Tribes, and local governments prepare their own plans and initiate their own actions to manage water and related land resources.
9
Jan 2024
Fox River Connectivity & Habitat Study, IL
The Fox River Connectivity and Habitat Study Area includes a reach of 10 dams from Algonquin in McHenry County to the Montgomery Dam in Kane County.
9
Jan 2024
Fox River, Wisconsin
The Fox River extends approximately 40 miles from Lake Winnebago to Green Bay. The project includes 9 dams and 17 locks . These features are maintained for flood control, water supply, and power generation.
9
Jan 2024
Green Bay Harbor
Serves as a deep draft commercial harbor. Project depth is 26 feet for about 11.5 miles upstream from the entrance channel, 24 feet from Grassy Island to 0.5 miles upstream from the mouth of the Fox River, and 22 feet 0.5 miles upstream of the river mouth to 3.3 miles upstream of the river mouth.
9
Jan 2024
Indiana Harbor
Serves as a commercial harbor. Project depth is 29 feet in the approach channel, 28 feet in the turning basin, 27 feet in the outer dock area, and 22 feet within the main and two branch channels.
9
Jan 2024
Kenosha harbor
This harbor is a deep draft commercial harbor that primarily serves recreational users, but also supports transitory barge traffic. Project depth is generally between 25 and 27 feet.
9
Jan 2024
Kewaunee Harbor
This project is a deep draft harbor that primarily serves recreational users, but also supports transitory barge traffic. The project depth throughout the harbor is 20 feet.
21
Dec 2023
Lake Winnebago
This article provides notices, daily data tables, and charts of temperatures, levels, and flows for Lake Winnebago and connecting rivers.
9
Jan 2024
Lockport Lock
Opened in 1933, Lockport Lock & Dam is 35 miles downstream of T.J O’Brien Lock & Dam. The facility is a unit of the Inland Waterway Navigation System and is one of eight such facilities between Chicago and Versailles, Illinois. The lock is 110 feet wide by 600 feet long. Maximum vertical lift is 42.0 feet; the average lift is 39 feet.
9
Jan 2024
Michigan City Harbor
Shallow draft commercial harbor that primarily serves recreational uses. Project depth is 14 feet in the harbor entrance, 12 feet in the outer harbor, 10 feet in turning basin No. 1, 10 feet in Trail Creek from turning basin No. 1 to turning basin No. 2, and 6 feet in Trail Creek from turning basin No. 2 to E. Street.
9
Jan 2024
Milwaukee Harbor
Commercial harbor with project depths of 30 feet in the approach, 28 feet in the entrance channel, 27 feet in a major portion of the south basin, and 21 feet in the north basin. Over 21,000 feet of structures including breakwaters, piers, and revetments.
10
Jan 2024
Northerly Island
The project area is a 91-acre peninsula found on the shores of Lake Michigan. The project restoration was primarily on the south side of the island and encompasses approximately 40 acres of land.
9
Jan 2024
Oconto Harbor
Serves as a shallow draft harbor primarily serving recreational users. Project depth is 15 feet. Approximately 4,800 feet of federal navigation channels.
9
Jan 2024
Pensaukee Harbor
Serves as a shallow draft recreational harbor. Project depth is 8 feet. Contains nearly one mile of federal navigation channel stretching from the mouth of the Pensaukee River into Lake Michigan.
9
Jan 2024
Port Washington Harbor
Port Washington serves as a deep draft commercial harbor. Project depth is 21 feet at the entrance to the harbor and in the inner channels and 18 feet in the inner basins. Project depths providing access to the marina and launch ramp vary between 8 and 10 feet.
10
Jan 2024
Santiago Creek
The purpose of the SARMP, including the Santiago Creek component, is to provide flood risk reduction to areas susceptible to flooding within the counties of San Bernardino, Riverside, and Orange. The need for the project is due to significant flooding along the Santa Ana River – including Santiago Creek – within Orange, Riverside, and San Bernardino counties in California, which has been documented since at least 1897.
9
Jan 2024
Sheboygan Harbor
Deep draft commercial harbor with 4,000 linear feet of federal channel. Authorized project depth is 25 feet in the entrance channel, 21 feet in the inner harbor channel and turning basin up to the 8th Street bridge, and 15 feet upstream of the 8th Street bridge.
10
Sep 2024
South Branch Pike River
The South Branch Pike River is in a rapidly urbanizing watershed with substantial urban and agricultural lands.The purpose of the project is to restore approximately 246 acres of habitat through restored hydrology, channel modification, in-stream structures, and native plantings. Current StatusThe PPA was executed on 3 May 2022. The design is in
9
Jan 2024
Sturgeon Bay Lake Michigan Ship Canal
Serves as a deep draft commercial ship canal with 8.5 miles of federal channel. Authorized project depths of 22 to 23 feet in the entrance channel and canal; 20 feet in the turning basin at Sturgeon Bay.
9
Jan 2024
T.J. O'Brien Lock
The T.J. O’Brien Lock and Controlling Works is located at the entrance to Lake Michigan (River Mile 326.0), Calumet River, in Chicago, Illinois. The facility is a unit of the Inland Waterway Navigation System and is one of nine such facilities between Chicago and Versailles, Illinois.
10
Jan 2024
Thornton Reservoir
The Thornton Reservoir significantly reduces overland and basement flooding by protecting 35,090 structures. It also improves the quality of area waterways by significantly reducing the backflow of untreated sewage into Lake Michigan and by storing combined sewer overflow during floods before release to the Calumet wastewater treatment plant. The original 14,600 acre-feet reservoir was increased by 9,600 acre-feet to a total volume of 24,200 acre-feet (7.9 billion gallons) for the new “composite” reservoir.
9
Jan 2024
Washington Island
Consists of two recreational harbors: Detroit Harbor and Jackson Harbor. The project depth of Detroit Harbor is 14 feet, and the project depth of Jackson Harbor is 12 feet. There are approximately 4,000 feet of maintained federal channel.
11
Jan 2024
Water Management - Chicago Area Waterway
Chicago Area Waterway Stages and Flows
9
Jan 2024
Waukegan Harbor
Serves as a deep draft commercial harbor. Project depth is 22 feet in the Lake Michigan harbor approach and 18 feet in the channel.
Through deeds, not words, we are BUILDING STRONG®