The South Branch Pike River is in a rapidly urbanizing watershed with substantial urban and agricultural lands.
The purpose of the project is to restore approximately 246 acres of habitat through restored hydrology, channel modification, in-stream structures, and native plantings.
Current Status
The PPA was executed on 3 May 2022.
The design is in progress and is scheduled to be completed in the summer of 2025.
Project Authorization
Section 206, Water Resources Development Act of 1996, as amended Continuing Authorities Program (CAP)