Breach repairs on Buffalo Harbor North Breakwall
Completed repairs to the section of the Buffalo North Breakwater breached by a severe storm in October 2019 are shown in Buffalo, New York, September 30. The U.S. Army Corps of Engineers, Buffalo District and its contractor, Michigan-based Ryba Marine Construction Co. repaired in less than two months in 2021. (U.S. Army Photo by 1st Lt. Stacey Acapana)