MacArthur Lock opening after seasonal maintenance, extended repair
U.S. Army Corps of Engineers maintenance personnel attach a crane to the first stoplog holding back water for the MacArthur Lock. The Corps of Engineers removed the stoplogs and opened the MacArthur Lock today after seasonal maintenance and an extended repair. (U.S. Army Corps of Engineers photo by Bill Dowell)

Download Image: Full Size (6.29 MB)
Tags:
Photo by: Bill Dowell |  VIRIN: 220618-A-DT641-0184.JPG