Click any column header to sort table data.
| LRB | Sandusky Harbor Dredging - Channel maintenance dredging | Sandusky (Ohio) | $500K-$1M | 237990 | Small Business Set Aside | MATOC | TO | FY25 Q4 | FY25 Q4 |
| LRB | Fairport Dredging - Channel mainenance dredging | Fairport (Ohio) | $1M-$5M | 237990 | Small Business Set Aside | MATOC | TO | FY25 Q2 | FY24 Q3 |
| LRB | Cleveland Harbor Dredging - Channel mainenance dredging | Cleveland (Ohio) | $5M-$10M | 237990 | Small Business Set Aside | NA | IFB | FY25 Q2 | FY25 Q2 |
| LRB | Ashtabula Harbor Dredging - Channel mainenance dredging | Ashtabula (Ohio) | $1M-$5M | 237990 | Small Business Set Aside | MATOC | TO | FY25 Q3 | FY25 Q3 |
| LRB | Buffalo Harbor Dredging - Channel mainenance dredging | Buffalo (New York) | $1M-$5M | 237990 | Small Business Set Aside | MATOC | TO | FY25 Q4 | FY25 Q4 |
| LRB | Conneaut Harbor Dredging - Channel mainenance dredging | Conneaut (Ohio) | $1M-$5M | 237990 | Small Business Set Aside | MATOC | TO | FY25 Q2 | FY25 Q3 |
| LRB | Rocky River Harbor Dredging - Channel mainenance dredging | Rocky River (Ohio) | $500K-$1M | 237990 | Small Business Set Aside | MATOC | TO | FY25 Q3 | FY25 Q3 |
| LRB | Great Sodus/Oak Orchard Harbor Dredging - Channel mainenance dredging | Great Sodus and Oak Orchard (New York) | $500K-$1M | 237990 | Small Business Set Aside | MATOC | TO | FY25 Q2 | FY25 Q4 |
| LRB | Lorain Harbor Dredging - Channel mainenance dredging | Lorain (Ohio) | $1M-$5M | 237990 | Small Business Set Aside | MATOC | TO | FY25 Q3 | FY25 Q3 |
| LRB | Maumee Bay and River Dredging - Channel mainenance dredging | Toledo(Ohio) | $1M-$5M | 237990 | Small Business Set Aside | SATOC | TO | N/A | FY25 Q3 |
| LRB | Oswego Harbor West Arrowhead Breakwater Repair - Repair Breakwater | Oswego (New York) | $5M-$10M | 237990 | Unrestricted | MATOC | TO | FY25 Q2 | FY25 Q3 |
| LRB | SLDA Remediation | Parks Township (Pennsylvania) | $250M-$500M | 562910 | Unrestricted | NA | RFP | FY25 Q3 | FY26 Q2 |
| LRB | Guterl Remediation | Lockport (New York) | $249M | 562910 | Small Business Set Aside | NA | RFP | FY25 Q2 | FY25 Q4 |
| LRB | Big John Salvage River Area | Fairmont (West Virginia) | $25M-$100M | 562910 | Small Business Set Aside | NA | RFP | FY25 Q4 | FY26 Q1 |
| LRB | Big John Salvage Upland Area | Fairmont (West Virginia) | $25M-$100M | 562910 | Small Business Set Aside | NA | RFP | FY25 Q4 | FY26 Q1 |
| LRB | Erie North Pier Repair | Erie (Pennsylvania) | $1M-$5M | 237990 | Unrestricted | MATOC | TO | FY25 Q3 | FY25 Q4 |
| LRB | Boston Mills Ecosystem Restoration | Cleveland (Ohio) | $10M-$25M | 237990 | TBA | NA | IFB | FY25 Q3 | FY25 Q4 |
| LRB | Euclid Creek Ecosystem Restoration | Euclid (Ohio) | $1M-$5M | 237990 | TBA | NA | IFB | FY25 Q3 | FY25 Q4 |
| LRB | Buffalo CDF Repair | Buffalo (New York) | $10M-$25M | 237990 | Unrestricted | MATOC | TO | FY25 Q2 | FY25 Q2 |
| LRB | Barcelona Breakwater Grouting Repair | Barcelona (New York) | $1M-$5M | 237990 | Unrestricted | MATOC | TO | FY25 Q4 | FY25 Q4 |
| LRB | West Valley Spillway Repairs | West Valley(New York) | $1M-$5M | 237990 | Unrestricted | NA | RFP | FY25 Q2 | FY25 Q2 |
| LRB | USDA Grape Research Facility | Geneva (New York) | $25M-$100M | 237990 | Unrestricted | NA | RFP | FY25 Q2 | FY25 Q3 |
| LRC | Replace Windows in Control Tower- Mississinewa Lake- IN | Peru- IN | $50K-100K | TBD | TBD | TBD | TBD | FY25 Q3 | FY25 Q3 |
| LRC | Harbor Channel Maintenance- Big Suamico River- WI | Suamico- WI | $500K-$1M | TBD | TBD | TBD | TBD | FY25 Q3 | FY25 Q3 |
| LRC | Aquatic Ecosystem Restoration- Honey Creek Sec 206 | Milwaukee- WI | $10M-$25M | TBD | TBD | TBD | TBD | FY26 Q3 | FY26 Q3 |
| LRC | Manitowoc North & South Breakwater Repair- Manitowoc Harbor- WI | Manitowoc- WI | $5M-$10M | TBD | TBD | TBD | TBD | FY25 Q4 | FY25 Q4 |
| LRC | Water Main Improvements- Cook County Sec 219- Cicero- IL | Cicero- IL | $1M-$5M | TBD | TBD | TBD | TBD | FY25 Q3 | FY25 Q3 |
| LRC | Dredging- Indiana Harbor- IN | East Chicago- IN | $5M-$10M | TBD | TBD | TBD | TBD | FY25 Q3 | FY25 Q4 |
| LRC | Dam Removal- Horlick Dam- WI- Sec 506 | Racine- WI | $1M-$5M | TBD | TBD | TBD | TBD | FY25 Q4 | FY25 Q4 |
| LRC | North Breakwater Repair- Algoma Harbor- WI | Algoma- WI | $10M-$25M | TBD | TBD | TBD | TBD | FY25 Q3 | FY25 Q4 |
| LRC | CSSC Electric Dispersial Barrier- IL- Barrier ID Generator Replacement | Lockport- IL | $250K-$500K | TBD | TBD | TBD | TBD | FY25 Q3 | FY25 Q3 |
| LRC | CSSC Electric Dispersial Barrier- IL- Barrier I Camera Upgrades | Lockport- IL | $150K-$300K | TBD | TBD | TBD | TBD | FY25 Q3 | FY25 Q3 |
| LRC | Herbicide Facility Services- Multiple Locations | Chicago- IL / Lockport- IL | $25K-$100K | TBD | TBD | TBD | TBD | FY25 Q3 | FY25 Q3 |
| LRC | Chicago Harbor Lock & Dam- Platform Work Boat Procurement | Chicago- IL | $25K-$100K | TBD | TBD | TBD | TBD | FY25 Q3 | FY25 Q3 |
| LRC | T.J.O'Brien Lock and Dam- East/West Embankment Raising | Chicago- IL | $1M-$5M | TBD | TBD | TBD | TBD | FY25 Q4 | FY25 Q4 |
| LRC | Herbicide Facility Services- Multiple Locations | IL- IN- WI | TBD | TBD | TBD | TBD | TBD | FY25 Q3 | FY25 Q3 |
| LRC | Crane Contract- Multiple Locations | IL- IN- WI | $150K-$300K | TBD | TBD | TBD | TBD | FY25 Q3 | FY25 Q3 |
| LRC | General Jones Armory- AE Contract- Design Build | Chicago- IL | $10M-$25M | TBD | TBD | MATOC | TO | FY25 Q3 | FY26 Q1 |
| LRC | Kenosha Harbor Sediment Sampling | IL- IN- WI | $100K-$150K | TBD | TBD | TBD | TBD | FY25 Q3 | FY25 Q3 |
| LRC | Port Washington Sediment Sampling | IL- IN- WI | $100K-$150K | TBD | TBD | TBD | TBD | FY25 Q3 | FY25 Q3 |
| LRC | Michigan City Sediment Sampling | IL- IN- WI | $100K-$150K | TBD | TBD | TBD | TBD | FY25 Q3 | FY25 Q3 |
| LRC | CSSC Electric Dispersal Barrier- IL - Lewis Property Demolition | Lockport- IL | $500K - $1M | TBD | TBD | TBD | TBD | FY25 Q3 | FY25 Q3 |
| LRC | Lake George East Phase II Dredging | East Chicago- IN | $5M-$10M | TBD | TBD | TBD | TBD | FY26 Q1 | FY26 Q1 |
| LRC | Lake George West Sampling - Sediment Sampling | Hammond- IN | $100K-$250K | TBD | TBD | TBD | TBD | FY25 Q3 | FY25 Q4 |
| LRC | Sheboygan Harbor Sediment Sampling | Sheboyan Harbor- WI | $100K-$250K | TBD | TBD | TBD | TBD | FY25 Q3 | FY25 Q3 |
| LRC | Strugeon Bay Dredging | Sturgeon Bay- WI | $1M-$5M | TBD | TBD | TBD | TBD | FY26 Q2 | FY26 Q3 |
| LRC | Section 219- Calumet Region - Chesterton- Sanitary Sewer Project | Chesterton- IN | $1M-$5M | TBD | TBD | TBD | TBD | FY25 Q4 | FY25 Q4 |
| LRC | Section 219- Calumet Airport- Gary Airport- Infrastructure Improvements | Gary- IN | $1M-$5M | TBD | TBD | TBD | TBD | FY25 Q4 | FY25 Q4 |
| LRC | Section 219- Cook County- Niles- Stormwater Pipeline
Project | Niles- IL | $1M-$5M | TBD | TBD | TBD | TBD | FY25 Q4 | FY25 Q4 |
| LRC | Section 219- Cook County- Park Forest- Water Main Project | Park Forest- IL | $1M-$5M | TBD | TBD | TBD | TBD | FY25 Q3 | FY25 Q4 |
| LRC | Section 219- Cook County- Flossmoor- Stormwater Pipeline Project | Flossmoor- IL | $1M-$5M | TBD | TBD | TBD | TBD | FY25 Q3 | FY25 Q4 |
| LRC | Section 219- Cook County- La Grange- Sanitary Sewer Project | La Grange- IL | $1M-$5M | TBD | TBD | TBD | TBD | FY25 Q4 | FY25 Q4 |
| LRC | Section 219- Cook County- Steger- Stormwater Pipeline Project | Steger- IL | $1M-$5M | TBD | TBD | TBD | TBD | FY25 Q4 | FY25 Q4 |
| LRC | Section 219- Cook County- Glenview- Infrastructure Improvements Projects | Glenview- IL | $1M-$5M | TBD | TBD | TBD | TBD | FY25 Q3 | FY25 Q3 |
| LRC | CAP 206- Dutch Gap AER- Aquatic Ecosystem Restoration | Antioch- IL | $10M-$15M | TBD | TBD | TBD | TBD | FY25 Q3 | FY25 Q4 |
| LRC | Upper Des Plaines River and Tributaries Phase AER- Aquatic Ecosystem Restoration- Pollack Lake and Hastings Creek (Raven Glen) | Antioch- IL | $10M-$25M | TBD | TBD | TBD | TBD | FY25 Q4 | FY25 Q4 |
| LRC | Green Bay Harbor Dredging | Green Bay- WI | $1M-$5M | TBD | TBD | TBD | TBD | FY25 Q3 | FY25 Q3 |
| LRC | LGB-FR AOC - Spawning and Habitat Reefs - Aquatic Ecosystem Restoration | Green Bay- WI | $5M-$10M | TBD | TBD | TBD | TBD | FY25 Q4 | FY25 Q4 |
| LRC | LGB-FR AOC - Longtail Point Habitat Restoration- Aquatic Ecosystem Restoration | Green Bay- WI | $15M-$20M | TBD | TBD | TBD | TBD | FY26 Q4 | FY26 Q4 |
| LRC | LGB-FR AOC - De Pere Dam Riverine Wetland Restoration- Aquatic Ecosystem Restoration | De Pere- WI | $20M-$25M | TBD | TBD | TBD | TBD | FY26 Q4 | FY26 Q4 |
| LRC | Kaukauna Dry Dock #3- Soil Excavation | Kaukauna- WI | $1M-$5M | TBD | TBD | TBD | TBD | FY26 Q1 | FY26 Q1 |
| LRC | Kaukauna Parcel J - Soil Excavation | Kaukauna- WI | $1M-$5M | TBD | TBD | TBD | TBD | FY25 Q4 | FY26 Q1 |
| LRC | Kewaunee Dredging | Kewaunee- WI | $1M-$5M | TBD | TBD | TBD | TBD | FY26 Q2 | FY26 Q3 |
| LRC | Upper Appleton Wall Repair | Appleton- WI | $5M-$10M | TBD | TBD | TBD | TBD | FY25 Q3 | FY25 Q4 |
| LRC | Kewaunee Breakwater Repair- Section C | Kewaunee- WI | $1M-$5M | TBD | TBD | TBD | TBD | FY26 Q2 | FY26 Q2 |
| LRC | Kaukauna Dam - Right Abutment Repair | Kaukauna- WI | $1M-$5M | TBD | TBD | TBD | TBD | FY25 Q4 | FY25 Q4 |
| LRC | CSSC Electric Dispersal Barrier- IL - Barrier As Builts | Lockport- IL | $250K-$500K | TBD | TBD | TBD | TBD | FY25 Q4 | FY25 Q4 |
| LRC | CSSC Electric Dispersal Barrier- IL - CSSC Barrier IIB Power Supply | Lockport- IL | $500K-$1M | TBD | TBD | TBD | TBD | FY25 Q3 | FY25 Q4 |
| LRC | Chicago Harbor Backup Power Generator | Chicago- IL | $250K-$500K | TBD | TBD | TBD | TBD | FY25 Q3 | FY25 Q4 |
| LRE | Grand Haven North Pier Wave Attenuator: demolish a section of the harbor's north pier to allow for the construction of a rubble mound wave attenuator. | Grand Haven (Michigan) | $5M to $10M | 237990 | Small Business Set Aside | NA | IFB | FY25 Q4 | FY25 Q4/FY26 Q1 |
| LRE | SOO Duct Bank and Generator: Standby Generator System – construction of new natural gas fueled back-up generator system with removal of existing back-up generators and associated diesel fuel storage and distribution system. | Sault Ste. Marie (Michigan) | $10M to $25M | 236220 | Unrestricted | NA | RFP | FY25 Q4 | FY26 Q1 |
| LRE | Sebewaing River South Levee Repairs | Sebewaing (Michigan) | $10M to $25M | 237990 | Small Business Set Aside | N/A | IFB | FY25 Q4/FY26Q1 | FY26 Q1 |
| LRE | Lansing 219 Sewer Separation: provide infrastructure work to eliminate combined sewer overflows via construction of a new- dedicated sanitary sewer and rehabilitation of existing combined sewer into a dedicated storm sewer. | Lansing (Michigan) | $5M to $10M | 237110 | Full and Open | N/A | IFB | FY25 Q4/FY26Q1 | FY26 Q1 |
| LRE | Great Lakes Dredging MATOC: Establishing a new Maintenance Dredging Multiple Award Task Order Contract (MATOC) | within LRE | | 237990 | Small Business Set Aside | N/A | RFP | FY25 Q4 | FY26 Q1/Q2 |
| LRE | Monroe Harbor Advanced Maintenance Dredging | Monroe (Michigan) | $1M and $5M | 237990 | Small Business Set Aside | N/A | IFB | FY26 Q1/Q2 | FY26 Q1/Q2 |
| LRE | Lexington Breakwater Repair | Lexington (Michigan) | $5M to $10M | 237990 | TBD | N/A | IFB | FY26 Q1 | FY26 Q2 |
| LRE | Soo Crib Dam Stabilization: Construction to stabilize the Soo Crib Dam. Anticipated design to include a hybrid SSP wall along the length of the crib dam (to be constructed mainly from water- support from land) and mix of reconstruction/grouting at the east and west tie-ins (with coffer dam(s) at the tie-in areas). | Sault Ste Marie (Michigan) | $10M to $25M | 237990 | TBD | N/A | BVTO | FY26 Q2/Q3 | FY26 Q3 |
| LRE | Holland Inner Maintenance Dredging | Holland (Michigan) | $1M to $5M | 237990 | Small Business Set Aside | N/A | IFB | FY25 Q4 | FY25 Q4/FY26 Q1 |
| LRE | St. Joseph Inner Harbor Maintenance Dredging | St Joseph- Michigan | $1M to $5M | 237990 | Small Business Set Aside | N/A | IFB | FY26 Q1/Q2 | FY26 Q1/Q2 |
| LRE | St. Mary's River Sea Lamprey trap: Construction of a sea lamprey trap structure downstream of Gate 16 of the St. Marys River Compensating Works in Chippewa County- MI. | Sault Ste. Marie (Michigan) | $1M and $5M | 237990 | TBD | TBD | TBD | FY26 Q2/Q3 | FY26 Q2/Q3 |
| LRE | Sault Facility Lighting Modernization: Removal of existing light fixtures- poles- and associated cabling in Upper Canal Park. Installation of new poles with LED lamps and install new cabling in conduit. Modify layout and increase fixtures for better lighting | Sault Ste. Marie (Michigan) | $1M and $5M | TBD | TBD | TBD | TBD | FY26 Q2/Q3 | FY26 Q2/Q3 |
| LRE | Charlevoix Harbor Maintenance Dredging | Charlevoix MI | $1M to $5M | 237990 | Small Business Set Aside | N/A | IFB | FY26 Q2 | FY26 Q2 |
| LRE | St. Joseph Outer and Holland Outer Harbor Maintenance Dredging | St Joseph and Holland MI | $1M to $5M | 237990 | Small Business Set Aside | N/A | IFB | FY26 Q1 | FY26 Q2 |
| LRE | Alpena Harbor Maintenance Dredging | Alpena- MI | $1M to $5M | 237990 | Small Business Set Aside | N/A | IFB | FY26 Q1 | FY26 Q2 |
| LRE | GWK Sewer Inspection and Cleaning: George W Kuhn (GWK) Drain System to provide sewer cleaning and inspection services for 110-000 lineal feet of the GWK Drain System-
ranging from 8 to 180 inch diameter pipe within Oakland County Michigan | Oakland County Michigan | $200-000 to $500-000 | 562998 | Small Business Set Aside | N/A | RFQ | FY26 Q1 | FY26 Q2 |
| LRE | Cornucopia Harbor Maintenance Dredging | Michigan | $1M to $5M | 237990 | Small Business Set Aside | N/A | IFB | FY26 Q1 | FY26 Q1 |
| LRE | Grand Haven Outer Maintenance Dredging | Grand Haven (Michigan) | $1M to $5M | 237990 | Small Business Set Aside | N/A | IFB | FY26 Q1 | FY26 Q2 |
| LRE | Lawn Maintenance Sault Ste Maire Project Office | Sault Ste. Marie (Michigan) | TBD | TBD | TBD | TBD | TBD | TBD | TBD |
| LRE | New Security Guard Contract for the Sault Ste Marie Project Office: The USACE Detroit District requires Contractor security services to protect Government- civilian and Contractor personnel- facilities- and equipment within the SPO area of responsibility by the provision of contract security guards | Sault Ste. Marie (Michigan) | TBD | 561612 | Full and Open | TBD | RFP | FY26 Q1 | FY26 Q1 |
| LRE | Clinton River Confined Disposal Facility (CDF) Tree Cutting: . The Clinton River CDF features significant overgrowth of large trees- brush- and other vegetation. Maintenance must be conducted at the site to keep
the CDF functional. Work is expected to include tree cutting- topping- and vegetation removal | Harrison Township- MI | $25-000 to $100-000 | 561730 | Small Business Set Aside | N/A | RFQ | FY25 Q4 | FY26 Q1 |
| LRE | Fire Alarm/Extinguishers Service- The U.S. Army Corps of Engineers
(USACE) is seeking to establish a contract with the purpose of procuring services involving the
fire alarm notification and fire suppression equipment and systems at USACE Detroit District’s
Soo Project Office (SPO). | Sault Ste. Marie (Michigan) | TBD | 541990 | Small Business Set Aside | N/A | RFQ | FY25 Q4 | FY26 Q1 |
| LRE | Machine Shop Summit Boring Mill Service BPA Call | Sault Ste. Marie (Michigan) | Less than $25-000 | 811310 | Full and Open | BPA Call | RFP | FY25 Q4 | FY26 Q1 |
| LRE | Boiler and Pressure Valve Inspection: The SPO is looking for a contractor who can perform boiler and pressure vessel inspections for the facility. The work would include inspections- inspection reports- and certifications of the equipment. | Sault Ste. Marie (Michigan) | Between $25-000 and $100-000 | TBD | TBD | TBD | TBD | TBD | TBD |
| LRE | Crooked River Lock Water Supply System Installation: The contractor shall provide services for the decommission of the existing well and installation of a new well. The new well shall include pump- pipe- and stubout of well casing for future connection. Electrical service from existing well shall be utilized for the new well. The well shall meet the Private Water System classification per the Environment- Great Lakes- and Energy (EGLE) State of Michigan Water Well Manual. | Michigan | $25-000 to $100-000 | 221310 | Full and Open | N/A | RFP | FY25 Q4 | FY26 Q1 |
| LRE | Ludington & Pentwater Maintenance Dredging | Michigan | $1M to $5M | 237990 | Small Business Set Aside | n/a | IFB | FY26 Q1/Q2 | FY26 Q2 |
| LRE | Manistique River Sea Lamprey Barrier AE Design | Michigan | $1M and $5M | 541330 | Unrestricted | LRD (Regional) AE Large Business MATOC | RFP | FY25 Q4 | FY26 Q1 |
| LRE | Upper Saginaw DMDF Groundwater Monitoring | Michigan | $25-000 to $100-000 | 541380 | Small Business Set Aside | Task Order off of LRE Environmental Services MATOC | RFP | FY25 Q4 | FY25 Q4 |
| LRE | South Haven & New Buffalo Maintenance Dredging | Michigan | $1M to $5M | 237990 | Small Business Set Aside | N/A | IFB | FY26 Q1/Q2 | FY26 Q1/Q2 |
| LRL | Preservation of The Force & Family (POTFF) | Davis Monthan Air Force Base (Arizona) | Between $5M - $10M | 236220 | Small Business Set Aside | N/A | AE Design Bid Build | FY25 Q4 | FY25 Q4 |
| LRL | Add Repair Component Medical Training Facility B3120 | Eglin AFB (Florida) | Between $1M and $5M | 236220 | Small Business Set Aside | SE MATOC | AE Design Bid Build | FY25 Q3 | FY25 Q4 |
| LRL | KC-46 Two-Bay Maintenance/Fuel Cell Hangar and Add/Alt Bldg 1244 FUT/Cargo Pallet Staging / Repair Ramp Mooring Points | March Air Force Base (California) | Between $100M and $250M | 236220 | Unrestricted | N/A | AE Design Bid Build | FY24 Q4 | FY25 Q4 |
| LRL | KC-46A Alter Bldg 2245 Squad Ops | March Air Force Base (California) | Between $1M and $5M | 236220 | WOSB Set-Aside | N/A | AE Design Bid Build | FY26 Q1 | FY26 Q1 |
| LRL | B2303 Repair Admin Area (Aero Repair)- Alter B2320 Hydraulics/Boom Shop- Alter B2327 Battery Shop | March Air Force Base (California) | Between $5M and $10M | 236220 | TBD | N/A | AE Design Bid Build | FY25 Q3 | FY25 Q4 |
| LRL | Add/Alt Bldg 600 for KC46 Flight Simulator | March Air Force Base (California) | Between $5M and $10M | 236220 | HubZone Set-Aside | N/A | AE Design Bid Build | FY25 Q3 | FY25 Q4 |
| LRL | Construct Addition and Renovation EOD Fac B750 | Minneapolis St. Paul JAP (Minnesota) | Between $1M and $5M | 236220 | TBD | N/A | AE Design Bid Build | FY25 Q3 | FY25 Q4 |
| LRL | Construct Addition and Renovate AGE FAC B820 | Minneapolis St. Paul JAP (Minnesota) | Between $1M and $5M | 236220 | Small Business Set-Aside | N/A | AE Design Bid Build | FY25 Q3 | FY25 Q4 |
| LRL | BOWST Addition B321 & Alter Flight Simulator | Niagara Falls ARS (New York) | Between $5M and $10M | 236220 | Small Business Set Aside | N/A | AE Design Bid Build | FY25 Q3 | FY25 Q4 |
| LRL | Combined Operations Facility | Niagara Falls ARS (New York) | Between $25M and $100M | 236220 | Unrestricted | NA | AE Design Bid Build | FY26 Q1 | FY26 Q3 |
| LRL | Taxiway Golf Extension | Westover Air Force Base (Massachusetts) | Between $25M and $100M | 236220 | Unrestricted | N/A | AE Design Bid Build | FY27 | FY27 |
| LRL | Aeromedical Evacuation Facility | Joint Base Charleston (South Carolina) | Between $10M and $25M | 236220 | TBD | N/A | In-House Design Build | FY26 Q1 | FY26 |
| LRL | Construct 512th Operations Group Complex | Dover Air Force Base (Delaware) | Between $25M and $100M | 236220 | TBD | N/A | AE Design Bid Build | FY26 Q3 | FY26 Q4 |
| LRL | Construct/Renovate for 414 FG & 307 FS- Bldg 4517 | Seymour Johnson AFB (North Carolina) | Between $1M and $5M | 236220 | TBD | N/A | AE Design Bid Build | FY25 Q3 | FY25 Q4 |
| LRL | Repair Aircraft Arresting Systems- Restripe Runway | Homestead AFB (Florida) | Between $5M and $10M | 236220 | TBD | N/A | AE Design Bid Build | FY25 Q3 | FY25 Q4 |
| LRL | Renovate Building 7087- Phase III and IV | Westover Air Force Base (Massachusetts) | Between $5M and $10M | 236220 | Small Business Set Aside | N/A | AE Design Bid Build | TBD- Currently on hold | TBD- Currently on hold |
| LRL | Base Fire Station | Youngstown (Ohio) | Between $10M and $25M | 236220 | Unrestricted | N/A | AE Design Bid Build | FY25 Q2 | FY25 Q3 |
| LRL | Repair Aircraft Arresting Systems- Restripe Runway | Homestead Air Force Base (Florida) | Between $5M and $10M | 236220 | TBD | N/A | AE Design Bid Build | FY25 Q3 | FY25 Q4 |
| LRL | Aeromedical Evacaution Facility | Joint Base Charleston (South Carolina) | Between $25M and $100M | 236220 | TBD | N/A | AE Design Bid Build | FY26 Q1 | FY26 Q1 |
| LRL | Aerospace Ground Equipment Maintenance Facility | Joint Base San Antonio (Lackland) Air Force Base (Texas) | Between $10M and $25M | 236220 | TBD | N/A | In House Design Bid Build | FY26 Q2 | FY26 Q2 |
| LRL | Renovate and Construct Addition to Comms Facility | Niagara Falls ARS (New York) | Between $1M and $5M | 236220 | Small Business Set-Aside | N/A | AE Design Bid Build | FY26 Q2 | FY26 Q3 |
| LRL | Army Reserve Center | Birmingham (Alabama) | Between $25M and $100M | 236220 | Unrestricted | N/A | AE Design Bid Build | FY25 Q3 | FY26 Q1 |
| LRL | Advanced Skills Training Barracks | Camp Parks (California) | Between $25M and $100M | 236220 | Small Business Set-Aside | N/A | AE Design Bid Build | FY25 Q2 | FY25 Q3 |
| LRL | Area Maintenance Support Activity / VMS | Defense Supply Center Richmond (Virginia) | Between $10M and $25M | 236220 | Unrestricted | N/A | AE Design Bid Build | FY25 Q2 | FY25 Q4 |
| LRL | Renovate/Repair Army Reserve Center and Area Maintenance Support Activity | Sacramento (California) | Between $10M and $25M | 236220 | Small Business Set Aside | N/A | Design Build | FY25 Q2 | FY25 Q4 |
| LRL | Maintenance and Repair Army Reserve (MRAR) Army Reserve Center Building 662 | Sacramento (California) | Between $10M and $25M | 236220 | Small Business Set Aside | N/A | Design Build | FY25 Q2 | FY25 Q4 |
| LRL | Collective Training Enlisted Barracks | Devens (Massachusetts) | Between $25M and $100M | 236220 | Unrestricted | N/A | In-House Design Bid Build | FY25 Q4 | FY26 Q3 |
| LRL | Army Reserve Center | Dobbins Air Force Base (Georgia) | Between $25M and $100M | 236220 | Unrestricted | N/A | In-House Design Bid Build | FY25 Q3 | FY25 Q4 |
| LRL | Advanced Skills Training Barracks | Fort Buchanan (Puerto Rico) | Between $25M and $100M | 236220 | Unrestricted | N/A | AE Design Bid Build | FY25 Q3 | FY25 Q4 |
| LRL | Multipurpose Athletic Field - Army Combat | Fort McCoy (Wisconsin) | Between $5M and $10M | 236220 | TBD | N/A | AE Design Bid Build | FY28 | FY28 |
| LRL | Area Maintenance Support Activity | Fort Sheridan (Illinois) | Between $25M and $100M | 236220 | TBD | N/A | In-House Design Bid Build | FY31 | FY31 |
| LRL | Vehicle Maintenance Shop | Manitowoc (Wisconsin) | Between $10M and $25M | 236220 | TBD | N/A | AE Design Bid Build | FY26 Q4 | FY27 Q1 |
| LRL | Area Maintenance Support Activity | New Castle (Pennsylvania) | Between $10M and $25M | 236220 | Unrestricted | N/A | AE Design Bid Build | FY25 Q4 | FY26 Q1 |
| LRL | Area Maintenance Support Activity Equipment | Wilkes Barre (Pennsylvania) | Between $10 and $25M | 236220 | Unrestricted | N/A | AE Design Bid Build | FY24 Q4 | FY25 Q4 |
| LRL | Area Maintenance Support Activity | Patton USARC (California) | Between $25M and $100M | 236220 | TBD | N/A | AE Design Bid Build | FY29 | FY29 |
| LRL | Aviation Support Facility Hanger | Fort Knox (Kentucky) | Between $100M and $250M | 236220 | Unrestricted | N/A | AE Design Bid Build | FY26 Q2 | FY26 Q4 |
| LRL | Area Maintenance Support Activity | Joint Base Elmendorf-Richardson (Alaska) | Between $10M and $25M | 236220 | TBD | N/A | In-House Design Bid Build | FY31 | FY31 |
| LRL | Collective Training Enlisted Barracks | Camp Parks (California) | Between $25M and $100M | 236220 | TBD | N/A | AE Design Build | FY27 | FY27 |
| LRL | Advanced Skills Training Barracks | Camp Parks (California) | Between $25M and $100M | 236220 | TBD | N/A | AE Design Build | FY28 | FY28 |
| LRL | Vehicle Maintenance Shop | Tonganoixie (Kansas) | Between $10M and $25M | 236220 | TBD | N/A | AE Design Build | FY28 | FY28 |
| LRL | Airborne Equipment Parachute Repair Shop | Patton USARC (California) | Between $10M and $25M | 236220 | TBD | N/A | AE Design Bid Build | FY28 | FY28 |
| LRL | Modernization of General Instruction Building | Fort Huachuca (Arizona) | Between $5M and $10M | 236220 | TBD | N/A | TBD | FY25 Q3 | FY25 Q4 |
| LRL | Organizational Storage Building | New Century (Kansas) | Between $5M and $10M | 236220 | TBD | N/A | AE Design Bid Build | FY26 Q4 | FY26 Q4 |
| LRL | Metro Louisville Pump Stations- Walls & Assoc. Features | Metro Louisville (Kentucky) | Between $25M and $100M | 236220 | TBD | TBD | TBD | TBD | TBD |
| LRL | Johnson County Flood Warning & Emergency Evacuation Plan | Paintsville (Kentucky) | Between $5M and $10M | 236220 | TBD | TBD | TBD | TBD | TBD |
| LRL | Johnson County Levees & Floodwalls | Paintsville (Kentucky) | Between $25M and $100M | 236220 | TBD | TBD | TBD | TBD | TBD |
| LRL | Dam Outlet works & Cutoff Wall Phase 2 | Rough River Dam (Kentucky) | Between $250M and $500M | 237990 | Unrestricted | TBD | Design Bid Build | FY25 Q1 | FY26 Q2 |
| LRL | Demolition of 2 Buildings | (DSCC) Columbus (Ohio) | Between $1M and $5M | 236220 | TBD | N/A | AE Design Build | FY25 Q4 | FY26 |
| LRL | Replacing Switch Gears for DFAS | (DSCC) Columbus (Ohio) | Between $1M and $5M | 236220 | TBD | N/A | AE Design Build | FY25 Q2 | FY25 Q3 |
| LRL | Carpet Replacement Building 21 | (DSCC) Columbus (Ohio) | Between $1M and $5M | 236220 | TBD | N/A | AE Design Build | FY25 Q2 | FY25 Q3 |
| LRL | B3659 Composites Engr Innovation Ctr | Crane (Indiana) | Between $5M and $10M | 236220 | Small Business Set Aside | N/A | In House Design Build | FY26 Q3 | FY26 Q4 |
| LRL | Building 143 Renovate Bays 1 & 3 | Crane (Indiana) | Between $1M and $5M | 236220 | TBD | N/A | AE Design Bid Build | FY26 Q4 | FY27 Q1 |
| LRL | B3748 Trusted Microelectronic Assurance Center | Crane (Indiana) | Between $5M and $10M | 236220 | TBD | N/A | AE Design Bid Build | FY26 Q2 | FY26 Q4 |
| LRL | Pyrotechnic Production Facility | Crane (Indiana) | Between $25M and $100M | 236220 | TBD | N/A | AE Design Bid Build | FY26 Q1 | FY26 Q4 |
| LRL | Virtualized Electro Warfare & Mission Eng. Center | Crane (Indiana) | Between $5M and $10M | 236220 | TBD | N/A | AE Design Bid Build | FY26 Q2 | FY26 Q4 |
| LRL | Shipboard/Ground Systems Lab | Crane (Indiana) | Between $25M and $100M | 236220 | TBD | N/A | AE Design Bid Build | FY27 Q2 | FY27 Q4 |
| LRL | B-198 HVAC- Chillers- and MAU | Crane (Indiana) | Between $1M and $5M | 236220 | TBD | N/A | AE Design Bid Build | FY25 Q3 | FY26 Q1 |
| LRL | Unmanned Fusion Warfare Laboratory | Crane (Indiana) | Between $5M and $10M | 236220 | TBD | N/A | AE Design Bid Build | FY26 Q3 | FY27 Q2 |
| LRL | DTA PEO Bldg. 231 1st Floor Renovation | Detroit Arsenal (Michigan) | Between $10M and $25M | 236220 | TBD | N/A | AE Design Bid Build | FY25 Q3 | FY25 Q4 |
| LRL | Manned/Unmanned Tactical Vehicle Lab | Detroit Arsenal (Michigan) | Between $25M and $100M | 236220 | Unrestricted | N/A | AE Design Bid Build | FY25 Q1 | FY25 Q3 |
| LRL | Mulitpurpose Training Range | Fort Campbell (Kentucky) | Between $25M and $100M | 236220 | Unrestricted | N/A | AE Design Bid Build | FY25 Q1 | FY25 Q2 |
| LRL | Automated Record Fire Range | Fort Campbell (Kentucky) | Between $10M and $25M | 236220 | TBD | N/A | In House Design Bid Build | FY25 Q4 | FY26 |
| LRL | Rectifier Replacement | Fort Campbell (Kentucky) | Between $5M and $10M | 236220 | TBD | MATOC | AE Design Build | FY25 Q3 | FY25 Q4 |
| LRL | Consolidated Housing Furniture Storage | Fort Campbell (Kentucky) | Between $1M and $5M | 236220 | Unrestricted | N/A | Design Build | FY25 Q1 | FY25 Q2 |
| LRL | Renovate Building 7214 Hangar | Fort Campbell (Kentucky) | Between $10M and $25M | 236220 | TBD | N/A | AE Design Bid Build | FY25 Q1 | FY25 Q3 |
| LRL | Ambulatory Care Center | Fort Campbell (Kentucky) | Between $25M and $100M | 236220 | TBD | N/A | AE Design Bid Build | TBD | TBD |
| LRL | Air Traffic Control Tower | Fort Campbell (Kentucky) | Between $25M and $100M | 236220 | TBD | N/A | AE Design Build | FY27 Q1 | FY27 Q2 |
| LRL | Barracks | Fort Campbell (Kentucky) | Between $25M and $100M | 236220 | Unrestricted | N/A | In House Design Build | FY26 Q1 | FY26 Q4 |
| LRL | Renovate Building 3069 Child Development Center | Fort Campbell (Kentucky) | Between $10M and $25M | 236220 | TBD | N/A | AE Design Build | FY26 Q1 | FY26 Q2 |
| LRL | Fire Station | Fort Campbell (Kentucky) | Between $5M and $10M | 236220 | TBD | N/A | AE Design Build | FY26 Q2 | FY26 Q3 |
| LRL | Scott Middle School | Fort Knox (Kentucky) | Between $25M and $100M | 236220 | TBD | N/A | AE Design Bid Build | FY26 Q1 | FY26 Q2 |
| LRL | Fire Station | Fort Knox (Kentucky) | Between $5M and $10M | 236220 | TBD | N/A | AE Design Build | FY26 Q3 | FY26 Q4 |
| LRL | IIS Lex- KY Forage Animal Production Research Unit | Lexington (Kentucky) | Between $25M and $100M | 236220 | Unrestricted | N/A | AE Design Bid Build | TBD FY26 | TBD |
| LRL | Cyber Repair Maintenance | Mansfield (Illinois) | Between $25M and $100M | 236220 | TBD | N/A | AE Design Bid Build | FY25 Q2 | FY25 Q4 |
| LRL | Construct Small Arms Range | Rickenbacker (Ohio) | Between $5M and $10M | 236220 | Small Business Set Aside | N/A | AE Design Bid Build | FY25 Q3 | FY25 Q4 |
| LRL | Child Development Center | Rock Island Arsenal (Illinois) | Between $25M and $100M | 236220 | TBD | N/A | AE Design Build | FY34 | FY34 |
| LRL | Emergency Exit Stairs Towers Bldg 390 | Rock Island Arsenal (Illinois) | Between $5M and $10M | 236220 | Small Business Set Aside | N/A | AE Design Bid Build | FY26 Q4 | FY26 Q4 |
| LRL | Repair Fire Suppression Systems (Multiple facilities) | Rock Island Arsenal (Illinois) | Between $5M and $10M | 236220 | TBD | NA | AE Design Bid Build | FY25 Q2 | FY25 Q4 |
| LRL | Substation A Modernization | Rock Island Arsenal (Illinois) | Between $5M and $10M | 236220 | Unrestricted | N/A | AE Design Bid Build | FY26 Q2 | FY26 Q4 |
| LRL | Transmission Line Modernization | Rock Island Arsenal (Illinois) | Between $25M and $100M | 236220 | TBD | NA | AE Design Bid Build | FY26 Q2 | FY26 Q4 |
| LRL | WPAFB 3rd Air Stream at Research Cell B18 Complex | Wright Patterson Air Force Base (Ohio) | Between $5M and $10M | 236220 | TBD | N/A | AE Design Bid Build | FY25 Q3 | TBD |
| LRL | HPW HVAC Renovations | Wright Patterson Air Force Base (Ohio) | Between $5M and $10M | 236220 | TBD | N/A | AE Design Bid Build | FY25 Q3 | FY25 Q4 |
| LRL | NAMRU-D Construct Lab Support Bldg - B900 | Wright Patterson Air Force Base (Ohio) | Between $5M and $10M | 236220 | Unrestricted | N/A | AE Design Bid Build | FY25 Q3 | FY25 Q4 |
| LRL | Human Performance Lab | Wright Patterson Air Force Base (Ohio) | Between $25M and $100M | 236220 | TBD | N/A | AE Design Bid Build | FY26 Q3 | FY26 Q4 |
| LRL | Acquisition Management Complex- V | Wright Patterson Air Force Base (Ohio) | Between $100M and $250M | 236220 | TBD | N/A | AE Design Bid Build | FY26 Q3 | FY26 Q4 |
| LRL | 10 MW Dual Fuel Generator/Microgrid | Aberdeen Proving Ground (Maryland) | Between $25M and $100M | 237130 | Sole Source to Utility Provider | N/A | AE Design Build | FY25 Q4 | FY25 Q4 |
| LRL | Build Microgrid with Spinning Generation A | Anniston Army Depot (Alabama) | Between $25M and $100M | 237130 | SDVOSB | N/A | AE Design Bid Build | FY25 Q1 | FY25 Q4 |
| LRL | Power Generation and Microgrid | Belgium | Between $25M and $100M | 237130 | Unrestricted | N/A | AE Design Bid Build | FY26 Q1 | FY26 Q4 |
| LRL | Electric Power- Photovoltaic | Camp Roberts (California) | Between $25M and $100M | 237130 | TBD | N/A | AE Design Bid Build | FY27 Q1 | FY27 Q1 |
| LRL | Conroe RC Install Microgrid / PV / BESS & Generator | Conroe (Texas) | Between $10M and $25M | 237130 | Unrestricted | N/A | AE Design Bid Build | FY25 Q2 | FY25 Q4 |
| LRL | Zone 1 Pad17 Hybrid Microgrid | Camp Buehring (Kuwait) | Between $10M and $25M | 237130 | TBD | N/A | AE Design Bid Build | FY25 Q3 | FY25 Q4 |
| LRL | Microgrid System - Mobility (Railhead) Area | Fort Bliss (Texas) | Between $5M and $10M | 237130 | TBD | N/A | AE Design Bid Build | FY27 Q1 | FY27 Q1 |
| LRL | DPTMS Simulation Training Campus Microgrid | Fort Bliss (Texas) | Between $5M and $10M | 237130 | TBD | N/A | AE Design Bid Build | FY26 Q1 | FY26 Q1 |
| LRL | Microgrid - McGregor / Westbrook | Fort Bliss (Texas) | Between $10M and $25M | 237130 | TBD | N/A | AE Design Bid Build | FY28 Q1 | FY28 Q1 |
| LRL | 5 MW NG Generator Microgrid - East | Fort Bliss (Texas) | Between $10M and $25M | 237130 | TBD | N/A | AE Design Bid Build | FY28 Q1 | FY28 Q1 |
| LRL | Installation Level Microgrid | Fort Buchanan (Puerto Rico) | Between $25M and $100M | 237130 | Small Business Set-Aside | N/A | AE Design Bid Build | FY25 Q3 | FY25 Q4 |
| LRL | Water Treatment System at Las Casa Lake | Fort Buchanan (Puerto Rico) | Between $10M and $25M | 237110 | TBD | N/A | AE Design Bid Build | FY26 Q1 | FY26 Q2 |
| LRL | Microgrid and Backup Power | Fort Hood (Texas) | Between $10M and $25M | 237130 | Sole Source to Utility Provider | N/A | AE Design Bid Build | FY25 Q3 | FY25 Q4 |
| LRL | Power Generation and Microgrid | Fort Hood (Texas) | Between $25M and $100M | 237130 | Sole Source to Utility Provider | N/A | AE Design Bid Build | FY25 Q3 | FY25 Q4 |
| LRL | Water Supply Treatment Building - Potable | Fort Liberty (formerly Ft. Bragg) (North Carolina) | Between $10M and $25M | 237110 | Sole Source to Utility Provider | N/A | In House Design Build | FY25 | TBD |
| LRL | Electric Power - Gas Fired | Fort Riley (Kansas) | Between $25M and $100M | 237130 | Sole Source to Utility Provider | N/A | AE Design Bid Build | FY25 | FY25 |
| LRL | Construct 10MW Microgrid Utilizing Existin | Fort Liberty (formerly Ft. Bragg) (North Carolina) | Between $25M and $100M | 237130 | Sole Source to Utility Provider | N/A | AE Design Bid Build | FY25 Q3 | FY25 Q4 |
| LRL | Emergency Diesel Microgrid | Fort Liberty (formerly Ft. Bragg) (North Carolina) | Between $5M and $10M | 237130 | Sole Source to Utility Provider | N/A | AE Design Bid Build | FY25 | FY25 |
| LRL | Electric Power - Gas Fired | Fort Stewart (Georgia) | Between $25M and $100M | 237130 | Sole Source to Utility Provider | N/A | AE Design Bid Build | FY25 Q3 | FY25 Q4 |
| LRL | Water Distribution Lines- Potable | Hawthorne (Nevada) | Between $5M and $10M | 237130 | TBD | N/A | AE Design Bid Build | FY25 Q3 | FY25 Q4 |
| LRL | Microgrid and Backup Power | Joint Base Lewis-McChord (Washington) | Between $25M and $100M | 237130 | Potential Sole Source to Utility Provider | N/A | AE Design Bid Build | FY25 Q3 | FY25 Q4 |
| LRL | Build 2.5 MW Microgrid for Gray Army Airfield | Joint Base Lewis-McChord (Washington) | Between $25M and $100M | 237130 | Potential Sole Source to Utility Provider | N/A | AE Design Bid Build | FY25 Q2 | FY25 Q4 |
| LRL | AAP 15 MW NG CHP Microgrid | Lake City Army Ammo Plant (Missouri) | Between $25M and $100M | 237130 | TBD | N/A | In House Design Build | FY25 Q2 | FY25 Q3 |
| LRL | Electric Power- Photovoltaic | Parks RFTA (California) | Between $25M and $100M | 237130 | TBD | N/A | AE Design Bid Build | TBD | TBD |
| LRL | Electric Power- Photovoltaic | Redstone Arsenal (Alabama) | Between $25M and $100M | 237130 | TBD | N/A | AE Design Bid Build | FY25 Q2 | FY25 Q4 |
| LRL | Build 15 MW Microgrid with 10 MW New NG RI | Rock Island Arsenal (Illinois) | Between $25M and $100M | 237130 | TBD | N/A | AE Design Bid Build | FY25 Q3 | FY25 Q4 |
| LRL | Main Potable Water Lines for Resilience | Tooele Army Depot (Utah) | Between $10M and $25M | 237110 | TBD | N/A | AE Design Bid Build | FY25 Q3 | FY25 Q4 |
| LRL | Electric Power - Photovoltaic | White Sands Missile Range (New Mexico) | Between $10M and $25M | 237130 | Unrestricted | N/A | AE Design Bid Build | FY26 Q2 | FY26 Q4 |
| LRL | Solar Panels Installation | Camp Carroll (Korea) | Between $10M and $25M | 237130 | TBD | N/A | AE Design Bid Build | TBD | TBD |
| LRL | Build 2.5 MW Microgrid for Gray Army Airfield | Joint Base Lewis-McChord (Washington) | Between $25M and $100M | 237130 | Potential Sole Source to Utility Provider | N/A | AE Design Bid Build | FY25 | FY25 |
| LRL | ARTC Microgrid 14 Generator Consol 700kW Solar | Cp Buehring (Kuwait) | Between $25M and $100M | 237130 | Unrestricted | N/A | AE Design Bid Build | FY25 Q3 | FY25 Q4 |
| LRL | ERCIP WPAFB District Cooling Plant | Wright Patterson Air Force Base (Ohio) | Between $25M and $100M | 237130 | TBD | N/A | AE Design Bid Build | FY25 Q4 | FY25 Q4 |
| LRL | Electric Power Gas Fired Microgrid | Fort Sill (Oklahoma) | Between $100M and $250M | 237130 | TBD | N/A | AE Design Bid Build | FY25 Q4 | FY25 Q4 |
| LRL | Install Microgrid- PV- Battery Energy Storage | Katterbach (Germany) | Between $25M and $100M | 237130 | TBD | N/A | A/E Design Bid Build | FY27 Q1 | FY27 Q1 |
| LRL | Stilling Basin Repair & Dewatering | Caesar Creek Lake (Ohio) | Between $500K and $1M | 237990 | Small Business | MATOC Task Order | RFP | FY25 Q3 | FY25 Q4 |
| LRL | Repair Emergency and Service Gate Lips and Seals | Caesar Creek Lake (Ohio) | Between $500K and $1M | 237990 | TBD | TBD | TBD | FY25 Q4 | FY25 Q4 |
| LRL | Tower Bridge Painting & Bridge Deck Replacement | Cagles Mill Lake (Indiana) | Between $500K and $1M | 237990 | TBD | MATOC Task Order | RFP | FY25 Q3 | FY25 Q4 |
| LRL | Culvert Valve | Cannelton Lock & Dam (Indiana) | Between $5M and $10M | 237990 | TBD | TBD | TBD | FY26 Q1 | FY26 Q1 |
| LRL | Repair and Replace Lock Controls | Cannelton Lock & Dam (Indiana) | Between $500K and $1M | 237990 | TBD | TBD | TBD | FY25 Q4 | FY26 |
| LRL | Tainter Gate Cable Connection Replacement | JT Myer Lock & Dam (Indiana) | Between $1M and $5M | 237990 | TBD | TBD | TBD | FY25 Q4 | FY25 Q4 |
| LRL | Tainter Fate #1 Fabrication | McAlpine Lock & Dam (Kentucky) | Between $10M and $25M | 237990 | TBD | TBD | TBD | FY26 Q2 | FY26 Q3 |
| LRL | Replace Culvert Valves | McAlpine Lock & Dam (Kentucky) | Between $1M and $5M | 237990 | TBD | MATOC Task Order | RFP | FY25 Q4 | FY26 |
| LRL | Remove and Repair Service Gates | Monroe Lake (Indiana) | Between $1M and $5M | 237990 | TBD | MATOC Task Order | RFP | FY25 Q4 | FY25 Q4 |
| LRL | Install Articulated Block | Patoka Lake (Indiana) | Between $500K and $1M | 237990 | TBD | TBD | TBD | FY25 | FY25 Q4 |
| LRL | Multilevel Intake and Hydraulic System Repairs | Patoka Lake (Indiana) | Between $500K and $1M | 237990 | TBD | TBD | TBD | FY25 Q3 | FY25 Q4 |
| LRL | R3F Lock Maintenance Bulkheads | Regional Rivers Repair Fleet | Between $10M and $25M | 237900 | TBD | TBD | TBD | FY25 Q4 | FY25 Q4 |
| LRL | Sewage Treatment Plant Replacement | Rough River Lake (Kentucky) | Between $1M and $5M | 237990 | Small Business | MATOC Task Order | RFP | FY25 Q3 | TBD |
| LRL | Training Wall Drain Gutter | West Fork Lake (Ohio) | Between $250K and $500K | 237990 | Small Business | MATOC Task Order | RFP | FY25 Q3 | FY25 Q4 |
| LRL | ERCIP MATOC | Nationwide | $2B Shared Capacity | 237130 | Unrestricted with Small Business Reserve | | | FY24 Q4 | FY26 Q1 |
| LRL | A/E Environmental MATOC | | $200M Shared Capacity | 541330 | Anticipate Unrestricted with SB Reserve | | | FY28 | FY28 |
| LRL | Military Construction MATOC | | $240M Shared Capacity | 236220 | Small Business Set Aside | | Design Build | FY25 Q3 | FY26 Q2 |
| LRL | Military Construction MATOC | | $200M Shared Capacity | 236220 | HubZone | | Design Build | FY25 Q3 | FY26 Q2 |
| LRL | Military Construction MATOC | | $160M Shared Capacity | 236220 | SDVOSB | | Design Bid Build | FY25 Q4 | FY26 Q2 |
| LRL | Construction MATOC to Support Operations Division | | $95M Shared Capacity | 236220 | HubZone | | Design Build | FY25 Q3 | FY25 Q4 |
| LRL | A/E Air Force Reserve MATOC | | $150M Shared Capacity | 541330 | Unrestricted with Small Business Reserve | | | FY25 Q4 | FY26 Q2 |
| LRL | Environmental Heavy Metals MATOC | | $245M Shared Capacity | 562910 | Unrestricted | | | FY25 Q1 | FY25 Q4 |
| LRL | Bureau of Prisons New Facility | Letcher County- KY | $150M (SATOC) | 541330 | Unrestricted | | | FY25 Q4 | FY26 Q1 |
| LRL | Risk Management Center Horizontal Design and Existing Condition Expert Reviews | Nationwide | $75M | 541330 | Unrestricted with a Small Business Reserve | | | FY25 Q3 | FY25 Q4 |
| LRN | Chickamauga Lock Approach Wall and Decommissioning | Chattanooga (Tennessee) | $250M-$500M | 237990 | Unrestricted | NA | RFP | Q2FY25 | Q2FY26 |
| LRN | Wolf Creek Bridge Crane Rehab | Jamestown (Kentucky) | $5M-$10M | 333923 | TBD | LRN Crane MATOC | Task Order | FY25 | FY25 |
| LRN | Cheatham Intake Crane Replacement | Ashland City (Tennessee) | $10M-$25M | 333923 | TBD | LRN Crane MATOC | Task Order | FY25 | FY25 |
| LRN | Cordell Hull Powerhouse Crane - Rehabilitate powerhouse crane | Carthage (Tennessee) | TBD | 333923 | TBD | LRN Crane MATOC | Task Order | FY26 | FY26 |
| LRN | Ft. Loudoun and Watts Bar- Lock Ladder Install - Lock ladder installlation to meet the USACE safety manual requirements (EM 35-1-20) as well as OSHA standards. | Lenoir City and Spring City (Tennessee) | $1M-$5M | TBD | TBD | TBD | TBD | FY26 | FY26 |
| LRN | Cordell Hull Phase II- Carthage- TN Streambank Stabilization - Stabilization of riverbank along Cumberland River at the Carthage WWTP | Carthage (Tennessee) | $1M-$5M | 237990 | Total Small Business Set Aside | Regional DBB Construction MATOC | Task Order | FY25 | FY25 |
| LRN | East Camp Creek Flood Risk Reduction - Construction of a detention structure to reduce flooding throughout downtown Gallatin area | Gallatin (Tennessee) | $1M-$5M | 237990 | Total Small Business Set Aside | LRN Stabilization MATOC | Task Order | FY25 | FY25 |
| LRN | Nickajack Two (2) new low speed gear boxes | Jasper (Tennessee) | over SAT | 333612 | Small Business Set Aside | NA | SAP | FY26 | FY26 |
| LRN | Brewster Road Repair - Roadway Stabilization | Big South Fork (Tennessee) | $500K-$1M | 237990 | Total Small Business Set Aside | LRN Stabilization MATOC | Task Order | FY25 | FY25 |
| LRN | Blount Ave: Mouse Creek/Cleveland - Channel Modification | Cleveland (Tennessee) | $250K-$500K | 237990 | Small Business Set Aside | NA | IFB | Q4FY25 | Q1FY26 |
| LRN | Williams St. Detention: Mouse Creek/Cleveland - Detention Structure | Cleveland (Tennessee) | $500K-$1M | 237990 | Small Business Set Aside | NA | IFB | Q4FY25 | Q2FY26 |
| LRN | Wolf Creek Turbine Generator Rehab - Rewind 4 units- replace 6 turbines with auto-venting | Jamestown (Kentucky) | $100M-$250M | 237990 | Unrestricted | NA | RFP | FY26 | FY27 |
| LRN | J. Percy Priest Exciter Replacement | Nashville (Tennessee) | $1M-$5M | 237130 | Unrestricted | LRN Excitation SATOC | Task Order | FY25 | FY26 |
| LRN | Lee County Sewer Improvements - Phase 1A | Jonesville (Virginia) | $25M-$100M | TBD | TBD | NA | RFP | TBD | TBD |
| LRN | J. Percy Priest DC Systems and Preferred AC Systems - Replace DC and Preferred ACSystems | Nashville (Tennessee) | $1M-$5M | TBD | TBD | NA | RFP | TBD | FY26 |
| LRN | Cheatham Excitation | Ashland City (Tennessee) | TBD | 237130 | Unrestricted | LRN Excitation SATOC | Task Order | TBD | FY26 |
| LRN | Wolf Creek Mill Springs Mill Restoration | Mills Springs (Kentucky) | over SAT | TBD | TBD | TBD | TBD | TBD | Q4FY25 |
| LRN | Dredging Post Oak and Looney | Post Oak Island and Looney Island (Tennessee) | $1M-$5M | TBD | TBD | LRH Regional Dredging MATOC | Task Order | TBD | FY25 |
| LRN | Regional Court Reporter BPA | Chatanooga (Tennessee) | under SAT | TBD | Small Business Set Aside | N/A | TBD | FY25 | FY25 |
| LRN | Barkley Geophysics | Grand Rivers (Kentucky) | under SAT | TBD | Small Business Set Aside | N/A | TBD | FY25 | FY25 |
| LRN | CT test sets for ESS | Tennessee | under SAT | TBD | Small Business Set Aside | N/A | TBD | FY25 | FY25 |
| LRN | 3-Phase Test Set- purchase for ESS | Tennessee | under SAT | TBD | Small Business Set Aside | N/A | TBD | FY25 | FY25 |
| LRN | SCADA Miscellaneous Parts | Nashville (Tennesee) | under SAT | TBD | Small Business Set Aside | N/A | TBD | FY25 | FY25 |
| LRN | Kentucky Lock Wall Armor Purchase | Grand Rivers (Kentucky) | under SAT | TBD | Small Business Set Aside | N/A | TBD | FY25 | FY25 |
| LRN | Ops- MST-Broaderson Crane Purchase | Tennessee | under SAT | TBD | Small Business Set Aside | N/A | TBD | FY25 | FY25 |
| LRN | Ops- MST - pump and piping purchase | Tennessee | under SAT | TBD | Small Business Set Aside | N/A | TBD | FY25 | FY25 |
| LRN | Wolf Creek- mower purchase (2) | Jamestown (Kentucky) | under SAT | TBD | Small Business Set Aside | N/A | TBD | FY25 | FY25 |
| LRN | Barkley Hydro- Generator Governor Rebuild Parts | Clarksville (Tennessee) | under SAT | TBD | Small Business Set Aside | N/A | TBD | FY25 | FY25 |
| LRN | Dale Hollow- Drain Line | Knoxville (Tennessee) | under SAT | TBD | Small Business Set Aside | N/A | TBD | FY25 | FY25 |
| LRN | Wheeler Lower Gate Fenders | Rogersville (Alabama) | under SAT | TBD | Small Business Set Aside | N/A | TBD | FY25 | FY25 |
| LRN | Wheeler Lock- New shop doors w/ incidental install | Rogersville (Alabama) | under SAT | TBD | Small Business Set Aside | N/A | TBD | FY25 | FY25 |
| LRN | Wilson Lock- New shop doors w/ incidental install | Florence (Alabama) | under SAT | TBD | Small Business Set Aside | N/A | TBD | FY25 | FY25 |
| LRN | Arc Flash Protective Gear | TBD | under SAT | TBD | Small Business Set Aside | N/A | TBD | FY25 | FY25 |
| LRN | Wilson Lock Valve & Gate Seals | Florence (Alabama) | under SAT | TBD | Small Business Set Aside | N/A | TBD | Q4 FY25 | Q4 FY25 |
| LRN | Channels - Purchase a new smaller size boat | TBD | under SAT | TBD | Small Business Set Aside | N/A | TBD | FY25 | FY25 |
| LRN | TMDE Calibration | Tennessee | under SAT | TBD | Small Business Set Aside | N/A | TBD | FY25 | FY25 |
| LRN | Wolf Creek- New Playground and Install | Jamestown (Kentucky) | under SAT | TBD | Small Business Set Aside | N/A | TBD | FY25 | FY25 |
| LRN | Martin's Fork- Crane Rental | Cawood (Kentucky) | under SAT | TBD | Small Business Set Aside | N/A | TBD | Q3 FY25 | Q4 FY25 |
| LRN | Nickajack Lock- Tow Haulage Highspeed Gearbox and Limit Switch Rehab | Chattanooga (Tennessee) | under SAT | TBD | Small Business Set Aside | N/A | TBD | FY25 | FY25 |
| LRN | BPA's - Elevator Inspections | Tennessee | under SAT | TBD | Small Business Set Aside | N/A | TBD | FY25 | FY25 |
| LRN | BPA's - Bridge Inspections | Tennessee | under SAT | TBD | Small Business Set Aside | N/A | TBD | FY25 | FY25 |
| LRN | Barkley Dam- Em. Gate Machinery Repairs | Clarksville (Tennessee) | under SAT | TBD | Small Business Set Aside | N/A | TBD | FY25 | FY25 |
| LRN | FY26 New Park Attendants LRN | Tennessee | under SAT | TBD | Small Business Set Aside | N/A | TBD | FY26 | FY26 |
| LRN | Dale Hollow TQ Security Fence | Knoxville (Tennessee) | under SAT | TBD | Small Business Set Aside | N/A | TBD | FY25 | FY25 |
| LRN | BPA- Ops-Lakes- Sunken Vessel Removal | TBD | under SAT | TBD | Small Business Set Aside | N/A | TBD | FY25 | FY25 |
| LRN | Ops- MST Iroquois-Dry Dock- replace engine cooler | TBD | under SAT | TBD | Small Business Set Aside | N/A | TBD | FY25 | FY25 |
| LRN | Old Hickory ESS Building Rehabilitation from tornado damage | Hendersonville (Tennessee) | $10M-$25M | TBD | Small Business Set Aside | TBD | TBD | TBD | FY26 |
| LRN | Old Hickory Toe Drain Remediation | Hendersonville (Tennessee) | $1M-$5M | TBD | Small Business Set Aside | LRN Stabilization MATOC | Task Order | TBD | FY25 |
| LRN | Watts Bar TVA Ramp. Construct a permanment ramp at Watts Bar to allow river access for TVA Nuclear for the movement of critical equipment via barge to the facility. | Spring City (Tennessee) | $500K-$1M | 237990 | Small Business Set Aside | TBD | TBD | TBD | FY26 |
| LRN | Claims Consultant. Services for claims consulant associated with Chickamauga Lock construction claims and disputes | Grand Rivers (Kentucky) & Chattanooga (Tennessee) | over SAT | TBD | TBD | N/A | SAP | TBD | FY25 |
| LRN | Wolf Creek and Center Hill Instrumentation Survey Phase II | Jamestown (Kentucky) & Lancaster (Tennessee) | under SAT | TBD | Small Business Set-Aside | GSA | Task Order | TBD | Q2FY25 |
| LRN | Kentucky Lock Gearbox Repair | Grand Rivers (Kentucky) | Over SAT | TBD | TBD | TBD | SAP | TBD | FY25 |
| LRN | Supply Remote Switch Operator for Nickajack and Chickamauga Locks | Newhope (Tennessee) and Chattanooga (Tennessee) | Under SAT | TBD | Small Business Set-Aside | TBD | SAP | Q3 FY25 | FY25 |
| LRN | Dumpster Service for Laurel River Lake | London (Kentucky) | Under SAT | TBD | Small Business Set-Aside | TBD | SAP | Q3 FY25 | FY25 |
| LRN | Real Estate Titles | Nashville (Tennessee) | Over SAT | TBD | Small Business Set-Aside | Base Purchase Agreement (BPA) | SAP | Q4 FY25 | Q1 FY26 |
| LRN | Real Estate Appraisals | Nashville (Tennessee) | Over SAT | TBD | Small Business Set-Aside | Base Purchase Agreement (BPA) | SAP | Q1 FY26 | Q2 FY26 |
| LRN | Mechanical Engineer CMS Support for Chickamauga Lock | Chattanooga (Tennessee) | Over SAT | TBD | WOSB | LRD AE CMS MATOC | Task Order | TBD | TBD |
| LRN | Cordell Hull O&M Requirements | Carthage (Tennessee) | Over SAT | 561210 | Small Business Set Aside | N/A | RFP | Q4 FY25 | Q1 FY26 |
| LRN | Wilson Lock Ceramic Metal Base and Solidifier | Florence (Alabama) | Under SAT | | Small Business Set Aside | N/A | SAP | Q3 FY25 | Q3 FY25 |
| LRN | Barkely Power Plant- Raw Water System Replacement | Grand Rivers (Kentucky) | Over SAT | TBD | TBD | LRD Design Build Construction MATOC | Task Order | Q3 FY25 | Q14FY25 |
| LRN | Wolf Creek Liquid Oxygen Supply Contract | Jamestown (Kentucky) | Over SAT | TBD | TBD | N/A | SAP | Q3 FY25 | Q4 FY25 |
| LRN | Construction of stairs in Floating Mill Campground on Center Lake. Repair 7 sets of existing steps adjacent too the new curbing installation in Floating Mill Campground to improve storm water runoff and curb drainage within the area. | Silver Point (Tennessee) | Under SAT | TBD | Small Business Set Aside | TBD | SAP | Q3 FY25 | Q4 FY25 |
| LRN | Barkley Transformer DGA System | Grand Rivers (Kentucky) | Over SAT | TBD | TBD | TBD | SAP | FY25 | FY25 |
| LRN | Dale Hollow Exciter Replacement | Celina (Tennessee) | $5M-$10M | 237130 | Unrestricted | LRN Excitation SATOC | Task Order | FY26 | FY26 |
| LRN | Center Hill and Dale Hollow Headworks Lifting Equipment | Lancaster (Tennessee) &Celina (Tennessee) | TBD | TBD | TBD | TBD | TBD | FY26 | FY26 |
| LRN | BPA- Fuel & Turbine Oil | Nashville (Tennessee) | Over SAT | TBD | TBD | Base Purchase Agreement (BPA) | Base Purchase Agreement (BPA) | Q4 FY25 | Q1/Q2 FY26 |
| LRN | Center Hill O&M Requirement Services | Lancaster (Tennessee) | Over SAT | 561210 | Small Business Set Aside | N/A | RFP | Q4 FY25 | Q2 FY26 |
| LRN | Old Hickory O&M Requirement Services | Hendersonville (Tennessee) | Over SAT | 561210 | Small Business Set Aside | N/A | RFP | Q4 FY25 | Q1 FY26 |
| LRN | J. Percy Priest O&M Requirement Services | Nashville (Tennessee) | Over SAT | 561210 | Small Business Set Aside | N/A | RFP | Q4 FY25 | Q2 FY26 |
| LRN | Cherokee National Forest | U.S. Forest Service Debris Removal | Over SAT | TBD | TBD | SATOC | Task Order | TBD | TBD |
| LRN | Lake Cumberland UTV Purchase | Somerset (Kentucky) | Under SAT | TBD | Small Business Set Aside | GSA | SAP | Q3 FY25 | Q3 FY25 |
| LRN | Wheeler Lock Air Compressor (furnish & install) | Rogersville (Alabama) | Under SAT | TBD | Small Business Set Aside | GSA | SAP | Q3 FY25 | Q3 FY25 |
| LRN | Underwater Camera / Imaging Equipment purchase for Dive Team | Nashville (Tennessee) | Under SAT | TBD | TBD | TBD | SAP | Q4 FY25 | Q4 FY25 |
| LRN | Contract Administrator Chickamauga Lock | Chattanooga (Tennessee) | Under SAT | TBD | TBD | MATOC | Task Order | Q4 FY25 | Q4 FY25 |
| LRN | Watts Bar and Pickwick Forklift Purchase | Spring City / Counce (Tennessee) | Under SAT | TBD | TBD | GSA | SAP | Q4 FY25 | Q4 FY25 |
| LRN | Center Hill Oil Filled Transformers Repair Service | Lancaster (Tennessee) | Under SAT | TBD | Small Business Set Aside | TBD | SAP | Q4 FY25 | Q4 FY25 |
| LRN | Tennessee River Area- Purchse Wire Rope | (Tennessee) | Under SAT | TBD | Small Business Set Aside | TBD | SAP | Q4 FY25 | Q4 FY25 |
| LRN | Wilson and Wheeler Locks & Dams Shop Doors (with incidental install) | Florence / Decatur (Alabama) | Under SAT | TBD | Small Business Set Aside | TBD | SAP | Q4 FY25 | Q4 FY25 |
| LRN | Center Hill Power Plant CO2 Bulk Tank System. Purchse a CO2 Bulk Tank System. System will be used for fire protection for the hydro generators and oil storage rooms. | Lancaster (Tennessee) | Over SAT | TBD | TBD | TBD | SAP | Q4 FY25 | Q4 FY25 |
| LRN | Dale Hollow Dam Main Generating VCB (vacuum circuit breaker). Purchase a Main generating VCB. The VCB will be utilized for the facilitation of continuous ability of power generation. A VCB is needed for correct Arc flash protocols according to guidelines in the NFPA 70 and the EM 385-1-1. | Celina (Tennessee) | Over SAT | TBD | TBD | TBD | SAP | Q4 FY25 | Q4 FY25 |
| LRN | Center Hill - Diesel Generator purchase. | Lancaster (Tennessee) | Under SAT | TBD | TBD | TBD | SAP | Q4 FY25 | Q4 FY25 |
| LRN | Watts Bar Lab Testing (Geotech) | Spring City (Tennessee) | Under SAT | TBD | TBD | LRH AE Geotech MATOC | Task Order | Q4 FY25 | Q4 FY25 |
| LRN | Wolf Creek - Mill Purchase | Jamestown (Kentucky) | Under SAT | TBD | TBD | GSA | SAP | Q4 FY25 | Q4 FY25 |
| LRN | Wolf Creek - Lathe Purchase | Jamestown (Kentucky) | Under SAT | TBD | TBD | GSA | SAP | Q4 FY25 | Q4 FY25 |
| LRN | Wolf Creek - Scissor Lift Purchase | Jamestown (Kentucky) | Under SAT | TBD | TBD | GSA | SAP | Q4 FY25 | Q4 FY25 |
| LRN | Center Hill Forklift | Lancaster (Tennessee) | Under SAT | TBD | TBD | GSA | SAP | Q4 FY25 | Q4 FY25 |
| LRN | Center Hill CO2 Storage Tank Purchase | Lancaster (Tennessee) | Over SAT | TBD | TBD | TBD | SAP | Q4 FY25 | Q4 FY25 |
| LRN | Dale Hollow Generator Load Bank | Celina (Tennessee) | Under SAT | TBD | TBD | GSA | SAP | Q4 FY25 | Q4 FY25 |
| LRP | Saw Mill Run Local Protection Project | Pittsburgh- Allegheny County- PA | $1M and $5M | 237990 | Small Business Set-Aside | N/A | IFB | FY25 Q1 | FY25 Q2 |
| LRP | SEC 219 City of Chester Water System Improvements | Chester- Hancock County- WV | $1M and $5M | 237110 | Small Business Set-Aside | N/A | RFP | FY25 Q1 | FY25 Q2 |
| LRP | IIJA Ohio River - Emsworth Replace Hydraulic Gate Cylinders | Pittsburgh- Allegheny County- PA | $5M and $10M | 237990 | Unrestricted - Full & Open | N/A | IFB | FY25 Q1 | FY25 Q2 |
| LRP | DRSAA FY23 AR - Replace Anchor Point Buoys for Safety Boom | Allegheny County- PA | $100K and $250K | 238290 | Unrestricted - Full & Open | Construction DBB Rivers & Marine MATOC Pool W9123722D0027 - W9123722D0030 | RFP | FY25 Q1 | FY25 Q1 |
| LRP | SEC 219 McMechen WV Storm Water Project | Mcmechen- Marshall County- WV | $1M and $5M | 237110 | Small Business Set-Aside | N/A | IFB | FY25 Q1 | FY25 Q2 |
| LRP | IIJA Loyalhanna Solar Lights | Saltsburg- Westmoreland County- Pa | $25K and $100K | 238210 | Small Business Set-Aside | N/A | | FY25 Q1 | FY25 Q2 |
| LRP | SEC 219 City of Paden City | Paden City- Tyler and Wetzel Counties- WV | $5M and $10M | 237110 | Small Business Set-Aside | N/A | IFB | FY25 Q1 | FY25 Q1 |
| LRP | FY22 Dashields Upper Guide Wall Stabilization Project | Coraopolis- Allegheny County- PA | $5M and $10M | 237990 | Unrestricted - Full & Open | N/A | IFB | FY25 Q1 | FY25 Q2 |
| LRP | FY23 MR Maxwell - Repair Interlocks | Centerville- Washington and Fayette County- PA | $1M and $5M | 237990 | Small Business Set-Aside | N/A | IFB | FY25 Q1 | FY25 Q2 |
| LRP | FY24 IIJA Johnstown Sediment Removal Phase 4 | Johnstown- Cambria County- PA | $5M and $10M | 237990 | Small Business Set-Aside | N/A | IFB | FY25 Q1 | FY25 Q2 |
| LRP | FY24 Tionesta Construct Bulkhead Hoist Jib Platform | Tionesta- Forest County- PA | $500K and $1M | 237990 | Small Business Set-Aside | N/A | IFB | FY25 Q1 | FY25 Q2 |
| LRP | FY24 OR Hannibal - 4-Corner Hydraulic System | New Martinsville- Wetzel County- WV | $10M and $25M | 237990 | Unrestricted - Full & Open | N/A | IFB | FY25 Q1 | FY25 Q2 |
| LRP | FY24 Ohio River - Dredging | Ohio River | $1M and $5M | 237990 | Unrestricted - Full & Open | Regional Dredging MATOC Pool W9123722D0002 - W9123722D0004 | RFP | FY25 Q2 | FY25 Q3 |
| LRP | FY24 Tygart Replace PLC for Dam Sluice Gates | Taylor County- WV | $1M and $5M | 237990 | Small Business Set-Aside | N/A | IFB | FY25 Q2 | FY25 Q3 |
| LRP | IIJA Berlin Sewage Treatment and Collection System | Mahoning County- Ohio | $1M and $5M | 237110 | Small Business Set-Aside | N/A | IFB | FY25 Q2 | FY25 Q3 |
| LRP | SEC 219 City of McKeesport - Long Run Watershed Improvements | Mckeesport- Allegheny County- PA | $500K and $1M | 237110 | Small Business Set-Aside | N/A | IFB | FY25 Q2 | FY25 Q3 |
| LRP | Lower Mon 234 | Elizabeth- PA | $10M and $25M | 237990 | Unrestricted - Full & Open | N/A | IFB | FY25 Q2 | FY25 Q3 |
| LRP | FY24 Allegheny River - Dredging | Allegheny River | $500K and $1M | 237990 | Unrestricted - Full & Open | Regional Dredging MATOC Pool W9123722D0002 - W9123722D0004 | RFP | FY25 Q2 | FY25 Q3 |
| LRP | FY24 Monongahela River - Dredging | Monongahela River | $1M and $5M | 237990 | Unrestricted - Full & Open | Regional Dredging MATOC Pool W9123722D0002 - W9123722D0004 | RFP | FY25 Q2 | FY25 Q3 |
| LRP | IIJA & FY23 Conemaugh Dredging | Saltsburg- Westmoreland County- Pa | $10M and $25M | 237990 | Small Business Set-Aside | N/A | IFB | FY25 Q3 | FY25 Q4 |
| LRP | SEC 219 Follansbee- Northern WV | Follansbee- Brooke County- WV | $1M and $5M | 237110 | Small Business Set-Aside | N/A | IFB | FY25 Q1 | FY25 Q2 |