Our Goal

To equip industry with accurate contracting forecasts to maintain transparency in our program. The forecast is intended to allow industry to make business decisions earlier in the acquisition process. The forecast covers all seven districts within LRD and is scheduled to be updated bi-monthly. All dates and monetary ranges in the forecast are tentative and subject to change.

Aquisition Forecast Legend

  • SBSA - Small Business Set Aside
  • F&O - Full and Open (Unrestricted)
  • 8(a) SS - 8(a) Sole Source
  • WOSB - Women-Owned Small Business
  • SS - Sole Source (non 8(a))
  • 8(a) Comp - 8(a) Competitive
  • HBZ - HubZone Set-Aside
  • MATOC - Multiple Award Task-Order Contract
  • IDIQ - Indefinite Delivery Indefinite Quantity Contract
  • TO - Task Order
  • SAP - Simplified Acquisition Procedures
  • IFB - Sealed Bid (Invitation for Bid)
  • RFP - Request for Proposal

Download Forecast of Opportunities

  • Contract Opportunity Forecast - Complete Categorical Breakdown

    Marcel Hull
    This spreadsheet is a complete categorical breakdown of all current opportunities for contractors. Click to download a fully accessible file, broken down by district. Contact LRD Contracting office for more information (celrd-contracting@usace.army.mil)
    • Organization: Great Lakes and Ohio River Division
    • Published On: 4/18/2025
    • Uploaded On: 7/25/2024
Page 1 of 1

View Forecast of Opportunities

Click any column header to sort table data.
DistrictProject DescriptionProject LocationEst $ RangeNAICSSet-AsideContract VehicleAward TypeAdvertise DateAward Date
LRBSandusky Harbor Dredging - Channel maintenance dredgingSandusky (Ohio)$500K-$1M237990Small Business Set AsideMATOCTOFY25 Q4FY25 Q4
LRBFairport Dredging - Channel mainenance dredgingFairport (Ohio)$1M-$5M237990Small Business Set AsideMATOCTOFY25 Q2FY24 Q3
LRBCleveland Harbor Dredging - Channel mainenance dredgingCleveland (Ohio)$5M-$10M237990Small Business Set AsideNAIFBFY25 Q2FY25 Q2
LRBAshtabula Harbor Dredging - Channel mainenance dredgingAshtabula (Ohio)$1M-$5M237990Small Business Set AsideMATOCTOFY25 Q3FY25 Q3
LRBBuffalo Harbor Dredging - Channel mainenance dredgingBuffalo (New York)$1M-$5M237990Small Business Set AsideMATOCTOFY25 Q4FY25 Q4
LRBConneaut Harbor Dredging - Channel mainenance dredgingConneaut (Ohio)$1M-$5M237990Small Business Set AsideMATOCTOFY25 Q2FY25 Q3
LRBRocky River Harbor Dredging - Channel mainenance dredgingRocky River (Ohio)$500K-$1M237990Small Business Set AsideMATOCTOFY25 Q3FY25 Q3
LRBGreat Sodus/Oak Orchard Harbor Dredging - Channel mainenance dredgingGreat Sodus and Oak Orchard (New York)$500K-$1M237990Small Business Set AsideMATOCTOFY25 Q2FY25 Q4
LRBLorain Harbor Dredging - Channel mainenance dredgingLorain (Ohio)$1M-$5M237990Small Business Set AsideMATOCTOFY25 Q3FY25 Q3
LRBMaumee Bay and River Dredging - Channel mainenance dredgingToledo(Ohio)$1M-$5M237990Small Business Set AsideSATOCTON/AFY25 Q3
LRBOswego Harbor West Arrowhead Breakwater Repair - Repair BreakwaterOswego (New York)$5M-$10M237990UnrestrictedMATOCTOFY25 Q2FY25 Q3
LRBSLDA RemediationParks Township (Pennsylvania)$250M-$500M562910UnrestrictedNARFPFY25 Q3FY26 Q2
LRBGuterl RemediationLockport (New York)$249M562910Small Business Set AsideNARFPFY25 Q2FY25 Q4
LRBBig John Salvage River AreaFairmont (West Virginia)$25M-$100M562910Small Business Set AsideNARFPFY25 Q4FY26 Q1
LRBBig John Salvage Upland AreaFairmont (West Virginia)$25M-$100M562910Small Business Set AsideNARFPFY25 Q4FY26 Q1
LRBErie North Pier RepairErie (Pennsylvania)$1M-$5M237990UnrestrictedMATOCTOFY25 Q3FY25 Q4
LRBBoston Mills Ecosystem RestorationCleveland (Ohio)$10M-$25M237990TBANAIFBFY25 Q3FY25 Q4
LRBEuclid Creek Ecosystem RestorationEuclid (Ohio)$1M-$5M237990TBANAIFBFY25 Q3FY25 Q4
LRBBuffalo CDF RepairBuffalo (New York)$10M-$25M237990UnrestrictedMATOCTOFY25 Q2FY25 Q2
LRBBarcelona Breakwater Grouting RepairBarcelona (New York)$1M-$5M237990UnrestrictedMATOCTOFY25 Q4FY25 Q4
LRBWest Valley Spillway RepairsWest Valley(New York)$1M-$5M237990UnrestrictedNARFPFY25 Q2FY25 Q2
LRBUSDA Grape Research FacilityGeneva (New York)$25M-$100M237990UnrestrictedNARFPFY25 Q2FY25 Q3
LRCReplace Windows in Control Tower- Mississinewa Lake- INPeru- IN$50K-100KTBDTBDTBDTBDFY25 Q1FY25 Q1
LRCWater Treatment - Indiana Harbor and Canal- INEast Chicago- IN$5M-$10MTBDTBDTBDTBDFY25 Q1FY25 Q1
LRCHarbor Channel Maintenance- Big Suamico River- WISuamico- WI$500K-$1MTBDTBDTBDTBDFY25 Q2FY25 Q3
LRCShorearm Extension & Eastern Outer Breakwater Repair- Chicago HarborChicago. IL$5M-$10MTBDTBDTBDTBDFY24 Q4FY25 Q2
LRCAquatic Ecosystem Restoration- Honey Creek Sec 206Milwaukee- WI$10M-$25MTBDTBDTBDTBDFY26 Q2FY26 Q3
LRCManitowoc North & South Breakwater Repair- Manitowoc Harbor- WIManitowoc- WI$5M-$10MTBDTBDTBDTBDFY25 Q4FY25 Q4
LRCWater Main Improvements- Cook County Sec 219- Cicero- ILCicero- IL$1M-$5MTBDTBDTBDTBDFY25 Q2FY25 Q2
LRCDredging- Indiana Harbor- INEast Chicago- IN$1M-$5MTBDTBDTBDTBDFY25 Q2FY25 Q2
LRCDam Removal- Horlick Dam- WI- Sec 506Racine- WI$1M-$5MTBDTBDTBDTBDFY25 Q4FY25 Q4
LRCNorth Breakwater Repair- Algoma Harbor- WIAlgoma- WI$10M-$25MTBDTBDTBDTBDFY25 Q3FY25 Q4
LRCCSSC Electric Dispersial Barrier- IL- Barrier ID Generator ReplacementLockport- IL$250K-$500KTBDTBDTBDTBDFY25 Q2FY25 Q2
LRCCSSC Electric Dispersial Barrier- IL- Barrier I Camera UpgradesLockport- IL$150K-$300KTBDTBDTBDTBDFY25 Q1FY25 Q2
LRCHerbicide Facility Services- Multiple LocationsChicago- IL / Lockport- IL$50K-$100KTBDTBDTBDTBDFY25 Q2FY25 Q2
LRCChicago Harbor Lock & Dam- Platform Work Boat ProcurementChicago- IL$50K-$100KTBDTBDTBDTBDFY25 Q2FY25 Q2
LRCT.J.O'Brien Lock and Dam- East/West Embankment RaisingChicago- IL$1M-$5MTBDTBDTBDTBDFY25 Q4FY25 Q4
LRCHerbicide Facility Services- Multiple LocationsIL- IN- WITBDTBDTBDTBDTBDFY25 Q2FY25 Q2
LRCCrane Contract- Multiple LocationsIL- IN- WI$150K-$300KTBDTBDTBDTBDFY25 Q2FY25 Q2
LRCGeneral Jones Armory- AE Contract- Design BuildChicago- IL$10M-$25MTBDTBDTBDTBDFY25 Q3FY26 Q1
LRCKenosha Harbor Sediment SamplingIL- IN- WI$100K-$150KTBDTBDTBDTBDFY25 Q3FY25 Q3
LRCPort Washington Sediment SamplingIL- IN- WI$100K-$150KTBDTBDTBDTBDFY25 Q3FY25 Q3
LRCMichigan City Sediment SamplingIL- IN- WI$100K-$150KTBDTBDTBDTBDFY25 Q3FY25 Q3
LRCBat Survey- Survey/SamplingIL- IN- WI$100K-$150KTBDTBDTBDTBDFY25 Q3FY25 Q3
LRCCSSC Electric Dispersal Barrier- IL - Lewis Property DemolitionLockport- IL$400K-$600KTBDTBDTBDTBDFY25 Q2FY25 Q2
LRCKaukauna Right Abutment Repair - Construction and Repair of the right abutment wall adjacent to the Kewaunee DamKewaunee- IL$1M-$5MTBDTBDTBDTBDFY25 Q3FY25 Q4
LRCLake George East Phase II Dredging- Dredging 45-000 to 60-000 CY of material- placement in the CDFEast Chicago- IN$5M-$10MTBDTBDTBDTBDFY25 Q4FY26 Q1
LRCLake George West Sampling - Sediment SamplingHammond- IN$100K-$250KTBDTBDTBDTBDTBDTBD
LRCSheboygan Harbor Sediment SamplingSheboyan Harbor- WI$100K-$250KTBDTBDTBDTBDFY25 Q3FY26 Q3
LRCStrugeon Bay Dredging- Dredging of 80-000 cubic yardsSturgeon Bay- WI$1M-$2MTBDTBDTBDTBDFY26 Q2FY26 Q3
LRCSection 219- Calumet Region -Sanitary Sewer ProjectChesterton- IN$1M-$5MTBDTBDTBDTBDFY25 Q4FY25 Q4
LRCSection 219- Calumet Airport- Gary Airport - Infrastructure Improvementsfor the Storm Sewer System- sanitary system and a pump stationGary- IN$1M-$5MTBDTBDTBDTBDFY25 Q4FY25 Q4
LRCSection 219- Cook County- Niles- Stormwater Pipeline ProjectNiles- IL$1M-$5MTBDTBDTBDTBDFY25 Q4FY25 Q4
LRCSection 219- Cook County- Park Forest- Water Main ProjectPark Forest- IL$1M-$5MTBDTBDTBDTBDFY25 Q3FY25 Q4
LRCSection 219- Cook County- Flossmoor- Stormwater Pipeline ProjectFlossmoor- IL$1M-$5MTBDTBDTBDTBDFY25 Q3FY25 Q4
LRCSection 219- Cook County- La Grange- Sanitary Sewer ProjectLa Grange- IL$1M-$5MTBDTBDTBDTBDFY25 Q4FY25 Q4
LRCSection 219- Cook County- Steger- Stormwater Pipeline ProjectSteger- IL$1M-$5MTBDTBDTBDTBDFY25 Q4FY25 Q4
LRCSection 219- Cook County- Glenview- Infrastructure Improvements ProjectsGlenview- IL$1M-$5MTBDTBDTBDTBDFY25 Q3FY25 Q3
LRCCAP 206- Dutch Gap AER- Aquatic Ecosystem Restoration- Restoreation of rare and significant aquatic habitats within Lake County.Antioch- IL$10M-$15MTBDTBDTBDTBDFY25 Q3FY25 Q4
LRCUpper Des Plaines River and Tributaries Phase AER- Aquatic Ecosystem Restoration- Pollack Lake and Hastings Creek (Raven Glen)Antioch- IL$10M-$25MTBDTBDTBDTBDFY25 Q4FY25 Q4
LRCGreen Bay Harbor DredgingGreen Bay- WI$2M-$3MTBDTBDTBDTBDFY25 Q3FY25 Q3
LRCLGB-FR AOC - Spawning and Habitat Reefs - Aquatic Ecosystem RestorationGreen Bay- WI$5M-$10MTBDTBDTBDTBDFY25 Q4FY25 Q4
LRCLGB-FR AOC - Longtail Point Habitat Restoration- Aquatic Ecosystem RestorationGreen Bay- WI$15M-$20MTBDTBDTBDTBDFY26 Q4FY26 Q4
LRCLGB-FR AOC - De Pere Dam Riverine Wetland Restoration- Aquatic Ecosystem RestorationDe Pere- WI$20M-$25MTBDTBDTBDTBDFY26 Q4FY26 Q4
LRCKaukauna Parcel J Tree RemovalKaukauna- WI$100K-$250KTBDTBDTBDTBDFY25 Q2FY25 Q2
LRCKaukauna Dry Dock #3- Soil ExcavationKaukauna- WI$1M-$5MTBDTBDTBDTBDFY26 Q1FY26 Q1
LRCKaukauna Parcel J - Soil ExcavationKaukauna- WI$1M-$5MTBDTBDTBDTBDFY25 Q4FY26 Q1
LRCKewaunee DredgingKewaunee- WI$1M-$5MTBDTBDTBDTBDFY26 Q2FY26 Q3
LRCUpper Appleton Wall RepairAppleton- WI$5M-$10MTBDTBDTBDTBDFY25 Q3FY25 Q4
LRCKewaunee Breakwater Repair- Section CKewaunee- WI$1M-$5MTBDTBDTBDTBDFY26 Q2FY26 Q2
LRCKaukauna Dam - Right Abutment RepairKaukauna- WI$1M-$5MTBDTBDTBDTBDFY25 Q4FY25 Q4
LREGrand Haven North Pier Wave Attenuator: demolish a section of the harbor's north pier to allow for the construction of a rubble mound wave attenuator.Grand Haven (Michigan)Between $5M and $10M237990Small Business Set AsideNAIFBFY25 Q2FY25 Q4
LRELittle Manistee Sea Lamprey Barrier & Trap: Work primarily consists of replacing the concrete spillway structure located north of the Little Manistee Weir.Manistee (Michigan)Between $1M and $5M237990UnrestrictedNAIFBFY24 Q2FY25 Q3
LRE15KV Switchgear for the SOOSault Ste. Marie (Michigan)Between $5M and $10M238210UnrestrictedNARFPFY25 Q2FY25 Q3
LRESOO Duct Bank and Generator: Standby Generator System – construction of new natural gas fueled back-up generator system with removal of existing back-up generators and associated diesel fuel storage and distribution system.Sault Ste. Marie (Michigan)Between $10M and $25M236220UnrestrictedNARFPFY25 Q2FY25 Q3/Q4
LRESault Material Storage Fac and Site Improvements Complex.Sault Ste. Marie (Michigan)Between $5M and $10M237990UnrestrictedTask Order off Disgn-Build MAOC (W912P523D0001-W912P523D0007RFPFY25 Q2FY25 Q3
LRESebewaing River South Levee RepairsSebewaing (Michigan)Between $10-000-000 and $25-000-000237990Small Business Set AsideN/AIFBFY25 Q2FY25 Q3
LRESPO Fleet Dry Dock Inspections- RepairsSault Ste Marie (Michigan)$1M and $5M3366118(a)8(a)RFPFY25 Q1FY25 Q2
LREWindow Cleaning at the Sault Project OfficeSault Ste Marie (Michigan)TBDTBDTBDN/ARFPFY25 Q2FY25 Q3
LRELansing 219 Sewer Separation: provide infrastructure work to eliminate combined sewer overflows via construction of a new- dedicated sanitary sewer and rehabilitation of existing combined sewer into a dedicated storm sewer.Lansing (Michigan)Between $5-000-000 and $10-000-000237110Full and OpenN/AIFBFY25 Q3FY26 Q1
LRESPO Non-Destructive Weld Testing Master BPASault Ste Marie (Michigan)TBD541380Small Business Set AsideN/ARFPFY25 Q2FY25 Q2/Q3
LREGE Vernova PartsSault Ste Marie (Michigan) 811310Sole SourceN/ARFQFY25 Q2FY25 Q2/Q3
LREESS Upgrade: The U.S. Army Corps of Engineers (USACE) is seeking to establish a contract with the purpose of upgrading existing CCURE and Software House Security Access Control hardware.Sault Ste Marie (Michigan)Between $100-000 and $250-000TBDSole SourceN/ARFPFY25 Q1/Q2FY25 Q2/Q3
LREArcadia Harbor MD(Michigan)$1M and $5M237990Small Business Set AsideTask Order off MD MATOC (W911XK21D0001 - W911XK21D0008)RFPFY25 Q2/Q3FY25 Q3
LRENew Buffalo Harbor MD(Michigan)$1M and $5M237990Small Business Set AsideTask Order off MD MATOC (W911XK21D0001 - W911XK21D0008)RFPFY25 Q2/Q3FY25 Q3
LREGreat Lakes Dredging MATOC: Establishing a new MD MATOCwithin LRE 237990TBDN/ARFPFY25 Q1/Q2FY25 Q2/Q3
LREWater Street CSO: Develop RTA construction documents for the redesign and construction of the combined sewer overflow system.Sault Ste. Marie (Michigan)TBD541330Small Business Set AsideTask Order off of LRE A-E Planning and Design Service IDIQs- Contracts Nos W911XK22D0001- W911XK22D0002- and W911XK22D0003RFPFY24 Q4FY25 Q2/Q3
LREClinton River Microbial Source Tracking: conduct analyses to determine where E. coli is present in the Clinton River AreaClinton River Area located in Macomb and Oakland Counties (Michigan)$100-000 to $500-000541380TBDTBDTBDFY25 Q1FY25 Q2/Q3
LRESt Mary's Pier Inspection AE: Contract for Inspection and Assessment of Soo Locks Piers.Sault Ste. Marie (Michigan)TBD541330Small Business Set AsideTask Order off of LRE A-E Planning and Design Service IDIQs- Contracts Nos W911XK22D0001- W911XK22D0002- and W911XK22D0003RFPFY25 Q1/Q2FY25 Q2
LRELane Street Remedial Design - A-E Design Services for Lane Street Superfund Project includes pilot study and design.Elkhart (Indiana)Between $500-000 and $1-000-000541330UnrestrictedTask order off LRL A-E Environmental – Unrestricted IDIQs- Contract Nos. W912QR23D0001 through W912QR23D0005RFPFY25 Q1FY25 Q2
LREToumey Nursery Design Develop RTA construction documents for construction of a new growing and processing facility at the J.W. Toumey NurseryWatersmeet (Michigan)$1M and $5M541330Small Business Set AsideTask order off LRD IIJA Unrestricted A-E IDIQs under Contract Nos. W912QR23D0041 through W912QR23D0047RFPFY25 Q1FY25 Q2/Q3
LREFY25 Monroe Harbor MD and CDF Maintenance(Michigan)$1M and $5M237990Small Business Set AsideTBDIFBFY25 Q2/Q3FY25 Q3/Q4
LRECrib Dam Stabilization(Michigan)TBDTBDTBDTBDTBDFY25 Q1/Q2FY25 Q3/Q4
LREFY24 Drone Detection System: provide supplies for a drone detection systemSault Ste Marie (Michigan)$100-000 to $500-000TBDSmall Business Set AsideTBDTBDFY25 Q2/Q3FY25 Q2/Q3
LREO&M Leland and Portage Lake Harbors MD(Michigan)$1M and $5M237990TBDTBDTBDFY25 Q1/Q2FY25 Q2/Q3
LREDuluth Vessel Yard Phase II QA TestingDuluth (Minnesota)TBD541330TBDTBDTBDFY25 Q2/Q3FY25 Q2
LREDuluth Ship Canal QA Testing on ConcreteDuluth (Minnesota)TBD541330TBDTBDTBDFY25 Q1/Q2FY25 Q2/Q3
LREFY23 Inland Route Restroom Addition: Prefabricated restroom structure placed on existing concrete pad and sewage line to municipal main TBDTBDSmall Business Set AsideN/AIFBFY25 Q1/Q2FY25 Q2
LRELexington Breakwater RepairLexington (Michigan)$5M and $8 Small Business Set AsideN/AIFBFY26 Q1FY26 Q2
LRESoo Crib Dam Stabalization: Construction to stabilize the Soo Crib Dam. Anticipated design to include a hybrid SSP wall along the length of the crib dam (to be constructed mainly from water- support from land) and mix of reconstruction/grouting at the east and west tie-ins (with coffer dam(s) at the tie-in areas).Sault Ste Marie (Michigan)$10M and $15TBDUnrestrictedN/ABVTOFY25 Q3/Q4FY25 Q4
LREFY25 Holland Inner MDHolland (Michigan)$1M and $2M237990Small Business Set AsideN/AIFBFY25 Q3/Q4FY25 Q4
LREDuluth Superior MDDuluth (Minnesota)$5M and $8237990UnrestrictedN/AIFBFY25 Q3/Q4FY25 Q4
LREErie Pier CDF Material RemovalDuluth (Minnesota)$1M and $5M Small Business Set AsideN/ARFPFY25 Q3/Q4FY25 Q4
LREFY25 Manistique Harbor MDManistique (Michigan)$1M and $5M237990Small Business Set AsideN/AIFBFY25 Q3/Q4FY25 Q4
LREFY25 Holland Inner MDHolland (Michigan)$1M and $5M237990Small Business Set AsideN/AIFBFY25 Q3/Q4FY25 Q4
LREFY23 Saginaw River CDF Dike RaisingSaginaw (Michigan)$500-000 and $1-000-000237990Small Business Set AsideN/AIFBFY25 Q3/Q4FY25 Q4
LREFY25 Monroe Harbor M/D & CDF MaintenanceMonroe (Michigan)$1M and $5M237990Small Business Set AsideN/AIFBFY25 Q3/Q4FY25 Q4
LREAshland- Bayfield- La Pointe Harbor Sediment SamplingWisconsin$250-000 and $500-000541620Small Business Set AsideTask Order off of LRE Environmental Services MATOCRFPFY25 Q2/Q3FY25 Q3
LRENorth Lansing Dam Sediment Sampling and SurveyMichiganTBD5416208(a)Task Order off of LRE (8a) Environmental Services MATOCRFPTBDTBD
LREKeweenaw Waterway and Eagle Harbor Sediment SamplingMichigan$200-000 and $500-000541620Small Business Set AsideTask Order off of LRE Environmental Services MATOCRFPFY25 Q2/Q3FY25 Q3
LREManistique Harbor Sediment SamplingMichigan$200-000 and $500-000541620Small Business Set AsideTask Order off of LRE Environmental Services MATOCRFPFY25 Q2/Q3FY25 Q3
LREPort Austin Harbor Sediment SamplingMichigan$100-000 and $300-00054120Small Business Set AsideTask Order off of LRE Environmental Services MATOCRFPFY25 Q2/Q3FY25 Q3
LREChannels of Lake St. Clair Sediment SamplingMichigan$200-000 and $500-00054120Small Business Set AsideTask Order off of LRE Environmental Services MATOCRFPFY25 Q2/Q3FY25 Q3
LREPoint Lookout & Tawas Bay Harbor Sediment Sampling and AnalysisMichigan$250-000 and $500-00054120Small Business Set AsideTask Order off of LRE Environmental Services MATOCRFPFY25 Q2/Q3FY25 Q3
LRESt. Clair River Harbor Sediment SamplingMichiganTBD54120Small Business Set AsideTask Order off of LRE Environmental Services MATOCRFPTBDTBD
LRECedar River Harbor Sediment SamplingMichiganTBD541208(a)Task Order off of LRE (8a) Environmental Services MATOCRFPTBDTBD
LREAu Sable Harbor Sediment SamplingMichiganTBD541208(a)Task Order off of LRE (8a) Environmental Services MATOCRFPTBDTBD
LREHarrisville Harbor Sediment SamplingMichiganTBD541208(a)Task Order off of LRE (8a) Environmental Services MATOCRFPTBDTBD
LREDetour Harbor Sediment SamplingMichiganTBD541208(a)Task Order off of LRE (8a) Environmental Services MATOCRFPTBDTBD
LREPine River Harbor Sediment SamplingMichiganTBD541208(a)Task Order off of LRE (8a) Environmental Services MATOCRFPTBDTBD
LRETwo Harbors Harbor Sediment SamplingMinnesotaTBD541208(a)Task Order off of LRE (8a) Environmental Services MATOCRFPTBDTBD
LRETallis Bay Sediment Sampling and Benchscale testingMinnesotaTBD541208(a)Task Order off of LRE (8a) Environmental Services MATOCRFPTBDTBD
LREElijah Root Dam Sediment Sampling and Archeologic SurveyMichiganTBD541208(a)Task Order off of LRE (8a) Environmental Services MATOCRFPTBDTBD
LREClinton River Confined Disposal Facility (CDF) Sampling and AnalysisMichiganTBD54120Small Business Set AsideTask Order off of LRE Environmental Services MATOCRFPTBDTBD
LREPoint Mouillee CDF Sampling and AnalysisMichiganTBD54120Small Business Set AsideTask Order off of LRE Environmental Services MATOCRFPTBDTBD
LRELes Cheneaux and Hammond Bay Harbor Sampling/SurveyMichiganTBD54120Small Business Set AsideTask Order off of LRE Environmental Services MATOCRFPTBDTBD
LRESt. Joseph (Inner) Sediment SamplingMichiganTBD54120Small Business Set AsideTask Order off of LRE Environmental Services MATOCRFPTBDTBD
LREPointe Mouille Confined Disposal Facility (CDF) Sediment SamplingMichiganTBD54120Small Business Set AsideTask Order off of LRE Environmental Services MATOCRFPTBDTBD
LREDetroit River Sediment SamplingMichiganTBD54120Small Business Set AsideTask Order off of LRE Environmental Services MATOCRFPTBDTBD
LRHRepair Pound River Sewage ServiceJohn W. Flannagan Dam VABetween $25K and $100K221320SBSA  Q12025Q22025
LRHReplace Workshop/GarageTappan Lake OHBetween $100K and $500K236220SBSASAP TBDTBD
LRHHazmat BuildingBluestone Dam WVBetween $100K and $500K236220SBSASAP Q22025Q22025
LRHShelter ReplacementAlum Creek Dam OHBetween $100K and $500K236220SBSASAP Q12025Q12025
LRHGuardrail ReplacementDelaware Lake OHBetween $100K and $500K237310SBSASAP TBDTBD
LRHPaving IDIQ(s)Huntington DistrictNTE $3M237310TBDMATOCIDIQQ32025Q42025
LRHIntake Structure and Dam RehabFishtrap Lake KYBetween $1M and $5M237990SBSAIFB Q12025Q12025
LRHRepair Spalling Concrete on Tainter Gate AbutmentsFishtrap Lake KYBetween $500K and $1M237990SBSAIFB Q22025Q22025
LRHShutters on Main Chambers for Meldahl and Greenup DamsFelicity OH and Greenup KYBetween $100K and $500K237990SBSATBD TBDTBD
LRHGantry Crane ReplacementDillon Lake OHBetween $500K and $1M237990TBDIIJA MATOCTask OrderQ12025Q22025
LRHIntake Structure and Dam RehabFishtrap Lake KYBetween $1M and $5M237990SBSAIFB Q12025Q22025
LRHRepair Spalling Concrete on Tainter Gate Abutments - Machinery PlatformFishtrap Lake KYBetween $500K and $1M237990SBSAIFB Q12025Q22025
LRHReplace Lower Twin Campground Road BridgeJohn W. Flannagan Dam VABetween $500K and $1M237990TBDLRD DB MATOCTask OrderQ12025Q22025
LRHRip rap addition to upstream face of dikePaint Creek Lake OHBetween $1M and $5M237990SBSAIFB Q12025Q12025
LRHBig Sandy DredgeKYBetween $1M and $5M237990TBD  Q32025Q32025
LRHOhio River Open Channel DredgeOhio RiverBetween $1M and $5M237990TBD  Q32025Q32025
LRHReplace Motor Control CenterGrayson Lake KY 335314SBSATBD Q22025Q22025
LRHConcrete spalling repairDelaware Lake OHBetween $100K and $500K237990SBSASB MATOCTask OrderQ12025Q12025
LRHConcrete Spalling RepairTom Jenkins Dam OHBetween $100K and $500K237990SBSASB MATOCTask OrderQ12025Q12025
LRHRepair Sinkhole and Downstream Bank ErosionFishtrap Lake KYBetween $1M and $5M237990SBSASB MATOCTask OrderQ22025Q32025
LRHKanawha River DredgeKanawha River WV<$25K237990TBD  Q32025Q32025
LRHReplace Greenfield Levee relief wellsPaint Creek Lake OH<$25K237990TBD  Q32025Q32025
LRHSpring DredgingDistrictBetween $100K and $500K237990TBDMATOCTask OrderQ32025Q32025
LRHChannel Bank RepairRoseville OHBetween $100K and $500K237990SBSASB MATOCTask OrderQ12025Q12025
LRHMotor Control Center (MCC) ReplacementBurnsville Lake WV 335314SBSABPA Call Q12025Q12025
LRHReplace Emergency GeneratorYatesville Lake KYBetween $500K and $1M237990SBSASB MATOCTask OrderQ12025Q22025
LRHMagnolia pump station tuck & pointBolivar Dam OHBetween $25K and $100K238140SBSASAP Q32025Q32025
LRHLCF CROC Roof RepairR3F RegionalBetween $100K and $500K238160SBSASAP Q12025Q12025
LRHBrewster Electric RehabBeach City OHBetween $25K and $100K238210SBSASAP Q12025Q22025
LRHUpgrade Incoming Power (Feeder and MCC)Willow Island Lock and Dam OHBetween $500K and $1M238210SBSATBD Q42025Q42025
LRHFencing ReplacementClendening Dam OHBetween $100K and $500K238990SBSATBD TBDTBD
LRHLCF Office TrailersR3F Regional 321991SBSATBD Q12025Q12025
LRHStone SupplySummersville Dam WV 327991SBSASAP TBDTBD
LRHCheatham Gate & Valve Rehab - Steel BPA CallMarietta Repair Station OH 331110SBSABPA Call Q12025Q22025
LRHHCF Steel Material BPA - Gate Lift SystemR3F Regional 331110SBSABPA Call Q12025Q22025
LRHReplace Low Flow Gate (Knife Valve)East Lynn Lake WV 332312SBSATBD Q22025Q32025
LRHU-Bolt FabricationCapt. Anthony Meldahl L&D OH 332312SBSA  Q12025Q12025
LRHFabricate four Culvert Valve BulkheadsCapt. Anthony Meldahl L&D OH 332312SBSAMATOCTask OrderQ12025Q12025
LRHDam Bulkhead ReplacementR.C. Byrd Locks and Dam WV 332313SBSAMATOCTask OrderQ22025Q22025
LRHC2 Scaffolding BPAR3F Regional 332323SBSABPA Call Q12025Q22025
LRHMCF Boiler ReplacementR3F Regional 332410SBSASAP TBDTBD
LRHOriginal Wire replacementWinfield Locks and Dam WV 332618SBSARFP Q12025Q22025
LRHSandblasting & Painting Gathrite GatesMarietta Repair Station OH 332813SBSABPA Call Q12025Q12025
LRHC2 Machining/Water Jet Material Services BPA (New Pool)R3F Regional 333515SBSANew BPA Q12025Q12025
LRHSupersawBluestone Dam WV 333515SBSASAP Q22025Q22025
LRHLCF 250KW Generator Set LCF & MCFR3F Regional 333611SBSASAP Q12025Q12025
LRHOffice GeneratorJohn W. Flannagan Dam VA 333611SBSA  Q12025Q22025
LRHLCF MRS & HCF 30 ft Gooseneck TrailerR3F Regional 333924SBSASAP TBDTBD
LRHAltoona Hydraulic Cylinder MaterialMarietta Repair Station OH 333995SBSABPA Call Q12025Q12025
LRHLCF Submersible pump 95 HPR3F Regional 333996SBSASAP Q12025Q12025
LRHMCF Evanick & Service Barge 101 Dry DockR3F Regional 336611SBSASAP Q12025Q12025
LRHLCF Man Baskets - safety equipment BPAR3F Regional 532412SBSABPA Call TBDTBD
LRHLCF Man Baskets for CraneR3F Regional 532412SBSABPA Call TBDTBD
LRHSavannah Bluff Crane RentalMarietta Repair Station OH 532412SBSAOn Hold On HoldOn Hold
LRHNat'l Nuclear Security Admin Production Modernization (NA-19) FY25DOE 541330UnrestrictedSATOCTask OrderQ32025Q32025
LRHPrado Dam Engineering During ConstructionCorona CA 541330UnrestrictedMATOCTask OrderTBDQ42025
LRHRDLP Con 1 Engineering During Construction by designer of record.  541330SBSASAA MATOCTask OrderQ22025Q32025
LRHDam Safety Emergency Action PlanBluestone Dam WV 541330UnrestrictedLB MATOCTask OrderQ22025Q42025
LRHDam Safety Mngt Center Geotechnical ServicesUSACENTE $45M541330Unrestricted New IDIQQ12025Q22025
LRHMaterials Explorations and TestingGarrison Dam 541330UnrestrictedLB SATOCTask OrderQ12025Q22025
LRHSRS Nuclear Materials Stabilization Safety Support CY25SC 541330UnrestrictedSATOCTask OrderQ12025Q12025
LRHDam Safety Design MATOC (New)USACENTE $20M541330SBSANew MATOCIDIQQ22025Q22025
LRHOhio River Mussel SurveyOhio River 541330SBSASATOCTask OrderQ32025Q32025
LRHKanawha River Mussel Survey and Biological AssessmentKanawha River WV 541330SBSASATOCTask OrderQ32025Q32025
LRHPh. IV Geotechnical Explorations & TestingGuajataca 541330UnrestrictedSATOCTask OrderQ12026Q12026
LRHSafety Assurance ReviewGuajataca 541330UnrestrictedSATOCTask Order2Q20262Q2026
LRHC2 Fire Supression Inspection BPAR3F Regional 541990SBSANew BPA Q12025Q12025
LRHIntake Scructure Security SystemFishtrap Lake KYBetween $1M and $5M237990SBSAIFB TBDTBD
LRHSecurity CamerasUpper Tuscarawas Area OH 561621SBSATBD TBDTBD
LRHSecurity CamerasLower Tuscarawas Area OH 561621SBSATBD TBDTBD
LRHOffice Security SystemSummersville Dam WV 561621SBSATBD Q12025Q12025
LRHCleaning 2026 - 2030Summersville Dam WV 561720SBSASAP Q12025Q12025
LRHCleaning 2026 - 2030Sutton Lake WV 561720SBSASAP Q22025Q32025
LRHCleaning & Mowing Services ContractMarietta Repair Station OH 561730SBSASAP Q12025Q12025
LRHHerbicide Services ContractScioto Area Office Mt. Sterling OH 561730SBSARFQ Q22025Q22025
LRHHerbicide Services ContractSummersville Dam WV 561730SBSARFQ Q12025Q12025
LRHPark Attendant 2025 - 2029Burnsville Lake WV 561730SBSARFQ Q22025Q22025
LRHMaintenance Service 2025 - 2029Beech Fork Lake WV 561730SBSARFQ Q42024Q12025
LRHMaintenance Service 2025 - 2029Fishtrap Lake KYNTE $2.5M561730SBSARFQ Q12025Q22025
LRHMaintenance Service 2025 - 2029Grayson Lake KY 561730SBSARFQ Q12025Q12025
LRHMaintenance Service 2025 - 2029Beach City and Bolivar Dam OH 561730SBSARFQ Q12025Q12025
LRHMaintenance Service 2026 - 2030Lower Tuscarawas Area OH 561730SBSARFQ Q32025Q42025
LRHMowing & Maintenance 2026 - 2030Delaware Lake OH 561730SBSARFQ Q32025Q42025
LRHMowing & Maintenance 2026 - 2030Paint Creek Lake OH 561730SBSARFQ Q32025Q42025
LRHMowing & Maintenance 2026 - 2030Pikeville Lake KY 561730SBSARFQ Q32025Q42025
LRHMowing and Maintenance 2026 - 2031Alum Creek Dam OH 561730SBSARFQ Q32025Q42025
LRHMCF Waste CallR3F Regional 562111TBDBPA Call TBDTBD
LRHHCF Waste RemovalR3F Regional 562111TBDBPA Call TBDTBD
LRHC2 Waste Removal BPA Call (MRS) - WaterjetR3F Regional 562111TBDBPA Call Q32025Q32025
LRHHCF LRS Hazardous Waste RemovalR3F Regional 562112TBDBPA Call TBDTBD
LRHPark Attendant 2025 - 2029East Lynn Lake WV 721211SBSARFQ Q22025Q22025
LRHPark Attendant - 2025 - 2029John W. Flannagan Dam VA 721211SBSARFQ Q12025Q12025
LRHMCF Crane InspectionR3F Regional 811300TBDBPA Call TBDTBD
LRHMCF New Vendor Pressure Vessel Inspection - NDT Tanknicians L.L.C.R3F Regional 811300TBDBPA TBDTBD
LRHMCF Pressure Vessel InspectionR3F Regional 811300TBDBPA Call TBDTBD
LRHC2 New Lathe Machine Repair & Supply BPA Vendor - Plant Service CompanyR3F Regional 811310TBDBPA TBDTBD
LRHC2 Pump Repair and Inspection BPAsR3F Regional 811310TBDBPA TBDTBD
LRHHCF 10 in Submersible Pump RepairR3F Regional 811310TBDSAP TBDTBD
LRHHCF Fire Safety RepairsR3F Regional 811310TBDSAP TBDTBD
LRHLCF Submersible Pump Repairs 200 HPR3F Regional 811310TBDSAP TBDTBD
LRHMCF 3406 Engine Rebuild - CAT BPAR3F Regional 811310TBDBPA Call TBDTBD
LRHNickajack Cylinder RebuildMarietta Repair Station OH 811310TBDBPA Call TBDTBD
LRHElevator ServiceBluestone Dam WV 811310TBD  Q42024Q42024
LRHC2 New BPA Pool - Dive equipment- purchase- service- & inspectionR3F Regional  TBDBPA TBDTBD
LRHMaterials for Selective Withdrawal PanelAtwood Lake OH  TBD  Q22025Q32025
LRHMonument RehabMuskingam River Area OHBetween $25K and $100K238990SBSARFQ Q22025Q32025
LRHReplace Maintenance GarageDover Dam OHBetween $100K and $500K236220SBSA  Q12025Q12025
LRHRoller Gate Storage areaWinfield Locks and Dam WVTBD TBD  TBDTBD
LRHSommerdale Flagging Services - BPA CallDover Dam OH  TBDBPA Call Q22025Q22025
LRHWater Tower Security FenceBurnsville Lake WV  SBSA  Q22025Q22025
LRHTask Order Cleaning Services FY25Burnsville Lake WV 561720SBSA  Q12025Q12025
LRHTask Order Negotiated WorkSummersville Dam WV 561730TBD  Q12025Q12025
LRHTask Order Sewage/Sludge Service FY25Burnsville Lake WV 561730SBSA  Q12025Q12025
LRHTrash/Debris BoomBurnsville Lake WV 326199SBSA  Q32025Q32025
LRHPontoon DockBurnsville Lake WV  SBSA  Q42025Q42025
LRHPrado Engineering During ConstructionCorona CA 541330UnrestrictedLB MATOCTask OrderQ32025Q42025
LRHPrefab BuildingMarietta Repair Station OH  SBSASAP Q22025Q22025
LRHSewer Sludge DisposalSutton Lake WV 562111TBD  Q22025Q22025
LRHPlayground MaterialBurnsville Lake WV  SBSA  Q42025Q42025
LRHTask Order Dumpster ServicesSummersville Dam WV  SBSA Task OrderQ12025Q12025
LRHTask Order Cleaning Services FY25Summersville Dam WV 561720SBSA Task OrderQ12025Q12025
LRHTask Order Dumpster Services FY25Burnsville Lake WV  SBSA Task OrderQ12025Q12025
LRHTask Order Mowing FY25Summersville Dam WV 561730SBSA Task OrderQ12025Q12025
LRHTask Order Mowing Services FY 25Burnsville Lake WV 561730SBSA Task OrderQ12025Q12025
LRHTask Order Park Attendant FY25Summersville Dam WV 721211SBSA Task OrderQ12025Q12025
LRHTask Order Park Attendant FY25Burnsville Lake WV 721211SBSA Task OrderQ22025Q22025
LRHWaterway SignageCapt. Anthony Meldahl L&D OH  SBSA  Q12025Q12025
LRHLondon Pierhouse RoofingLondon Locks and Dam WVBetween $1M and $5M238160SBSASB MATOCTask OrderQ12025Q22025
LRHLower Mud River FRM ProjectMilton WVTBD237990UnrestrictedTBDTBDQ12026Q42026
LRHMarmet Service Bridge and Pier 3 RehabMarmet Locks and Dam WVBetween $5M and $10M237990SBSAIFB 1Q20252Q2025
LRHFlap Gate #6 & Roller Gate FabricationWinfield Locks and Dam WV 332312Unrestricted  1Q20252Q2025
LRHMiter GateGreenup Locks and Dam KY 332312SBSA  Q12025Q22025
LRHReplace US & DS Dogging BeamCapt. Anthony Meldahl L&D OH 331221SBSA  Q12025Q22025
LRHRelief Well Engineering A/EHuntington District 541330SBSA  Q12025Q32025
LRHLimited GeoTech A/EHuntington DistrictNTE $45M541330UnrestrictedNew SATOCIDIQQ12025Q32025
LRHEngineering & Construction Services A/EHuntington DistrictTBD541330UnrestrictedNew SATOCIDIQQ32025Q22026
LRHInland Nav/Planning Services A/EHuntington DistrictNTE $15M541330SBSANew SATOCIDIQQ32025Q22026
LRHDam Safety Design A/EHuntington DistrictNTE $20M (shared)541330SBSANew MATOCIDIQQ22025Q42025
LRHHTRW A/EHuntington DistrictNTE $3M541330SBSANew SATOCIDIQQ22026Q42026
LRHCranesnest Access Road PavingJohn W. Flannagan Dam VABetween $500K and $1M237310SBSAIFB Q32025Q32025
LRHPound River Access Road PavingJohn W. Flannagan Dam VABetween $1M and $5M237990SBSASB MATOCTask OrderQ12025Q22025
LRLRenovate Aircrew Readiness Facility / BAEY234305CB Aircrew Readiness FacilityBeale AFB (California)Between $5M and $10M236220Small Business Set AsideIFBAE Design Bid BuildFY25 Q3FY25 Q4
LRLPreservation of The Force & Family (POTFF)Davis Monthan Air Force Base (Arizona)Between $5M - $10M236220Small Business Set AsideN/AAE Design Bid BuildFY25 Q2FY25 Q3
LRLAdd Repair Component Medical Training Facility B3120Eglin AFB (Florida)Between $1M and $5M236220Small Business Set AsideSE MATOCAE Design Bid BuildFY25 Q2FY25 Q3
LRLIndoor Small Arms RangeGrissom Air Force Base (Indiana)Between $25M and $100M236220UnrestrictedN/AAE Design Bid BuildFY25 Q1FY25 Q3
LRLKC-46 Two-Bay Maintenance/Fuel Cell Hangar and Add/Alt Bldg 1244 FUT/Cargo Pallet Staging / Repair Ramp Mooring PointsMarch Air Force Base (California)Between $100M and $250M236220UnrestrictedN/AAE Design Bid BuildFY24 Q4FY25 Q4
LRLKC-46A Alter Bldg 2245 Squad OpsMarch Air Force Base (California)Between $1M and $5M236220TBDN/AAE Design Bid BuildFY25 Q3FY25 Q4
LRLB2303 Repair Admin Area (Aero Repair)- Alter B2320 Hydraulics/Boom Shop- Alter B2327 Battery ShopMarch Air Force Base (California)Between $5M and $10M236220TBDN/AAE Design Bid BuildFY25 Q3FY25 Q4
LRLAdd/Alt Bldg 600 for KC46 Flight SimulatorMarch Air Force Base (California)Between $5M and $10M236220TBDN/AAE Design Bid BuildFY25 Q3FY25 Q4
LRLConstruct Addition and Renovation EOD Fac B750Minneapolis St. Paul JAP (Minnesota)Between $1M and $5M236220TBDN/AAE Design Bid BuildFY25 Q3FY25 Q4
LRLConstruct Addition and Renovate AGE FAC B820Minneapolis St. Paul JAP (Minnesota)Between $1M and $5M236220TBDN/AAE Design Bid BuildFY25 Q3FY25 Q4
LRLBOWST Addition B321 & Alter Flight SimulatorNiagara Falls ARS (New York)Between $5M and $10M236220Small Business Set AsideN/AAE Design Bid BuildFY25 Q3FY25 Q4
LRLCombined Operations FacilityNiagara Falls ARS (New York)Between $25M and $100M236220TBDNAAE Design Bid BuildFY26FY26
LRLTaxiway Golf ExtensionWestover Air Force Base (Massachusetts)Between $25M and $100M236220TBDN/AAE Design Bid BuildFY27FY27
LRLAerospace Gound Equipment Maintenance FacilityJoint Base San Antonio (Texas)Between $10M and $25M236220TBDN/AIn-House Design BuildFY26FY26
LRLAeromedical Evacuation FacilityJoint Base Charleston (South Carolina)Between $10M and $25M236220TBDN/AIn-House Design BuildFY28FY28
LRLConstruct 512th Operations Group ComplexDover Air Force Base (Delaware)Between $25M and $100M236220TBDN/AAE Design Bid BuildFY26 Q3FY26 Q4
LRLConstruct/Renovate for 414 FG & 307 FS- Bldg 4517Seymour Johnson AFB (North Carolina)Between $1M and $5M236220TBDN/AAE Design Bid BuildFY25 Q3FY25 Q4
LRLRepair Aircraft Arresting Systems- Restripe RunwayHomestead AFB (Florida)Between $5M and $10M236220TBDN/AAE Design Bid BuildFY25 Q3FY25 Q4
LRLRenovate Building 7087- Phase III and IVWestover Air Force Base (Massachusetts)Between $5M and $10M236220Small Business Set AsideN/AAE Design Bid BuildFY25 Q2FY25 Q3
LRLBase Fire StationYoungstown (Ohio)Between $10M and $25M236220UnrestrictedN/AAE Design Bid BuildFY25 Q2FY25 Q3
LRLRepair Aircraft Arresting Systems- Restripe RunwayHomestead Air Force Base (Florida)Between $5M and $10M236220TBDN/AAE Design Bid BuildFY25 Q3FY25 Q4
LRLAeromedical Evacaution FacilityJoint Base Charleston (South Carolina)Between $25M and $100M236220TBDN/AAE Design Bid BuildFY28FY28
LRLAerospace Ground Equipment Maintenance FacilityLackland Air Force Base (New Jersey)Between $10M and $25M236220TBDN/AIn House Design Bid BuildFY26FY26
LRLRenovate and Construct Addition to Comms FacilityNiagara Falls ARS (New York)Between $1M and $5M236220TBDN/AAE Design Bid BuildFY25 Q4FY26 Q1
LRLArea Maintenance Support Center(San Tan Valley) Phoenix (Arizona)Between $10M and $25M236220UnrestrictedN/AAE Design Bid BuildFY25 Q1FY25 Q3
LRLArmy Reserve CenterBirmingham (Alabama)Between $25M and $100M236220UnrestrictedN/AAE Design Bid BuildFY25 Q3FY26 Q1
LRLAdvanced Skills Training BarracksCamp Parks (California)Between $25M and $100M236220TBDN/AAE Design Bid BuildFY25 Q2FY25 Q3
LRLArea Maintenance Support Activity / VMSDefense Supply Center Richmond (Virginia)Between $10M and $25M236220UnrestrictedN/AAE Design Bid BuildFY25 Q3FY25 Q4
LRLRenovate/Repair Army Reserve Center and Area Maintenance Support ActivitySacramento (California)Between $25M and $100M236220Small Business Set AsideN/ADesign BuildFY25 Q4FY25 Q4
LRLCollective Training Enlisted BarracksDevens (Massachusetts)Between $25M and $100M236220UnrestrictedN/ADesign Bid BuildFY25 Q2FY25 Q3
LRLArmy Reserve CenterDobbins Air Force Base (Georgia)Between $25M and $100M236220UnrestrictedN/AIn-House Design Bid BuildFY25 Q3FY25 Q4
LRLInstitutional Training Unaccompanied HousingFort Buchanan (Puerto Rico)Between $25M and $100M236220TBDN/AAE Design Bid BuildFY25 Q3FY25 Q4
LRLMultipurpose Athletic Field - Army CombatFort McCoy (Wisconsin)Between $5M and $10M236220TBDN/AAE Design Bid BuildFY28FY28
LRLArea Maintenance Support ActivityFort Sheridan (Illinois)Between $25M and $100M236220TBDN/AIn-House Design Bid BuildFY31FY31
LRLVehicle Maintenance ShopManitowoc (Wisconsin)Between $10M and $25M236220TBDN/AAE Design Bid BuildFY26 Q4FY27 Q1
LRLArea Maintenance Support ActivityNew Castle (Pennsylvania)Between $10M and $25M236220TBDN/AAE Design Bid BuildFY25 Q4FY26 Q1
LRLArea Maintenance Support Activity EquipmentWilkes Barre (Pennsylvania)Between $10 and $25M236220UnrestrictedN/AAE Design Bid BuildFY24 Q4FY25 Q2
LRLArea Maintenance Support ActivityPatton USARC (California)Between $25M and $100M236220TBDN/AAE Design Bid BuildFY29FY29
LRLVertical Skills Training FacilityJoint Base McGuire-Dix-Lakehurst (New Jersey)Between $10M and $25M236220Small Business Set AsideN/AAE Design Bid BuildFY25 Q1FY25 Q3
LRLAviation Support Facility HangerFort Knox (Kentucky)Between $100M and $250M236220UnrestrictedN/AAE Design Bid BuildFY26 Q2FY26 Q4
LRLArea Maintenance Support ActivityJoint Base Elmendorf-Richardson (Alaska)Between $10M and $25M236220TBDN/AIn-House Design Bid BuildFY31FY31
LRLCollective Training Enlisted BarracksCamp Parks (California)Between $25M and $100M236220TBDN/AAE Design BuildFY27FY27
LRLAdvanced Skills Training BarracksCamp Parks (California)Between $25M and $100M236220TBDN/AAE Design BuildFY28FY28
LRLVehicle Maintenance ShopTonganoixie (Kansas)Between $10M and $25M236220TBDN/AAE Design BuildFY26FY26
LRLAirborne Equipment Parachute Repair ShopPatton USARC (California)Between $10M and $25M236220TBDN/AAE Design Bid BuildFY28FY28
LRLModernization of General Instruction BuildingFort Huachuca (Arizona)Between $5M and $10M236220TBDN/ATBDFY25 Q3FY25 Q4
LRLMetro Louisville Pump Stations- Walls & Assoc. FeaturesMetro Louisville (Kentucky)Between $25M and $100M236220TBDTBDTBDTBDTBD
LRLJohnson County Flood Warning & Emergency Evacuation PlanPaintsville (Kentucky)Between $5M and $10M236220TBDTBDTBDTBDTBD
LRLJohnson County Levees & FloodwallsPaintsville (Kentucky)Between $25M and $100M236220TBDTBDTBDTBDTBD
LRLDam Outlet works & Cutoff Wall Phase 2Rough River Dam (Kentucky)Between $250M and $500M237990UnrestrictedTBDDesign Bid BuildFY25 Q1FY25 Q4
LRLDemolition of 2 Buildings(DSCC) Columbus (Ohio)Between $1M and $5M236220TBDN/AAE Design BuildFY25 Q4FY26
LRLReplacing Switch Gears for DFAS(DSCC) Columbus (Ohio)Between $1M and $5M236220TBDN/AAE Design BuildFY25 Q2FY25 Q3
LRLCarpet Replacement Building 21(DSCC) Columbus (Ohio)Between $1M and $5M236220TBDN/AAE Design BuildFY25 Q2FY25 Q3
LRLB3659 Composites Engr Innovation CtrCrane (Indiana)Between $1M and $5M236220Small Business Set AsideN/AIn House Design BuildFY25 Q3FY25 Q4
LRLBuilding 143 Renovate Bays 1 & 3Crane (Indiana)Between $1M and $5M236220TBDN/AAE Design Bid BuildFY26 Q4FY27 Q1
LRLB3748 Trusted Microelectronic Assurance CenterCrane (Indiana)Between $5M and $10M236220TBDN/AAE Design Bid BuildFY26 Q2FY26 Q4
LRLPyrotechnic Production FacilityCrane (Indiana)Between $25M and $100M236220TBDN/AAE Design Bid BuildFY26 Q1FY26 Q4
LRLVirtualized Electro Warfare & Mission Eng. CenterCrane (Indiana)Between $5M and $10M236220TBDN/AAE Design Bid BuildFY26 Q2FY26 Q4
LRLShipboard/Ground Systems LabCrane (Indiana)Between $25M and $100M236220TBDN/AAE Design Bid BuildFY27 Q2FY27 Q4
LRLB-198 HVAC- Chillers- and MAUCrane (Indiana)Between $1M and $5M236220TBDN/AAE Design Bid BuildFY25 Q3FY26 Q1
LRLUnmanned Fusion Warfare LaboratoryCrane (Indiana)Between $5M and $10M236220TBDN/AAE Design Bid BuildFY26 Q3FY27 Q2
LRLDTA PEO Bldg. 231 1st Floor RenovationDetroit Arsenal (Michigan)Between $10M and $25M236220TBDN/AAE Design Bid BuildFY25 Q3FY25 Q4
LRLManned/Unmanned Tactical Vehicle LabDetroit Arsenal (Michigan)Between $25M and $100M236220UnrestrictedN/AAE Design Bid BuildFY25 Q1FY25 Q3
LRLMulitpurpose Training RangeFort Campbell (Kentucky)Between $25M and $100M236220UnrestrictedN/AAE Design Bid BuildFY25 Q1FY25 Q2
LRLAutomated Record Fire RangeFort Campbell (Kentucky)Between $10M and $25M236220TBDN/AIn House Design Bid BuildFY25 Q4FY26
LRLRectifier ReplacementFort Campbell (Kentucky)Between $5M and $10M236220TBDMATOCAE Design BuildFY25 Q1FY25 Q2
LRLMahaffey MS Relocatable RemovalFort Campbell (Kentucky)Between $1M and $5M236220TBDN/AAE Design BuildFY25 Q1FY25 Q2
LRLConsolidated Housing Furniture StorageFort Campbell (Kentucky)Between $1M and $5M236220UnrestrictedN/ADesign BuildFY25 Q1FY25 Q2
LRLRenovate Building 7214 HangarFort Campbell (Kentucky)Between $10M and $25M236220TBDN/AAE Design Bid BuildFY25 Q1FY25 Q3
LRLAmbulatory Care CenterFort Campbell (Kentucky)Between $25M and $100M236220TBDN/AAE Design Bid BuildTBDTBD
LRLAir Traffic Control TowerFort Campbell (Kentucky)Between $25M and $100M236220TBDN/AAE Design BuildFY27 Q1FY27 Q2
LRLBarracksFort Campbell (Kentucky)Between $25M and $100M236220TBDN/AIn House Design BuildFY26 Q1FY26 Q4
LRLRenovate Building 3069 Child Development CenterFort Campbell (Kentucky)Between $10M and $25M236220TBDN/AAE Design BuildFY25 Q2FY25 Q3
LRLScott Middle SchoolFort Knox (Kentucky)Between $25M and $100M236220TBDN/AAE Design Bid BuildFY26 Q1FY26 Q2
LRLIIS Lex- KY Forage Animal Production Research UnitLexington (Kentucky)Between $25M and $100M236220UnrestrictedN/AAE Design Bid BuildTBDTBD
LRLCyber Repair MaintenanceMansfield (Illinois)Between $25M and $100M236220TBDN/AAE Design Bid BuildFY25 Q2FY25 Q4
LRLConstruct Small Arms RangeRickenbacker (Ohio)Between $5M and $10M236220Small Business Set AsideN/AAE Design Bid BuildFY25 Q2FY25 Q3
LRLChild Development CenterRock Island Arsenal (Illinois)Between $25M and $100M236220TBDN/AAE Design BuildFY25 Q2FY25 Q3
LRLEmergency Exit Stairs Towers Bldg 390Rock Island Arsenal (Illinois)Between $5M and $10M236220Small Business Set AsideN/AAE Design Bid BuildTBDTBD
LRLRepair Fire Suppression Systems (Multiple facilities)Rock Island Arsenal (Illinois)Between $5M and $10M236220TBDNAAE Design Bid BuildFY25 Q2FY25Q4
LRLSubstation A ModernizationRock Island Arsenal (Illinois)Between $5M and $10M236220Small Business Set AsideN/AAE Design Bid BuildFY26 Q2FY26 Q4
LRLTransmission Line ModernizationRock Island Arsenal (Illinois)Between $25M and $100M236220TBDNAAE Design Bid BuildFY26 Q2FY26 Q4
LRLIndiana ANG Indoor Small Arms RangeTerre Haute (Indiana)Between $5M and $10M236220Small Business Set AsideNortheast MATOCAE Design BuildFY25 TBDFY25 TBD
LRLWPAFB 3rd Air Stream at Research Cell B18 ComplexWright Patterson Air Force Base (Ohio)Between $5M and $10M236220TBDN/AAE Design Bid BuildFY25 Q3TBD
LRLHPW HVAC RenovationsWright Patterson Air Force Base (Ohio)Between $5M and $10M236220TBDN/AAE Design Bid BuildFY25 Q2FY25 Q4
LRLNAMRU-D Construct Lab Support Bldg - B900Wright Patterson Air Force Base (Ohio)Between $5M and $10M236220UnrestrictedN/AAE Design Bid BuildFY25 Q2FY25 Q4
LRLHuman Performance LabWright Patterson Air Force Base (Ohio)Between $25M and $100M236220TBDN/AAE Design Bid BuildFY26 Q3FY26 Q4
LRLAcquisition Management Complex- VWright Patterson Air Force Base (Ohio)Between $100M and $250M236220TBDN/AAE Design Bid BuildFY26 Q3FY26 Q4
LRL10 MW Dual Fuel Generator/MicrogridAberdeen Proving Ground (Maryland)Between $25M and $100M237130TBDN/AAE Design BuildFY25 Q4FY25 Q4
LRLBuild Microgrid with Spinning Generation AAnniston Army Depot (Alabama)Between $25M and $100M237130SDVOSBN/AAE Design Bid BuildFY25 Q1FY25 Q1
LRLPower Generation and MicrogridBelgiumBetween $25M and $100M237130TBDN/AAE Design Bid BuildFY26 Q2FY26 Q4
LRLElectric Power- PhotovoltaicCamp Roberts (California)Between $25M and $100M237130TBDN/AAE Design Bid BuildFY27 Q1FY27 Q1
LRLConroe RC Install Microgrid / PV / BESS & GeneratorConroe (Texas)Between $10M and $25M237130UnrestrictedN/AAE Design Bid BuildFY25 Q3FY25 Q4
LRLZone 1 Pad17 Hybrid MicrogridCamp Buehring (Kuwait)Between $10M and $25M237130TBDN/AAE Design Bid BuildFY25 Q3FY25 Q4
LRLMicrogrid System - Mobility (Railhead) AreaFort Bliss (Texas)Between $5M and $10M237130TBDN/AAE Design Bid BuildFY27 Q1FY27 Q1
LRLDPTMS Simulation Training Campus MicrogridFort Bliss (Texas)Between $5M and $10M237130TBDN/AAE Design Bid BuildFY26 Q1FY26 Q1
LRLMicrogrid - McGregor / WestbrookFort Bliss (Texas)Between $10M and $25M237130TBDN/AAE Design Bid BuildFY28 Q1FY28 Q1
LRL5 MW NG Generator Microgrid - EastFort Bliss (Texas)Between $10M and $25M237130TBDN/AAE Design Bid BuildFY28 Q1FY28 Q1
LRLInstallation Level MicrogridFort Buchanan (Puerto Rico)Between $25M and $100M237130TBDN/AAE Design Bid BuildFY25 Q2FY25 Q4
LRLWater Treatment System at Las Casa LakeFort Buchanan (Puerto Rico)Between $10M and $25M237110TBDN/AAE Design Bid BuildFY26 Q1FY26 Q2
LRLElectric Power - Gas FiredFort Cavazos (formerly Fort Hood) (Texas)Between $10M and $25M237130Potential Sole Source to Utility ProviderN/AAE Design Bid BuildFY25TBD
LRLPhantom Warrior Central MicrogridFort Cavazos (formerly Fort Hood) (Texas)Between $25M and $100M237130Potential Sole Source to Utility ProviderN/AAE Design Bid BuildFY25TBD
LRLWater Supply Treatment Building - PotableFort Liberty (formerly Ft. Bragg) (North Carolina)Between $10M and $25M237110Sole Source to Utility ProviderN/AIn House Design BuildFY25TBD
LRLElectric Power - Gas FiredFort Riley (Kansas)Between $25M and $100M237130Sole Source to Utility ProviderN/AAE Design Bid BuildFY25FY25
LRLConstruct 10MW Microgrid Utilizing ExistinFort Liberty (formerly Ft. Bragg) (North Carolina)Between $25M and $100M237130Sole Source to Utility ProviderN/AAE Design Bid BuildFY25 Q3FY25 Q4
LRLEmergency Diesel MicrogridFort Liberty (formerly Ft. Bragg) (North Carolina)Between $5M and $10M237130Sole Source to Utility ProviderN/AAE Design Bid BuildFY25FY25
LRLElectric Power - Gas FiredFort Stewart (Georgia)Between $25M and $100M237130Potential Sole Source to Utility ProviderN/AAE Design Bid BuildTBDTBD
LRLWater Distribution Lines- PotableHawthorne (Nevada)Between $5M and $10M237130TBDN/AAE Design Bid BuildFY25 Q3FY25 Q4
LRLYTC MicrogridJoint Base Lewis-McChord (Washington)Between $25M and $100M237130Potential Sole Source to Utility ProviderN/AAE Design Bid BuildFY26 Q1FY26 Q1
LRLBuild 2.5 MW Microgrid for Gray Army AirfieldJoint Base Lewis-McChord (Washington)Between $25M and $100M237130Potential Sole Source to Utility ProviderN/AAE Design Bid BuildFY25FY25
LRLAAP 15 MW NG CHP MicrogridLake City Army Ammo Plant (Missouri)Between $25M and $100M237130TBDN/AIn House Design BuildFY25 Q2FY25 Q3
LRLElectric Power- PhotovoltaicParks RFTA (California)Between $25M and $100M237130TBDN/AAE Design Bid BuildTBDTBD
LRLElectric Power- PhotovoltaicRedstone Arsenal (Alabama)Between $25M and $100M237130TBDN/AAE Design Bid BuildFY25 Q2FY25 Q4
LRLBuild 15 MW Microgrid with 10 MW New NG RIRock Island Arsenal (Illinois)Between $25M and $100M237130TBDN/AAE Design Bid BuildFY25 Q3FY25 Q4
LRLMain Potable Water Lines for ResilienceTooele Army Depot (Utah)Between $10M and $25M237110TBDN/AAE Design Bid BuildFY25 Q3FY25 Q4
LRLElectric Power - PhotovoltaicWhite Sands Missile Range (New Mexico)Between $10M and $25M237130UnrestrictedN/AAE Design Bid BuildFY26 Q2FY26 Q4
LRLSolar Panels InstallationCamp Carroll (Korea)Between $10M and $25M237130TBDN/AAE Design Bid BuildTBDTBD
LRLBuild 2.5 MW Microgrid for Gray Army AirfieldJoint Base Lewis-McChord (Washington)Between $25M and $100M237130Potential Sole Source to Utility ProviderN/AAE Design Bid BuildFY25FY25
LRLARTC Microgrid 14 Generator Consol 700kW SolarCp Buehring (Kuwait)Between $25M and $100M237130UnrestrictedN/AAE Design Bid BuildFY25 Q3FY25 Q4
LRLERCIP WPAFB District Cooling PlantWright Patterson Air Force Base (Ohio)Between $25M and $100M237130TBDN/AAE Design Bid BuildFY25 Q4FY25 Q4
LRLElectric Power Gas Fired MicrogridFort Sill (Oklahoma)Between $100M and $250M237130TBDN/AAE Design Bid BuildFY25 Q4FY25 Q4
LRLInstall Microgrid- PV- Battery Energy StorageKatterbach (Germany)Between $25M and $100M237130TBDN/AA/E Design Bid BuildFY27 Q1FY27 Q1
LRLStilling Basin Repair & DewateringCaesar Creek Lake (Ohio)Between $500K and $1M237990TBDTBDTBDFY25 Q2FY25 Q2
LRLRepair Emergency and Service Gate Lips and SealsCaesar Creek Lake (Ohio)Between $500K and $1M237990TBDTBDTBDFY25 Q4FY25 Q4
LRLTower Bridge Painting & Bridge Deck ReplacementCagles Mill Lake (Indiana)Between $500K and $1M237990TBDMATOC Task OrderRFPFY25 Q2FY25 Q2
LRLCulvert ValveCannelton Lock & Dam (Indiana)Between $5M and $10M237990TBDTBDTBDFY26 Q1FY26 Q1
LRLFixed Weir RepairCannelton Lock & Dam (Indiana)Between $250K and $500K237990TBDTBDTBDFY25 Q2FY25 Q2
LRLRepair and Replace Lock ControlsCannelton Lock & Dam (Indiana)Between $500K and $1M237990TBDTBDTBDFY25 Q3FY25 Q3
LRLTainter Gate Cable Connection ReplacementJT Myer Lock & Dam (Indiana)Between $1M and $5M237990TBDTBDTBDFY26 Q4FY26 Q4
LRLMiter Gate FabricationMarkland Lock & Dam (Kentucky)Between $10M & $25M237990TBDTBDTBDFY25 Q2FY25 Q3
LRLTainter Fate #1 FabricationMcAlpine Lock & Dam (Kentucky)Between $10M and $25M237990TBDTBDTBDFY26 Q2FY26 Q3
LRLReplace Culvert ValvesMcAlpine Lock & Dam (Kentucky)Between $1M and $5M237990TBDMATOC Task OrderRFPFY25FY25
LRLRemove and Repair Service GatesMonroe Lake (Indiana)Between $1M and $5M237990TBDMATOC Task OrderRFPFY25 Q4FY25 Q4
LRLNolin HoistNolin River Lake (Kentucky)Between $500K and $1M237990TBDTBDTBDFY25 Q2FY25 Q3
LRLInstall Articulated BlockPatoka Lake (Indiana)Between $500K and $1M237990TBDTBDTBDFY25 Q2FY25 Q2
LRLMultilevel Intake and Hydraulic System RepairsPatoka Lake (Indiana)Between $250K and $500K237990TBDTBDTBDFY25 Q3FY25 Q3
LRLR3F Lock Maintenance BulkheadsRegional Rivers Repair FleetBetween $10M and $25M237900TBDTBDTBDFY25 Q4FY25 Q4
LRLSewage Treatment Plant ReplacementRough River Lake (Kentucky)Between $500K and $1M237990TBDTBDTBDFY25FY25
LRLTraining Wall Drain GutterWest Fork Lake (Ohio)Between $250K and $500K237990TDBTBDTBDFY25FY26
LRLERCIP MATOCNationwide$2B Shared Capacity237130Unrestricted with Small Business Reserve  FY24 Q4FY25 Q4
LRLA/E Environmental MATOC $200M Shared Capacity541330Anticipate Unrestricted with SB Reserve  FY26 Q3FY25/26
LRLMilitary Construction MATOC $240M Shared Capacity236220Small Business Set Aside Design BuildFY25 Q2FY25 Q4
LRLMilitary Construction MATOC $200M Shared Capacity236220HubZone Design BuildFY25 Q3FY25 Q4
LRLMilitary Construction MATOC $160M Shared Capacity236220SDVOSB Design Bid BuildFY25 Q2FY25 Q4
LRLA/E Air Force Reserve MATOC $150M Shared Capacity541330Unrestricted with Small Business Reserve  FY25 Q3FY25 Q4
LRLEnvironmental Heavy Metals MATOC $245M Shared Capacity562910Unrestricted  FY25 Q1FY25 Q3
LRLEnvironmental Optimization (AE Svcs)Scott AFB$25M (SATOC)541330Small Business Set Aside  FY25 Q2FY25 Q4
LRLBureau of Prisons New FacilityLetcher County- KY$150M (SATOC)541330TBD  FY25 Q3FY25 Q4
LRLRisk Management Center Horizontal Design and Existing Condition Expert ReviewsNationwide$75M541330Unrestricted with a Small Business Reserve  FY25 Q3FY25 Q4
LRNWolf Creek GSU TransformerJamestown (Kentucky)$10M-$25M335311UnrestrictedNARFPQ4FY24FY25
LRNChickamauga Lock Approach Wall and DecommissioningChattanooga (Tennessee)$250M-$500M237990UnrestrictedNARFPQ2FY25Q4FY25
LRNWolf Creek Bridge Crane RehabJamestown (Kentucky)$5M-$10M333923TBDLRN Crane MATOCTask OrderFY25FY25
LRNCheatham Intake Crane ReplacementAshland City (Tennessee)$10M-$25M333923TBDLRN Crane MATOCTask OrderFY25FY25
LRNCordell Hull Powerhouse Crane - Rehabilitate powerhouse craneCarthage (Tennessee)TBD333923TBDLRN Crane MATOCTask OrderFY26FY26
LRNFt. Loudoun and Watts Bar- Lock Ladder Install - Lock ladder installlation to meet the USACE safety manual requirements (EM 35-1-20) as well as OSHA standards.Lenoir City and Spring City (Tennessee)$1M-$5MTBDTBDTBDTBDFY26FY26
LRNCordell Hull Phase II- Carthage- TN Streambank Stabilization - Stabilization of riverbank along Cumberland River at the Carthage WWTPCarthage (Tennessee)$1M-$5M237990Total Small Business Set AsideLRN Stabilization MATOCTask OrderFY25FY25
LRNEast Camp Creek Flood Risk Reduction - Construction of a detention structure to reduce flooding throughout downtown Gallatin areaGallatin (Tennessee)$1M-$5M237990Total Small Business Set AsideLRN Stabilization MATOCTask OrderFY25FY25
LRNNickajack Two (2) new low speed gear boxesJasper (Tennessee)over SAT333612Small Business Set AsideNASAPFY26FY26
LRNBrewster Road Repair - Roadway StabilizationBig South Fork (Tennessee)$500K-$1M237990Total Small Business Set AsideLRN Stabilization MATOCTask OrderFY25FY25
LRNBlount Ave: Mouse Creek/Cleveland - Channel ModificationCleveland (Tennessee)$250K-$500K237990Small Business Set AsideNAIFBQ4FY25Q1FY26
LRNWilliams St. Detention: Mouse Creek/Cleveland - Detention StructureCleveland (Tennessee)$500K-$1M237990Small Business Set AsideNAIFBQ4FY25Q2FY26
LRNWolf Creek Turbine Generator Rehab - Rewind 4 units- replace 6 turbines with auto-ventingJamestown (Kentucky)$100M-$250M237990UnrestrictedNARFPFY26FY27
LRNJ. Percy Priest Exciter ReplacementNashville (Tennessee)$1M-$5M237130UnrestrictedLRN Excitation SATOCTask OrderFY25FY26
LRNLee County Sewer Improvements - Phase 1AJonesville (Virginia)$25M-$100MTBDTBDNARFPTBDTBD
LRNJ. Percy Priest DC Systems and Preferred AC Systems - Replace DC and Preferred ACSystemsNashville (Tennessee)$1M-$5MTBDTBDNARFPTBDFY26
LRNCheatham ExcitationAshland City (Tennessee)TBD237130UnrestrictedLRN Excitation SATOCTask OrderTBDFY26
LRNOld Hickory Planting and Landscaping (Tornado Recovery) - Restore vegetative cover (trees- shrubs- grass)Hendersonville (Tennessee)$1M-$5MTBDSmall Business Set AsideNAIFBTBDFY25
LRNWolf Creek Mill Springs Mill RestorationMills Springs (Kentucky)over SATTBDTBDTBDTBDTBDQ4FY25
LRNDredging Post Oak and LooneyPost Oak Island and Looney Island (Tennessee)$1M-$5MTBDTBDLRH Regional Dredging MATOCTask OrderTBDFY25
LRNSevier Co. PAS - H&H Modeling for Sevier Co.Sevier County (Tennessee)over SATTBDUnrestrictedH&H MATOCTask OrderTBDFY25
LRNRegional Court Reporter BPAChatanooga (Tennessee)under SATTBDSmall Business Set AsideN/ATBDFY25FY25
LRNBarkley GeophysicsGrand Rivers (Kentucky)under SATTBDSmall Business Set AsideN/ATBDFY25FY25
LRNCT test sets for ESSTennesseeunder SATTBDSmall Business Set AsideN/ATBDFY25FY25
LRN3-Phase Test Set- purchase for ESSTennesseeunder SATTBDSmall Business Set AsideN/ATBDFY25FY25
LRNSCADA Miscellaneous PartsNashville (Tennesee)under SATTBDSmall Business Set AsideN/ATBDFY25FY25
LRNKentucky Lock Wall Armor PurchaseGrand Rivers (Kentucky)under SATTBDSmall Business Set AsideN/ATBDFY25FY25
LRNOps- MST-Broaderson Crane PurchaseTennesseeunder SATTBDSmall Business Set AsideN/ATBDFY25FY25
LRNOps- MST - pump and piping purchaseTennesseeunder SATTBDSmall Business Set AsideN/ATBDFY25FY25
LRNWolf Creek- mower purchase (2)Jamestown (Kentucky)under SATTBDSmall Business Set AsideN/ATBDFY25FY25
LRNBarkley Hydro- Generator Governor Rebuild PartsClarksville (Tennessee)under SATTBDSmall Business Set AsideN/ATBDFY25FY25
LRNDale Hollow- Drain LineKnoxville (Tennessee)under SATTBDSmall Business Set AsideN/ATBDFY25FY25
LRNWheeler Lower Gate FendersRogersville (Alabama)under SATTBDSmall Business Set AsideN/ATBDFY25FY25
LRNWheeler Lock- New shop doors w/ incidental installRogersville (Alabama)under SATTBDSmall Business Set AsideN/ATBDFY25FY25
LRNWilson Lock- New shop doors w/ incidental installFlorence (Alabama)under SATTBDSmall Business Set AsideN/ATBDFY25FY25
LRNArc Flash Protective GearTBDunder SATTBDSmall Business Set AsideN/ATBDFY25FY25
LRNWilson Lock upper gate sealFlorence (Alabama)under SATTBDSmall Business Set AsideN/ATBDFY25FY25
LRNPickwick Aux Lock- Segmental Valve- Top SealsCounce (Tennessee)under SATTBDSmall Business Set AsideN/ATBDFY25FY25
LRNChannels - Purchase a new smaller size boatTBDunder SATTBDSmall Business Set AsideN/ATBDFY25FY25
LRNTMDE CalibrationTennesseeunder SATTBDSmall Business Set AsideN/ATBDFY25FY25
LRNWolf Creek- New Playground and InstallJamestown (Kentucky)under SATTBDSmall Business Set AsideN/ATBDFY25FY25
LRNFY25 New Park AttendantsTennesseeunder SATTBDSmall Business Set AsideN/ATBDFY25FY25
LRNMartin's Fork- Crane RentalKnoxville (Tennessee)under SATTBDSmall Business Set AsideN/ATBDFY25FY25
LRNNickajack Lock- Tow Haulage Unit RehabChattanooga (Tennessee)under SATTBDSmall Business Set AsideN/ATBDFY25FY25
LRNBPA's - Elevator InspectionsTennesseeunder SATTBDSmall Business Set AsideN/ATBDFY25FY25
LRNBPA's - Bridge InspectionsTennesseeunder SATTBDSmall Business Set AsideN/ATBDFY25FY25
LRNBarkley Dam- Em. Gate Machinery RepairsClarksville (Tennessee)under SATTBDSmall Business Set AsideN/ATBDFY25FY25
LRNFY26 New Park Attendants LRNTennesseeunder SATTBDSmall Business Set AsideN/ATBDFY26FY26
LRNDale Hollow TQ Security FenceKnoxville (Tennessee)under SATTBDSmall Business Set AsideN/ATBDFY25FY25
LRNBPA- Ops-Lakes- Sunken Vessel RemovalTBDunder SATTBDSmall Business Set AsideN/ATBDFY25FY25
LRNOps- MST Iroquois-Dry Dock- replace engine coolerTBDunder SATTBDSmall Business Set AsideN/ATBDFY25FY25
LRNOld Hickory ESS Building Rehabilitation from tornado damageHendersonville (Tennessee)$10M-$25MTBDSmall Business Set AsideTBDTBDTBDFY26
LRNPAS TN H2OHendersonville (Tennessee)over SATTBDUnrestrictedH&H MATOCTask OrderTBDFY25
LRNOld Hickory turbine generator rehabilitation asbestos abatementHendersonville (Tennessee)under SATTBDSmall Business Set AsideLRN Environmental Services MATOCTask OrderTBDFY25
LRNOld Hickory Toe Drain RemediationHendersonville (Tennessee)$1M-$5MTBDSmall Business Set AsideLRN Stabilization MATOCTask OrderTBDFY25
LRNWatts Bar TVA Ramp. Construct a permanment ramp at Watts Bar to allow river access for TVA Nuclear for the movement of critical equipment via barge to the facility.Spring City (Tennessee)$500K-$1M237990Small Business Set AsideTBDTBDTBDFY26
LRNClaims Consultant. Services for claims consulant associated with Chickamauga Lock construction claims and disputesGrand Rivers (Kentucky) & Chattanooga (Tennessee)over SATTBDTBDN/ASAPTBDFY25
LRNTemporary liquid oxygen system for construction and testing of the diffusion system within the Lake Cumberland reservoir at Wolf Creek Dam.Jamestown (Kentucky)under SATTBDTBDN/ASAPTBDQ2FY25
LRNWolf Creek and Center Hill Instrumentation Survey Phase IIJamestown (Kentucky) & Lancaster (Tennessee)under SATTBDSmall Business Set-AsideGSATask OrderTBDQ2FY25
LRNKentucky Lock Gearbox RepairGrand Rivers (Kentucky)Over SATTBDTBDTBDSAPTBDFY25
LRNDebris Removal Vessel Barges Supply/FabJamestown (Kentucky)Over SAT334411Small Business Set-AsideTBDSAPQ2 FY25FY25
LRNSupply Remote Switch Operator for Nickajack and Chickamauga LocksNewhope (Tennessee) and Chattanooga (Tennessee)Under SATTBDSmall Business Set-AsideTBDSAPQ3 FY25FY25
LRNDumpster Service for Laurel River LakeLondon (Kentucky)Under SATTBDSmall Business Set-AsideTBDSAPQ3 FY25FY25
LRNReal Estate TitlesNashville (Tennessee)Over SATTBDSmall Business Set-AsideBase Purchase Agreement (BPA)SAPQ4 FY25Q1 FY26
LRNReal Estate AppraisalsNashville (Tennessee)Over SATTBDSmall Business Set-AsideBase Purchase Agreement (BPA)SAPQ1 FY26Q2 FY26
LRNMechanical Engineer CMS Support for Chickamauga LockChattanooga (Tennessee)Over SATTBDWOSBLRD AE CMS MATOCTask OrderTBDTBD
LRNH&H Services - WM Water Quality Database UpdatesNashville (Tennessee)Over SATTBDUnrestrictedH&H MATOCTask OrderTBDFY25
LRNDale Hollow Supplies for Site RemediationCelina (Tennessee)Under SATTBDSmall Business Set-AsideTBDSAPQ3 FY25Q3 FY25
LRNCordell Hull O&M RequirementsCarthage (Tennessee)Over SAT561210Small Business Set AsideN/ARFPQ4 FY25Q1 FY26
LRNWilson Lock Ceramic Metal Base and SolidifierFlorence (Alabama)Under SAT Small Business Set AsideN/ASAPQ3 FY25Q3 FY25
LRPSaw Mill Run Local Protection ProjectPittsburgh- Allegheny County- PA$1M and $5M237990Small Business Set-AsideN/AIFBFY25 Q1FY25 Q2
LRPSEC 219 City of Chester Water System ImprovementsChester- Hancock County- WV$1M and $5M237110Small Business Set-AsideN/ARFPFY25 Q1FY25 Q2
LRPIIJA Ohio River - Emsworth Replace Hydraulic Gate CylindersPittsburgh- Allegheny County- PA$5M and $10M237990Unrestricted - Full & OpenN/AIFBFY25 Q1FY25 Q2
LRPDRSAA FY23 AR - Replace Anchor Point Buoys for Safety BoomAllegheny County- PA$100K and $250K238290Unrestricted - Full & OpenConstruction DBB Rivers & Marine MATOC Pool W9123722D0027 - W9123722D0030RFPFY25 Q1FY25 Q1
LRPSEC 219 McMechen WV Storm Water ProjectMcmechen- Marshall County- WV$1M and $5M237110Small Business Set-AsideN/AIFBFY25 Q1FY25 Q2
LRPIIJA Loyalhanna Solar LightsSaltsburg- Westmoreland County- Pa$25K and $100K238210Small Business Set-AsideN/A FY25 Q1FY25 Q2
LRPSEC 219 City of Paden CityPaden City- Tyler and Wetzel Counties- WV$5M and $10M237110Small Business Set-AsideN/AIFBFY25 Q1FY25 Q1
LRPFY22 Dashields Upper Guide Wall Stabilization ProjectCoraopolis- Allegheny County- PA$5M and $10M237990Unrestricted - Full & OpenN/AIFBFY25 Q1FY25 Q2
LRPFY23 MR Maxwell - Repair InterlocksCenterville- Washington and Fayette County- PA$1M and $5M237990Small Business Set-AsideN/AIFBFY25 Q1FY25 Q2
LRPFY24 IIJA Johnstown Sediment Removal Phase 4Johnstown- Cambria County- PA$5M and $10M237990Small Business Set-AsideN/AIFBFY25 Q1FY25 Q2
LRPFY24 Tionesta Construct Bulkhead Hoist Jib PlatformTionesta- Forest County- PA$500K and $1M237990Small Business Set-AsideN/AIFBFY25 Q1FY25 Q2
LRPFY24 OR Hannibal - 4-Corner Hydraulic SystemNew Martinsville- Wetzel County- WV$10M and $25M237990Unrestricted - Full & OpenN/AIFBFY25 Q1FY25 Q2
LRPFY24 Ohio River - DredgingOhio River$1M and $5M237990Unrestricted - Full & OpenRegional Dredging MATOC Pool W9123722D0002 - W9123722D0004RFPFY25 Q2FY25 Q3
LRPFY24 Tygart Replace PLC for Dam Sluice GatesTaylor County- WV$1M and $5M237990Small Business Set-AsideN/AIFBFY25 Q2FY25 Q3
LRPIIJA Berlin Sewage Treatment and Collection SystemMahoning County- Ohio$1M and $5M237110Small Business Set-AsideN/AIFBFY25 Q2FY25 Q3
LRPSEC 219 City of McKeesport - Long Run Watershed ImprovementsMckeesport- Allegheny County- PA$500K and $1M237110Small Business Set-AsideN/AIFBFY25 Q2FY25 Q3
LRPLower Mon 234Elizabeth- PA$10M and $25M237990Unrestricted - Full & OpenN/AIFBFY25 Q2FY25 Q3
LRPFY24 Allegheny River - DredgingAllegheny River$500K and $1M237990Unrestricted - Full & OpenRegional Dredging MATOC Pool W9123722D0002 - W9123722D0004RFPFY25 Q2FY25 Q3
LRPFY24 Monongahela River - DredgingMonongahela River$1M and $5M237990Unrestricted - Full & OpenRegional Dredging MATOC Pool W9123722D0002 - W9123722D0004RFPFY25 Q2FY25 Q3
LRPIIJA & FY23 Conemaugh DredgingSaltsburg- Westmoreland County- Pa$10M and $25M237990Small Business Set-AsideN/AIFBFY25 Q3FY25 Q4
LRPSEC 219 Follansbee- Northern WVFollansbee- Brooke County- WV$1M and $5M237110Small Business Set-AsideN/AIFBFY25 Q1FY25 Q2