Public Review: Grayson Dam Water Control Plan Draft FONSI and EA

Published Sept. 1, 2026
Expiration date: 11/30/2026

The U.S. Army Corps of Engineers Huntington District is updating Grayson Dam’s Water Control Plan to increase the rate of change at the dam’s outflow from 0.5ft/hr to 1ft/hr which would allow for one (1) foot change in stage per hour at the outflow as a result of the dam’s operations. The draft Environmental Assessment and Findings of No Significant Impact are available for public review and comment.