• Hydrographic Surveys (eHydro)

    Access official hydrographic survey data and channel condition reports for USACE navigation projects through the eHydro Dashboard. View survey results, channel depths, and dredging information for all Great Lakes and Ohio River Division waterways. eHydro is the authoritative source for all USACE hydrographic survey data per ER 1110-2-8164.
  • Navigation Charts (IENC)

    Download official Inland Electronic Navigation Charts (IENC) for safe navigation on inland waterways. IENCCloud.us is the only authorized source for USACE navigation charts. Charts are updated regularly and available for free download. Compatible with electronic chart display systems.
  • Notices To Navigation Interests (NTNI) Portal

    View current Notices to Navigation Interests (NTNI) published by the USACE Navigation Data Center. Find information about channel closures, lock and dam status, navigation hazards, chart updates, and dredging operations.
  • Regulatory Request System (RRS) Public Notices

    Search all active permit applications for Section 404 (wetlands), Section 10 (navigable waters), and Section 408 (alterations to USACE projects) in the official Regulatory and Response System (RRS). View permit details, submit comments during public comment periods, and track application status. RRS is the authoritative source for all USACE regulatory permits.
  • Water Management Data (CWMS)

    Access real-time water level data, reservoir operations, water releases, and forecasts for all USACE projects through the Corps Water Management System (CWMS). View current gage readings, historical data, and operational schedules. CWMS is the authoritative source for all USACE water management information per EM 1110-2-3600.
  • Scoping Notice - Cleveland Harbor Preliminary Assessment - Dredged Material Placement

    Expiration date: 2/18/2026

    The purpose of this scoping information is to disseminate information regarding the U.S. Army Corps of Engineers (USACE) development of a preliminary assessment (PA) addendum to address a short-term need for dredged material placement including littoral drift placement of Cleveland Harbor dredged sediment at specific nearshore sites. This information has been prepared as part of the formal scoping process in accordance with Department of Defense National Environmental Policy Act (DoD NEPA) Implementing Procedures. email: clevelandnearshore@usace.army.mil
  • Section 404 Public Notice - Fairport Harbor Nearshore Placement of Dredged Sediment

    Expiration date: 2/23/2026

    Public Notice for nearshore placement of dredged sediment at Fairport Harbor, Lake County, Ohio, pursuant to Section 404(a) of the Clean Water Act and 33 CFR 337.1. The USACE Buffalo District proposes to establish a new nearshore placement area west of Fairport Harbor for 40,000-65,000 cubic yards of coarse-grained sediment. Public comment period: 30 days. Comments due by February 23, 2026.
  • Reissuance of Nationwide Permits (NWPs) for Indiana - Effective March 15, 2026

    Expiration date: 3/15/2031

    The U.S. Army Corps of Engineers announces the reissuance of 56 existing Nationwide Permits (NWPs) and one new NWP, effective March 15, 2026 through March 15, 2031. The 2021 versions of these NWPs expire on March 14, 2026. Regional conditions for Indiana waters will be announced in a future public notice. Federal Register: 91 FR 768.
  • Reissuance of Nationwide Permits (NWPs) for Kentucky - Effective March 15, 2026

    Expiration date: 3/15/2031

    The U.S. Army Corps of Engineers announces the reissuance of 56 existing Nationwide Permits (NWPs) and one new NWP, effective March 15, 2026 through March 15, 2031. The 2021 versions of these NWPs expire on March 14, 2026. Regional conditions for Kentucky waters will be announced in a future public notice. Federal Register: 91 FR 768.
  • Reissuance of Nationwide Permits (NWPs) for Pittsburgh District - Effective March 15, 2026

    Expiration date: 3/15/2031

    The U.S. Army Corps of Engineers announces the reissuance of 56 existing Nationwide Permits (NWPs) and one new NWP, effective March 15, 2026 through March 15, 2031. The 2021 versions of these NWPs expire on March 14, 2026. Regional conditions for waters within Pittsburgh District will be announced in a future public notice. Federal Register: 91 FR 768.

Consolidation of Studies

The Water Resources Development Act establishes a single-phase cost-shared study process that for each feasibility study undertaken, the district engineer will develop a detailed study schedule and notify the non-federal interests.

Overviews of study schedule milestones are posted below.