210709-A-PG036-002
The U.S. Army Corps of Engineers Buffalo District floating plant/repair fleet places stone at the Buffalo Harbor west breakwater for emergency repairs, June 2021. A storm damaged the federal navigation structure on November 15, 2020 storm and removed 40 feet of cap. More damage was sustained over the winter.

Download Image: Full Size (2.35 MB)
Photo by: Jess Levenson |  VIRIN: 210709-A-PG036-002.JPG