Hydropower in Pittsburgh District
The hydropower plant at the Youghiogheny River Lake dam in Confluence, Pennsylvania, is one of nine licensed and operating hydropower facilities located at dams run by the U.S. Army Corps of Engineers Pittsburgh District. The plant provides electricity to approximately 4,000 households. The nine licensed and operating hydropower facilities at Pittsburgh District dams include five at locking facilities on navigable rivers and four at reservoirs. If all nine hydropower plants were to operate at full capacity, they could produce 570 megawatts, enough to power 670,000 households annually. Recently, Rye Development announced they would begin constructing four hydropower plants at lock and dam facilities on the Ohio, Monongahela, and Allegheny rivers. Once construction begins, it can take 24-36 months to complete a facility. The contractor expects each project to generate 150-200 family-wage jobs. In addition to providing renewable energy, the hydropower facility includes investment in new recreational fishing facilities and a walkway leading from a parking area with designated parking spaces to the fishing platform. (U.S. Army Corps of Engineers Pittsburgh District photo by Michel Sauret)

Download Image: Full Size (5.69 MB)
Tags:
Photo by: Michel Sauret |  VIRIN: 230316-A-TI382-0530.JPG
The most recent appropriations for the Department of War expired at 11:59 p.m. EST on September 30, 2025. Military personnel will continue in a normal duty status without pay until such time as a continuing resolution or appropriations are passed by Congress and signed into law. Civilian personnel not engaged in exempted or excepted activities will be placed in a non-work, non-pay status.