Public Review Documents & Approved Review Plans

Results:
Tag: revetment
Clear
  • Preliminary Finding of No Significant Impact and Environmental Assessment for Muskegon Walkway and Revetment Rehabilitation

    Expiration date: 12/8/2023

    The tentatively chosen alternative will consist of excavating critical dunes to create access routes and work and storage areas to remove and replace a concrete walkway. The selected alternative includes 3,000 cubic yards (cyds) of excavated dune sand. The excavated sand will be placed west of the project site along the Lake Michigan shoreline. The proposed project will also include removal and replacement of the existing walkway and grouted stone impacting a 7.5ft wide by 2,300ft long area. The new walkway will include seven curb openings with 20ft-by-20ft turnabouts. The proposed project will also include a temporary access route along the walkway with an average width of 16ft and a maximum width of 24ft. Three (3) work and storage areas with dimensions of 70 feet wide by 150ft long and access and storage areas in the existing parking lot and along the existing concrete walkways. The work period is expected to begin in Summer 2024 and last a full construction season.
Chick Lock

Through deeds, not words, we are BUILDING STRONG®