This project consists of design performed by an Architect-Engineering firm (A-E) and construction of a sea lamprey barrier for the purpose of blocking sea lamprey from upstream migration and subsequent spawning. Project features include construction of a new fixed crest barrier with lamprey traps, removal of an existing concrete flume wall, and construction of a berm upstream of the dam for the purpose of stabilizing the existing training wall, and existing dam superstructure removal.