The Louisville District End of Year Award Ceremony

Media Releases

Filter Media Releases

Contact a Public Affairs Office

Buffalo District
1-800-833-6390 (option 3)
Chicago District
312-846-5330
Detroit District
313-226-4680
Huntington District
304-399-5353
Louisville District
(502) 315-6766
Nashville District
(615) 736-7161
Pittsburgh District
412-395-7502

News Releases

Dale Hollow Dam Road closing for preventative maintenance

U.S. Army Corps of Engineers Nashville District
Published June 5, 2024
The U.S. Army Corps of Engineers Nashville District announces Dale Hollow Dam Road is closing to all traffic across the dam 8 a.m. Monday, June 17 for an extended amount of time for preventative maintenance on and around the roadway.  The dates are subject to change based on contractor schedule. (USACE Photo by Lee Roberts)

The U.S. Army Corps of Engineers Nashville District announces Dale Hollow Dam Road is closing to all traffic across the dam 8 a.m. Monday, June 17 for an extended amount of time for preventative maintenance on and around the roadway. The dates are subject to change based on contractor schedule. (USACE Photo by Lee Roberts)

CELINA, Tenn. (June 5, 2024) – The U.S. Army Corps of Engineers Nashville District announces Dale Hollow Dam Road is closing to all traffic across the dam 8 a.m. Monday, June 17 for an extended amount of time for preventative maintenance on and around the roadway.  The end date is yet to be determined. Dates are subject to change based on contractor schedule.

“This project will involve the refurbishing and repainting of the spillway gates.  We will also be upgrading the spillway controls during this time.  The operation of heavy equipment will also be involved.  The road closure allows personnel the ability to work in the area without hinderance due to vehicle traffic and provides for public safety,” said Stanley Carter, Dale Hollow Dam Powerhouse superintendent.

Pedestrians and bicycle traffic are also not allowed across the dam. The closure provides for the safety of employees while making room for the equipment utilized during the inspection.

During the closure, barriers are being placed at the intersection of Walker Ridge Road and Will Terry Road near the south end of the dam, and another at the Dale Hollow Dam Road/cut through road intersection at the north end of the dam.

Updates will be posted to Dale Hollow Lake’s Facebook page at http://www.facebook.com/dalehollowlake. The public can call the Dale Hollow Dam Powerhouse Office at (931) 243-3136 for more information.

The public can obtain news, updates and information from the U.S. Army Corps of Engineers Nashville District on the district’s website at https://www.lrd.usace.army.mil/About/Districts/Nashville-District/, on Facebook at www.facebook.com/nashvillecorps and on Twitter at www.twitter.com/nashvillecorps. Follow us on LinkedIn for the latest Nashville District employment and contracting opportunities at https://www.linkedin.com/company/u-s-army-corps-of-engineers-nashville-district.


Contact
Public Affairs Office
615-736-7161
chief.public-affairs@usace.army.mil

Release no. 24-089

Chick Lock

Through deeds, not words, we are BUILDING STRONG®